Crew Allocation and Attendance for Painting Contractors
Painters, helpers and mestris go to named sites each day, and the supervisor notes who turned up. Those days drive two numbers: what each person is owed, and what each job paid for labour.
Who is assigned where
Matching the crew to the stage
Painting is not one skill. Surface preparation is dusty and slow, putty needs a steady hand, and a good finish coat needs a painter who can cut clean lines. Exterior faces add scaffolding and height. Sending the same gang to every stage wastes the skilled men on scraping and spoils the finish when helpers are rushed. Plan the allocation by stage, then look for days when the putty team has nothing to do.
Marking attendance at the site
On a phone, the supervisor marks each person present, absent or half-day. A site with nothing marked by noon can be flagged to the owner. Marks sit with the site as well as the painter.
Gangs, daily hands and fixed crews
Painting firms mix three kinds of labour. Some painters are on the company’s own list and come every day. Some arrive with a mestri who negotiates for the group. Others are hired by the day for a rush. Each kind is paid differently and needs different handling in the record. Scoping should list every labour type you use now, because rules for a gang are not the same as rules for a single hand.
- Own painters paid by days present
- Mestri gangs paid as a group total
- Day hires added for one site
- Helpers and scaffolding hands at their own rates
What the record is used for
Pay comes from the marked days. So does the labour cost of a site. A quotation won at a labour rate that no longer fits is visible once real days are set against it.
Questions to ask about site attendance
Home painting sites are scattered and small. A flat has no gate register, and a shop may open only after closing time. That shapes what attendance tools can do.
- Can one supervisor mark several sites in a day?
- What happens when a site has no signal?
- How are late arrivals and half days recorded?
- Who corrects a wrong mark, and is the correction visible?
What the module leaves out
It does not decide who is a good painter or where the mestri sends the men. Fingerprint or face devices are outside the base setup. Whether they suit scattered home sites is a question we raise during scoping.
A painting crew’s day, site by site
A painting crew day starts before the site opens and ends only when wages are entered. The supervisor and the office both write into the same record. These moments show what is entered and by whom. Attendance is the key entry.
Agree the evidence before signing off this part.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
Who is assigned where
Which observation would change the proposed scope?
For “Who is assigned where”, observe someone completing the task with a representative example. Record where they stop, ask another person or re-enter information, then choose the smallest change whose result the team can verify.
Background reading: GOV.UK: researching user needs
Frequently asked questions
Can a painter work at two sites in a day?
Yes. Attendance can be split between sites by half-day, and each site carries its share of that person’s wage.
Can I see which crew worked on a particular site last month?
The site record lists every person marked there, with their days. That also helps when a client questions the labour on a bill.
Does a mestri’s gang get a single payment?
Where that is how you pay, the gang total is paid to the mestri and the split among the painters is noted. This is set up around your practice.
Can painters mark their own attendance?
It is possible by phone, but the supervisor marking it on site keeps the record closer to the work. Which way suits you is decided during set-up.
How do I handle a painter who arrives late?
Mark a half day or a full day according to your own rule. The board then keeps your rule in the record and not in memory.
Can I keep a list of painters I trust?
Each person sits on the list with a role and rate. You can pick from it when a new site needs hands.
What if I have no supervisor on a small site?
The mestri or the owner can mark attendance. Decide in scoping who is allowed, since each mark shows who made it.
How this feature fits the system.
Painting Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Enquiries and site visits
Enquiries are logged by address and type of work, site visits are scheduled, and unanswered quotations are listed for follow-up.
Lead ManagementQuotations and estimates
Interior, exterior, wood and metal work is priced from the rate card by area and number of coats, with the scope written out.
Estimate/Quotation ManagementCrew allocation and attendance
Supervisors assign painters, helpers and foremen to sites by day and mark who was present at which site.
Attendance & Time TrackingTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements