Quotations for AC Installation and Service Enquiries

Enquiries for a new installation, a replacement or a service contract are logged with the customer and the site. A quotation is then built from your own price list of units, piping and labour.

From the first call to the quotation

Enquiry log

An enquiry records who asked, for which site, what they want and where it came from. A call, a walk-in and a WhatsApp message all go to one list.

Site visit notes

The person who visits notes room sizes, the position for the indoor and outdoor units, the pipe length and the power point.

Quotation lines

Units, copper piping by the metre, drain pipe, stands, cabling, breakers and labour are lines on the quotation. Each can be edited before it goes out.

Revisions

A customer who changes the tonnage or the number of units gets a revised quotation. The earlier version stays on file for reference.

Who uses it

The owner or a sales person prepares the offer. The coordinator keeps the list of open enquiries. Accounts see which were accepted, because those turn into jobs and invoices that must be raised.

Following up

Quotes with no reply stay on the open list. A reminder can go to the customer on WhatsApp or by email. Nothing is lost.

What the client decides

Your price list, your margin on units and your terms of payment are entered by you. The software does not suggest a price. It does not compare your rates with another contractor’s either, and the offer can be no more complete than the site notes behind it.

What a site visit has to measure

Estimators lose money on the things they did not see. A careful visit is the cheapest protection a contractor has.

Pipe run and route

The distance between indoor and outdoor units, and whether the route passes through a wall, a duct or a false ceiling.

Electrical readiness

Whether a power point and a breaker exist near the outdoor unit, or new cabling is needed.

Outdoor unit position

Balcony, terrace, wall bracket or ground stand. Each needs different material and sometimes a society permission.

Drain path

Where condensate goes. A drain that cannot fall naturally changes the job.

Access and working hours

Lift timings, floor height and apartment rules on drilling hours affect the number of days.

Presenting options without confusing the customer

Customers compare three offers made on three different bases. A clear quotation helps yours stand up.

Show what is included

Say whether piping up to a length, stand and basic cabling are inside the unit price, and what is charged beyond.

Offer alternatives as separate lines

A higher-star unit or an extra stabilizer can be listed as an option without rewriting the quote.

Print the terms

Advance, payment after fitting, warranty start date and what voids it belong on the page.

Points to settle in scoping

  • Whether quotations are built from a fixed price list or typed per job.
  • Who approves a discount, and up to what level.
  • How a quotation validity period is stated.
  • Whether an accepted quote should offer a service contract on the same units.

An enquiry from first call to accepted quote

A quotation begins with a phone call and ends with a signature or silence. Between the two, someone visits the site, someone prices the work and someone follows up. Four moments show who does each step and what is left on the record. Each step leaves notes.

The call that starts it

A shop owner rings about replacing two old window units. At the next step, the coordinator logs the enquiry with the customer and the site. A site visit is booked before the call ends, and the notes are ready for the visitor. The visitor arrives prepared.

Measuring at the site

The estimator reaches the shop and notes the pipe run, the outdoor unit position and the drain path. Photos are attached to the enquiry. The office sees the real site and not a guess from the phone.

Building the quotation

Back at the desk, the estimator picks units, piping and labour from the price list. Each line is clear. Two options are shown as separate lines so the customer can choose between them. Choice is visible.

Following up on the quote

A week later the coordinator reads the list of quotations without an answer. A short call is made and the reply is noted. Accepted quotations pass to installation. Declined ones stay on file with the reason.

Pricing and follow-up rules to agree

A price list is easy to build and harder to keep consistent. The owner settles four things with the estimator before the first quotation is printed. Each affects what the customer reads and what the firm can defend. Keep it consistent.

Who owns the price list

Name the person who may change unit prices, piping rates and labour charges. A rate changed in a hurry reaches every quotation after it. Staff can ask for a change. One person approves it. Approval takes one signature.

How long a quotation stays valid

Decide how long a printed quotation holds and print the date on it. Metal and part prices move. A customer who returns late should see an updated amount, not an argument. Dates prevent arguments. Print the date clearly.

What the terms page says

Agree the terms that print on every quotation, such as payment stages, what the customer arranges and the warranty stated by the supplier. Short terms in plain words are read. Long ones are ignored. Keep them brief.

When follow-up begins

Set the number of days after which an unanswered quotation is chased, and who chases it. A follow-up that nobody owns never happens.

Make an informed decision

Questions to settle before rollout.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Revisions

Which version applies to work that has already started?

Use a revised example from “Revisions” in the demonstration. Identify work still using the earlier version before deciding which jobs should change.

Background reading: Odoo: controlled product changes

Quotations for AC Installation and Service Enquiries

Which assumptions stop being valid when the quotation changes?

For “Quotations for AC Installation and Service Enquiries”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.

Background reading: ERPNext: quotation terms

FAQ

Frequently asked questions

Can a quotation be sent from the system?

Yes. It can be shared as a document by WhatsApp or email, in the layout your business uses.

What becomes of an accepted quotation?

It turns into an installation job or a service contract, with the lines carried over, so the work is not entered a second time.

Can quotation terms such as advance payment be printed?

Yes. The terms you use, including any advance before the units are ordered, are set in the quotation layout.

Does it price a job from the room size?

No. You choose the units and lines yourself. A rule of thumb for tonnage by room size can be added to the notes if your team uses one.

Can I see which quotations are still open?

Yes. Quotes with no decision stay on the open list, with the date they were sent.

What if the customer asks for a cheaper unit?

A revised quotation is made, and the first one stays on file for comparison.

Can site photos be attached to an enquiry?

Photos can be added to the visit notes. Storage details are confirmed during scoping.

Where it fits

How this feature fits the system.

HVAC and AC Service Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and quotations

Sales staff log installation and service enquiries, then prepare quotations covering units, piping, electrical points and labour.

Estimate/Quotation Management

Service contracts and visits

Annual contracts list the units covered, the visits are scheduled, and renewals appear as the end date approaches.

AMC and Service Contracts

Technician schedule and routes

Dispatchers assign visits to technicians by area and day, so each person’s route is planned before the morning.

Technician Scheduling
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.