Skip to main content
GullySystem

Maintenance and breakdown jobs for mining machines

Maintenance and breakdown jobs turns every fault and every service on a mine or quarry into a job with a name on it. A mechanic is assigned, parts and hours are noted, and the repair history stays with the machine. The next shift starts from that history.

What a repair job card records

Think of the card as the workshop’s unit of work. It is short. One card covers one fault or one service on one machine. It holds enough detail for a mechanic who was not there to pick up the story.

The fault or service raised

This card opens with the machine, the symptom and who reported it. A hydraulic hose leaking on Loader 03 is one job. A service due on a dozer is another. Both appear in the same list.

Mechanic and time spent

Each job names the mechanic who took it and the hours spent. A second mechanic can be added. Labour is then counted against the machine, and it feeds the running cost read from the equipment register.

Parts fitted and where from

Filters, hoses, bearings and tyres fitted are noted on the job. The storekeeper issues them against it. So the part, the machine and the repair are tied together, and a repeat failure is easy to see.

History kept on the machine

Every closed job stays on the machine it was done to. The history is short. It lists faults, parts and hours in date order. The next mechanic reads what was done before, rather than asking whoever remembers it.

A workshop day, fault to closed job

Jobs arrive from two directions. Faults come in from the cab, and services come due on their own. Both go into one queue for the mechanics. Four moments from an ordinary day show how that queue moves along, from the first report to the closed card.

A fault reported from the cab

The operator of Loader 03 reports a hydraulic fault before the shift ends. A job is raised against that machine. The supervisor sees it under repair at once. A spare loader is moved in. The operator goes home knowing the fault is written down.

A service comes due

Engine hours on a dozer reach the service interval. The service job is raised without anyone having to remember. The mechanic sees it in the queue. A time is booked when the dozer is least needed, perhaps between two benches.

The mechanic works the job

The mechanic takes the card and notes the hours as the work goes on. Each part fitted is recorded. Parts come out of the store against the job. The record is built while the work is fresh.

The job is closed at handover

When the fault is fixed, the job is closed and the machine returns to the working list. The history now shows the failure, the fix and the hours lost. Supervisors see the machine as ready.

Who raises, works and reads maintenance jobs

One repair passes through several hands. Operators raise it. Mechanics work it, storekeepers supply the parts, and supervisors and managers read the outcome. Each sees a different side of the same record.

For operators and drivers

Drivers report a fault from the cab before the shift ends. They need only the machine and a few words. That report becomes a job. Word of mouth in the canteen is no longer the way the news arrives.

For mechanics and storekeepers

Mechanics take breakdown jobs, record repairs and see service dates coming up for each excavator, dozer and dump truck. Storekeepers issue the parts against the job. Both work from one shared list, in the same words.

For shift supervisors

Supervisors see machines that are working, waiting or under repair. An open card explains why a truck is missing. They plan the shift around what is truly ready. The foreman is asked only when needed.

For owners and managers

Owners read machine availability and the services due across sites. Repeated faults on one machine show in its history. Costly repeats are easy to spot. A choice to repair, rebuild or replace then rests on recorded repairs.

Settling maintenance rules before launch

A job system works when everybody agrees what counts as one. Settle a few rules with the workshop foreman before the first shift. They are quick to decide. They are awkward to change once habits form.

Who may open or close jobs

Decide whether any operator can raise a job, and who may close it. Let drivers raise one. Let only the foreman close it. That way a machine is never marked ready before it truly is.

What gets a job

Decide the smallest task that earns a job. A topped-up grease point may not. A hose, a bearing or a filter change probably does. A clear line keeps the queue readable and the history honest for years.

How earlier repair history comes across

The machine list is copied from your registers. Repair notes in books or spreadsheets need a decision. Bring across the recent ones that guide current work. Older notes can stay in the book. Agree who reads them over before the first job is closed.

Which report matters first for Maintenance and breakdown jobs

Start with the open jobs and services due list. Compare it with the foreman’s own board for a week. When the two match, the board can come down. The list then takes over the job.

How maintenance jobs join the other features

This card sits between several records. It takes the machine and its service limit from the register, takes spares from the store and hands hours and cost on to the reports. Each link below is a place where one entry replaces a second entry made by hand.

  • Equipment register and hours raises service jobs at the limit
  • Fuel, spares and store issues parts against the job
  • Shift output and haul log shows delays caused by the fault
  • Crews, shifts and attendance records mechanic time spent on jobs
  • Reports and dashboards list jobs open and services coming due

Where maintenance jobs stop

The job records what the workshop does. It does not diagnose a fault, and it does not decide whether a machine is safe to run. That judgement stays with the foreman and the manager. Manufacturer service schedules and warranty claims remain between you and the supplier. A quarry with a single loader may be happy with a notebook kept in the cab.

FAQ

Frequently asked questions

Can an operator raise a breakdown job from the cab?

Yes, operators report a fault from a phone before the shift ends. The report becomes a job against that machine. Nobody retypes it. Mechanics see it straight away, and the supervisor sees the machine move to under repair.

Does a service job appear on its own?

Service intervals raise jobs of their own. The register holds the hour limit for each machine, and the job appears as that limit nears. A mechanic is then assigned and the date is planned with the supervisor.

Can several mechanics work on one job?

More than one mechanic can be added, each with the hours worked. Parts fitted are noted once, against the job. That gives the true labour on a repair. It does not rest on the foreman’s memory.

How do I see everything done to one dumper?

Open the machine. Its closed jobs are listed in order, with the fault, the parts fitted and the hours spent. A repeated hose failure or a tyre that keeps going shows up in that list.

Does it schedule the workshop automatically?

Not by itself. It lists open jobs and services due, and people decide the order. The foreman assigns the mechanic. The system keeps the record and shows what is coming, but it does not plan the bay for you.

Where it fits

How this feature fits the system.

Mining Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Equipment register and hours

Each loader, truck, drill and crusher is held with its operator, hours and service due date, so planners see what is available.

Fixed Asset Register

Maintenance and breakdown jobs

A job card records the fault, the mechanic, parts fitted and hours spent, and the repair history stays with that machine.

Job Cards

Fuel, spares and store

Diesel, tyres, bits and lubricants are booked in and issued against a machine, and an alert shows when a fast-moving spare falls low.

Stock Tracking and Alerts
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements