Skip to main content
GullySystem

Crew Allocation and Attendance for Painting Contractors

Painters, helpers and mestris are assigned to sites by day, and attendance is marked at the site. That one record feeds both the wages payable and the labour cost of each job.

Who is assigned where

The weekly board

A grid shows each crew against each site by day. The owner sees at a glance that one site has eight painters and another has none.

Mestris and their gangs

Many contractors work through a mestri who brings his own painters. The crew can be added as a gang under that mestri and paid through him.

Skills

A painter who does fine enamel work on doors, a helper who only sands, and a scaffolding hand are marked by role, so allocation matches the work at hand.

Leave and absence

A painter going to his village for a festival is marked unavailable for those days, and the board shows the gap before the site starts.

Marking attendance at the site

The supervisor marks each person present, absent or half-day on a phone. A site with no attendance by noon can be flagged to the owner. The marks are kept against the site, not only against the painter.

What the record is used for

Wages are worked out from the days marked. Site labour cost is read from the same days. A quotation won at a labour rate that no longer fits is visible once real days are set against it.

What the module leaves out

It does not decide who is a good painter or where the mestri sends his men. Biometric or face-based attendance devices are not part of the base setup. Whether they suit scattered home sites is a question we raise during scoping.

FAQ

Frequently asked questions

Can a painter work at two sites in a day?

Yes. Attendance can be split between sites by half-day, and each site carries its share of that person’s wage.

Can I see which crew worked on a particular site last month?

Yes. The site record lists every person marked there, with their days, which also helps when a client questions the labour on a bill.

Does a mestri’s gang get a single payment?

Where that is how you pay, the gang total is paid to the mestri and the split among the painters is noted. This is set up around your practice.

Can painters mark their own attendance?

That is possible by phone, but many contractors prefer the supervisor to mark it. Which way suits you is decided during set-up.

Talk to us

Tell us what you need.

Send a short brief and one of our engineers will come back to you within one business day.

  • No obligation
  • A reply within one business day
  • Your details stay private

All fields are required. A short description is enough.

Your details stay private. Privacy policyProtected by reCAPTCHA.