Skip to main content
GullySystem

Outside Workshop Accounts for Stone Dealers

Outside workshop accounts keep a running page for each polishing or cutting unit you use. Slabs sent out, pieces received back, job charges and payments due all sit under the workshop’s name. At any moment the owner can see what a workshop holds and what the yard owes it.

What a workshop account holds for the yard

Each outside workshop has its own page. It starts the day a slab leaves the yard and stays open until the pieces are back and the charge is settled. Each page shows one workshop only.

Slabs sent out

Every slab handed to the workshop is listed by number, with the job it belongs to and the day it left. The list is the answer to the question every owner asks. Where is that slab now?

Pieces received back

When finished pieces return, they are entered against the slab that went out, under its original number. Offcuts and kerf loss are recorded with them. A shortfall between slab sent and pieces back is visible on the account.

Job charges per workshop

Each job carries the charge the workshop quoted for cutting, edging or polishing. The charge is typed once, from the workshop’s own bill or rate. It then sits against that job. Cost is never lost between desks.

Payments due to the workshop

This page totals what is owed after charges, and lists the jobs behind the total. Overdue amounts show separately. The yard knows what to pay before the workshop rings to ask. Each line names its job.

Sending stone out and settling up

Outside work is hard to follow. Four situations show how this page keeps slabs, pieces and charges in step. They run from the vehicle leaving the yard to the final payment. Each is a real moment in the working week.

Loading slabs for the workshop

Dispatch plans a load for the polishing unit. Each slab is ticked off the list as it goes on the A-frame. The page shows them as sent, and the list doubles as the checklist at the gate.

A call about a missing slab

A call comes in. The workshop cannot find a piece. The yard manager opens its page and sees what it holds. Slab number, job and sending date settle the question in one look. Nobody walks the bays to check.

Pieces returned smaller

Finished pieces come back and the unit enters them. The difference between the slab sent and the pieces received is split into offcut kept and kerf or waste. Both figures show in the workshop view. A loss is seen early.

Checking the bill with the owner

At settlement the owner opens the page beside the workshop’s bill. Job charges are listed beside the pieces received. A bill that covers more slabs than were sent stands out and can be queried before payment.

What each person sees on a workshop page

Four people read the page: the owner, the unit, the accounts desk and the showroom. Each takes away a different answer. The screen shows each of them only what the work needs.

Owners and yard managers

They see every workshop with the slabs it holds and the amount due. Any workshop with stone sitting for weeks, or wastage above the rest, is easy to spot. Questions go to the right unit.

Cutting and polishing unit

Staff mark slabs as sent and pieces as received. They check each return against the job’s cut list. Offcuts and kerf loss are entered here, so the unit’s own bay and the outside workshop are measured the same way. Returns are counted.

Accounts and dispatch

Accounts read the charges and payments due. They export figures to the accounting package for the accountant. Dispatch plans loads to and from each workshop and uses the list as the checklist at the gate.

Sales staff and showroom

They see only whether a customer’s slab is at a workshop and when the job is due back. They can tell the buyer the honest position without ringing around or walking to the saw bay. No chasing needed.

Decisions to settle before workshops are added

An account is only as accurate as the habits behind it. Habits matter here. Agree the points below with the unit, the dispatch team and the owner. Do it before the first slab is sent under the new method.

Who adds and edits workshops

Decide who may create a workshop, change its rates and edit a charge. One option is to give that to the owner alone. Staff in the unit can then record movements without touching the money. Keep it plain.

What is left out for Outside Workshop Accounts

Decide whether small repairs and cash jobs need an entry. Cash jobs leave gaps. Agree how a workshop that supplies labour only, with no stone, is shown. Write down the rule so nobody improvises at the gate.

How slabs already out come across

Slabs sitting at workshops today are entered before the first day, each with its job and sending date. Ask each workshop for its list. The balance owed to each workshop goes in as an opening figure from your last statement.

Which report matters first for Outside Workshop Accounts

Begin with cutting jobs open by workshop. It lists the slabs each unit holds. Wastage on completed jobs follows once a few have come back and been counted. Read the first returned job by hand against the slab.

How workshop accounts connect to jobs and billing

This account is built from other features. It takes assigned work from cutting jobs, slabs from the register and loads from dispatch. It hands back finished pieces, wastage and amounts owed to the people who use them. Five named links carry the data between them.

  • Cutting and polishing jobs assign work to a workshop
  • Slab and block register shows each slab’s current location
  • Delivery and breakage plans the loads sent and returned
  • Area billing and invoices bill customers for the finished pieces
  • Accounting package export carries amounts owed to your accountant

Where workshop accounts stop

This page tracks stone and amounts. It does not pay the workshop, judge the quality of its work or negotiate its rates. Payment is made by you, outside the screen. Agreements on rates, damage and liability stay between the owner and the workshop. A yard that uses one workshop for a few slabs can keep a simple list.

FAQ

Frequently asked questions

How do I see what a workshop holds today?

Open that workshop’s account. Every slab sent and not yet returned is listed by number, with its job and the day it left. The total tells you how much stone is out of the yard.

Can several workshops be tracked at once?

Yes, each workshop has its own account. You can open one at a time or read cutting jobs open by workshop to compare them side by side. The same slab can never sit in two places.

Where do a workshop’s charges come from?

Charges are typed against each job from the workshop’s own bill or rate. They are not guessed or averaged. It adds them up and shows what is due, so the bill can be checked line by line.

What happens if pieces return smaller than expected?

The unit enters the finished pieces. The system splits the difference into offcut kept for stock and kerf or waste. Both show on the job and in the workshop view, so a loss is seen early.

Does the system pay the workshop for us?

No, you pay the workshop in your usual way. The page shows what is due and what is overdue. Figures can leave through the accounting package export, and your accountant records them. Nothing moves money.

Where it fits

How this feature fits the system.

Marble and Granite Dealer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Slab and block register

Slab 14 of lot 22 stays slab 14. A hold and a delivery both name that piece.

Batch and Serial Tracking

Site measurement and quotations

Kitchen top measurements become a quote with edges and a sink cut-out. Acceptance makes it a job.

Estimate/Quotation Management

Cutting and polishing jobs

The job lists the slab, the cuts and the polishing unit. It closes with pieces back and wastage.

Work Order Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements