Skip to main content
GullySystem
Manufacturing · Five-axis Machining Shop Management Software

One record for STEP models, posted G-code, fixtures, proof blanks and CMM colour maps.

Five-axis parts carry a long history. Every part keeps its STEP revision, the collision-checked toolpath, the post-processor build and the dovetail fixture it sat on. Programmers, setters and CMM operators open one record, while owners see where the CAM days and spindle hours went against the quote.

  • Part records, fixture list and quote rates entered the way your estimator already prices
  • Open jobs, toolpath records and billet stock migrated from your sheets
  • Proof-run steps and probing layouts adjusted by GullySystem staff on request

Shops that cut impellers, blisks, hip stems and turbine brackets in one or two setups record each part’s STEP revision, collision-check result, posted G-code, datum scheme and CMM report here. Programmer days and spindle hours are costed against the quote. CAM and metrology software stay exactly where they are.

Where it breaks today

What goes wrong before the software.

Programming time is spent but not priced

A programmer spends days blending the fillet between blisk airfoils in CAM, yet the quote carries only spindle hours. That labour never reaches a report.

Proved code and posted code differ

A post-processor update lands after the collision check was signed. The controller then runs G-code nobody simulated, and a trunnion table can meet a clamp at full rapid.

The wrong model revision gets cut

Revision D of the STEP file sits in an email thread while revision C is already open in the CAM tree. A shift of cutting follows the superseded surface. Scrap follows too.

Proof runs consume costly blanks

First pieces eat Ti-6Al-4V forgings and Inconel 718 billets. Without a record, the write-off drifts into overheads instead of the part that needed it, and the next quote repeats the loss.

Workholding is rediscovered per job

The pallet, dovetail jaws, clamp set and probing cycle are planned again on every job, because the last setup lived in a setter’s notebook. A morning goes on rediscovering a datum scheme.

Axis accuracy checks have no schedule

Rotary pivot and tilt squareness checks happen when someone remembers. Drift shows at the CMM, after the billet is already chips. A ballbar trace would have caught it.

How it runs

How the work flows through it, step by step.

  1. 1

    Enquiry and feasibility

    A STEP model and drawing arrive. The estimator marks alloy, tolerance class, number of setups, tool reach into undercuts and whether the buyer wants CMM points or a blue-light scan comparison.

  2. 2

    Quote with programming

    Programming hours, proof blanks, spindle time and inspection are priced as separate lines. Old quotes stay on file, and a buyer can compare the first proof-blank price with the revised one.

  3. 3

    Programme and simulation

    The CAM file, the collision-check result and the post-processor build are recorded together. A reviewer approves the code before the setter sees it. Later edits reopen that approval.

  4. 4

    Workholding and probing

    The setter fits the pallet, records tool stick-out and touches off the datums with the probe. Work offsets, clamp positions and the probing cycle are stored with the part for the next batch.

  5. 5

    Proof run and production

    A first piece is cut in wax, modelling board or cheap aluminium, then the real forging goes on. Spindle hours, scrap and the blank written off are logged against the part.

  6. 6

    Inspection and delivery

    The CMM printout or scan-to-CAD colour map is attached to the lot. Delivery note and invoice follow in your own currency and tax rules, with programming shown as its own line when agreed.

Modules

What is inside.

Every module can be switched on, left out or changed to match how your team already works.

Enquiries and complex-part quotations

Quote separate lines for CAM programming, proof blanks, spindle time and inspection, and keep each revision until the buyer decides. Estimators price from earlier actuals.

Model and drawing revisions

Register every STEP, IGES and drawing the buyer sends, with its revision letter, date received and the jobs cut from it. Superseded files are marked, not deleted.

Programme and simulation records

Hold the CAM file name, collision-check outcome, post-processor build and reviewer. Edits made after approval are flagged. The setter receives only released code.

Zero-point and workholding library

Record pallets, dovetail jaws, vises, clamp sets, datum scheme, tool stick-out and the probing cycle for each part, so a repeat batch starts from a proved setup.

Proof pieces and blank usage

Log every proof run with its material, result and the blank written off. First-piece cost then lands on the quote, where the estimator can see it.

Spindle and programmer hours

Book CAM, proving and cutting hours by person and machine, then compare them with the quoted figures. The owner reads who is free before promising a date.

Material and forging stock

Receive Ti-6Al-4V, Inconel 718, 7075 aluminium and 17-4 steel blanks with their mill certificate, and issue them by lot so each delivered part names its heat.

CMM and scan reports

Attach airfoil profile, bore position and feature results to the lot, mark deviations against the model, and print the report the buyer asked for from stored readings.

Machine calibration schedule

Plan ballbar, rotary pivot, tilt squareness and spindle runout checks, store each result, and block new jobs on a machine whose check is overdue.

Delivery and invoicing

Parts ship with their certificates and CMM report. The invoice carries programming as a separate line when the buyer has agreed to it, and the delivery note matches the lot.

Solutions inside

The business modules it is built from.

Each one is also available on its own, or inside a system built for you.

  • Quote & Proposal Management

    Programming, proof blanks, spindle time and inspection are quoted as separate lines, and every revision is kept until the buyer decides.

  • Project Document Management

    STEP files and drawings are filed with revision letter and date, and each job names the exact version it was cut from.

  • Workflow and Approvals

    A toolpath cannot reach the setter until a reviewer approves the collision check, and any later edit to the code reopens that approval.

  • Resource Allocation

    Programmer time and spindle time are booked against each part, so the owner reads who is free before promising a delivery date.

  • Batch and Serial Tracking

    Billets keep their heat and mill certificate through issue, proof run and production, so every delivered part names its material.

  • Quality Control

    Airfoil and feature results are stored with the lot, deviations are marked, and the buyer’s report prints from the stored readings.

  • Asset AMC Tracking

    Pivot and squareness checks are scheduled per machine, results are filed, and an overdue check blocks new jobs from being loaded.

  • Invoice Management

    The invoice is raised from the delivered lot, with any agreed programming charge shown as its own line beside the machining.

Services

How we would put it in.

Setup, data migration, integrations and anything built on top.

Who uses it

One system, each person sees their part.

For CAM programmers

Register toolpaths with their collision-check results, see which STEP revision is in force, and release code to the setter once a reviewer approves it.

For setters

Open the fixture record, stick-out and probing cycle. Then book setup complete.

For metrology staff

Attach CMM points and scan colour maps to the lot, and mark deviations against the model. The buyer’s report prints from those readings.

For estimators

Quote CAM days, proof blanks and spindle time from past actuals, not from memory of a similar bracket.

For owners

See programmer hours, spindle utilisation, proof scrap and open quotations on one screen.

Reports

The numbers the owner asks for.

  • CAM days quoted against actual, by part
  • Spindle utilisation by machine
  • Proof blanks written off, by alloy
  • STEP revisions received and jobs affected
  • Airfoil and bore deviations by feature
  • Ballbar and pivot checks due and overdue
  • Enquiries priced, awarded or declined, by buyer
Good fit

Who this is built for.

  • Shops cutting impellers, blades and blisks for turbine and aerospace buyers
  • Orthopaedic implant and surgical instrument machinists
  • Mould insert makers and die shops using tilting rotary tables
  • Prototype houses handling titanium and nickel alloy billets
  • Contract machinists who bill CAM programming as its own line
Honest answer

When it is not the right choice.

  • A shop whose work is nearly all three-axis will be better served by the milling or VMC pages.
  • A single hobby-scale machine does not need job costing of this depth.
Made to fit

Adapted to your business before it goes live.

You are not handed a login and left to it. The product is set up around your records, your people and the tools you already use.

Quote structure

Programming, proof and inspection lines follow the way you present price to buyers, down to the order of the lines.

Programme release rules

Who approves a collision check, who may change a post-processor and what freezes a toolpath are agreed with your engineers.

Workholding list

The pallets, vises and clamp sets you own are entered with their datum schemes and the parts they suit.

Quality records

Lot traceability fields and report layouts are copied from your quality forms, then signed off by your inspector before they go live.

Opening data

Jobs on the machines, billets in stock and unpaid invoices are keyed in from your records, then checked by your estimator.

Works alongside

  • Email
  • WhatsApp or other messaging
  • Accounting export
  • Barcode labels
  • File server links
Common questions

Questions owners ask before a demo.

Does the system replace our CAM software?

No. CAM, collision-check and CMM software stay as they are. This system records which file, build and result belong to each part, and who approved them.

How does it stop an old model being cut?

Each part points to the current STEP revision. When a buyer sends a newer one, open jobs on the earlier model are flagged for the programmer to review.

Can programming be billed to the buyer?

Yes. Programming is a quote line with hours and a rate, and it can appear on the invoice when the buyer has agreed to pay for it.

Can proof pieces be costed?

Yes. A proof run records its material, time and result. The cost sits against the part, so the next quotation allows for the blank it consumed.

How are calibration checks tracked?

Checks are scheduled per machine and axis, and each result is stored. A machine with an overdue ballbar or pivot check is flagged before a new job is loaded.

Can we keep traceability for implant or aerospace work?

Material lot, toolpath version and inspection results sit on one record. Your quality team names the standard that governs each customer, and the fields are arranged to suit that.

What does onboarding involve?

Parts and fixtures are entered first, then open jobs. Programmers and setters practise on their own screens, and the office switches over only after they are comfortable.

What decides the price?

Machine count, logins and how much part history moves across. You see your own parts in a demo, then a written proposal arrives.

Wondering what it would cost? Share your requirements and an engineer will come back with a scope.

Book a demo

See Five-axis Machining Shop Management Software with your own data.

Tell us how you run things today. We’ll show you the parts that matter to you and say plainly what would need changing.

  • No obligation
  • A reply within one business day
  • Your details stay private

Start with your requirements

Seven short steps that tell us what you need. An engineer reads them before getting in touch.

Share your requirements