Skip to main content
GullySystem
Manufacturing · Pipe Fitting Manufacturer Management Software

One record from pipe heat to a marked, certified butt-weld elbow, tee or reducer.

Enquiries, size and schedule lists, mill pipe heats, push-forming runs, normalising loads, wall thickness checks, bevelling, marking and despatch share one record. Each lot carries its source heat, forming run and inspection readings, so an EN 10204 3.1 certificate draws from stored values rather than pasted ones. Cartons are packed against a lot and a heat. Shortages show before loading.

  • Sizes, schedules and grades entered as you quote them
  • Open orders and pipe balances brought over
  • Inspection limits agreed with your inspectors

Fitting makers that push-form elbows, tees and reducers keep orders, mill pipe heats, forming runs, normalising loads and inspection readings on one GullySystem record. A lot holds its source heat, forming die, thickness readings and certificate right up to the moment its cartons are marked. Nobody retypes a heat number.

Where it breaks today

What goes wrong before the software.

One price list misses long radius patterns

One plant may press elbows, tees, caps and reducers across dozens of sizes, schedules and grades, so a single price list misses long radius and eccentric patterns.

Source pipe is not recorded

Mill pipe arrives with a heat stamped on every length, but after sawing for forming the number is not carried onto the offcuts or the finished pieces. Nobody can name the heat for one carton.

Forming dies are unlogged

Mandrels and dies for each size wear and are reconditioned, yet nobody counts how many fittings each tool has formed before it is ground back. Thinning and cracks follow.

Furnace loads are described, not listed

A load sheet states the day’s soak temperature but not which lots stood inside the furnace, so treatment proof for one lot depends on memory. Nobody can rebuild the load later.

Marking errors reach the buyer

Size, schedule and grade are stamped or painted from a handwritten list, and a wrong mark on a carton of caps is found at the buyer’s warehouse. Returns follow.

Certificates take hours

Chemistry from the mill, lab results and treatment details are copied into one sheet by hand, and every retyped value risks a wrong digit. Hours go.

How it runs

How the work flows through it, step by step.

  1. 1

    Enquiry and quotation

    The buyer lists type, size, schedule, grade and end type, and the quote is priced from pipe weight, forming, normalising and testing hours.

  2. 2

    Order and lots

    Accepted orders are split into lots, each with a route of saw, form, normalise, bevel, pickle, check and mark. Routes differ by family.

  3. 3

    Pipe receipt

    Hot-finished pipe, welded pipe, plate or forged blanks are booked in with heat number and mill certificate, then issued to the lot against its route card. PMI readings are saved beside it.

  4. 4

    Forming and trimming

    Operators record pieces formed per die, mandrel and shift, along with scrap from cracks, thinning at the extrados or wrinkles on the intrados.

  5. 5

    Treatment and checks

    Lots go into furnace loads with soak temperature and time recorded, then samples are measured for wall thickness, angle, centre-to-end and out-of-round. A failed lot waits for a decision.

  6. 6

    Marking, packing and despatch

    Marks and certificates are printed from the lot record, then cartons are packed, counted and shipped with a packing list that names each lot and heat.

Modules

What is inside.

Every module can be switched on, left out or changed to match how your team already works.

Enquiries and size lists

Log each enquiry with fitting type, size, schedule, grade and end type, and keep the buyer’s project reference and drawing number beside the quote.

Fitting quotations

Price from pipe weight, forming, normalising and inspection hours, with every change of grade, schedule or quantity kept as a numbered revision.

Fitting range register

Hold types, nominal pipe sizes, schedules, grades and end types, with bevel angle, root face and forming details for each pattern, long radius and eccentric included.

Raw pipe and blank heats

Book hot-finished pipe, plate and forged blanks by heat and mill certificate, and link each heat to the lots that it feeds.

Forming and die log

Record pieces formed per die, mandrel, press and shift, and count each tool’s use before it goes to the tool room for reconditioning, so wear is judged from the count.

Furnace load records

List the lots in each normalising or solution annealing load with grade, soak temperature and time, and attach the results to each lot.

Thickness and dimension checks

Save wall thickness, angle, centre-to-end, out-of-round and bevel readings per sample, and hold any lot that falls outside the schedule until someone signs a decision.

Pickling and outside processing

Track lots sent for pickling, passivation or shot blasting at an outside house, with counts out and counts back, and flag any lot that has not returned.

Marking and heat certificates

Print marks and certificates from stored chemistry and test results, one sheet per heat, so no value is retyped and a pasted figure never reaches the buyer.

Carton packing and shipment

Pack by lot and heat, print carton labels and packing lists, and close the order when the last carton is loaded.

Solutions inside

The business modules it is built from.

Each one is also available on its own, or inside a system built for you.

  • Estimate/Quotation Management

    Fittings are priced from pipe weight, forming, normalising and inspection hours, and a change of grade, schedule or quantity is saved as a numbered revision.

  • Batch and Serial Tracking

    Each lot lists the mill pipe heats it was built from, so a buyer’s question on one carton opens the matching mill certificate.

  • Work Order Management

    A lot opens with its saw, form and trim steps, and operators record pieces formed per die, mandrel and shift.

  • Quality Control

    Wall thickness, angle and centre-to-end readings are saved per sample, and a lot outside the schedule limit is held for a decision.

  • Job Work Management

    Lots sent for pickling or passivation at an outside house are counted on the way out and checked when they return.

  • Bill of Materials

    Each fitting type lists its pipe or blank, forming die, treatment and marking, so a repeat order draws the correct route.

  • Barcodes and Labels

    Carton labels print lot, heat, size, schedule and grade from the lot record, so the mark on the box matches the certificate.

Services

How we would put it in.

Setup, data migration, integrations and anything built on top.

Who uses it

One system, each person sees their part.

For the owner

See lots by stage, furnace loads, held lots and quotations waiting for a buyer’s reply, then ask what is late without walking the floor of the press shop.

For planners

Split orders into lots, assign dies and presses, and see which heat or furnace load is holding a lot back, before the buyer calls to chase it.

For forming operators

Read the fitting spec. Enter pieces formed per die and report cracks, wrinkles or thinning at the intrados the moment they appear on the press.

For the furnace operator

Write the lots into each load with soak temperature and time. Release them for checking once the cycle ends.

For quality staff

Enter thickness and dimension readings, hold lots outside limits and issue heat certificates from stored values, never from a pasted sheet.

Reports

The numbers the owner asks for.

  • Lots by stage and fitting family
  • Pipe heats with the lots built from each
  • Furnace loads with lots, soak and time
  • Wall thickness readings by lot and size
  • Die use and reconditioning due
  • Held lots with the cause of each hold
  • Shipments by order, lot and carton
Good fit

Who this is built for.

  • Plants push-forming butt-weld elbows, tees and reducers
  • Forged threaded and socket weld fitting makers who machine their own threads and bores, and who need each forging blank traced to its heat.
  • Stainless and alloy fitting producers who solution anneal their lots and pickle them before marking, with the furnace chart kept beside the lot.
  • Fabrication shops with a fitting section.
  • Makers supplying contractors.
Honest answer

When it is not the right choice.

  • A pipe supplier that only resells imported fittings, with no forming or treatment of its own, needs trading and stock software instead.
  • Valve work is closer to Valve Manufacturer Management Software.
Made to fit

Adapted to your business before it goes live.

You are not handed a login and left to it. The product is set up around your records, your people and the tools you already use.

Fitting range

Types, sizes, schedules and grades are loaded the way you quote them, with long radius, short radius and eccentric patterns kept apart as separate entries.

Forming routes

Sawing, forming, normalising, bevelling and pickling sequences are set for each fitting family, so a stainless tee never follows a carbon steel card.

Inspection limits

Each size and schedule gets its wall thickness and dimension limits, agreed with your inspectors before the first lot is released.

Certificate layouts

Heat certificate layouts follow what your customers ask for, including the mill chemistry block, the treatment line and the wording that their inspectors expect.

Currency and tax

Distributors and contractors in other countries are billed under their own currency and tax settings, reviewed with whoever signs off your accounts during implementation.

Hosting and edits

GullySystem hosts the system and changes routes, limits and forms when you ask, so the plant does not employ a programmer.

Works alongside

  • Spectrometer and lab data import
  • Email
  • WhatsApp
  • Accounting export
  • Label printers
Common questions

Questions owners ask before a demo.

Is raw pipe tracked to the finished elbow?

Yes. A lot names the pipe heats used, so a certificate request for one carton opens the mill sheet for those heats.

Can I count how many fittings a die has formed?

Operators enter pieces formed per die, and the die’s running count and reconditioning date are shown to the tool room before the next lot is loaded.

How are furnace loads recorded?

A load lists the lots inside with soak temperature and time, and results or notes are attached to each lot when the cycle ends.

What if thickness comes out under the schedule?

Each outcome for the held lot is logged: sorted, scrapped, re-formed or accepted on concession. The entry carries the decider’s name and the release date.

Can cartons carry heat numbers on labels?

Yes. Labels print lot, heat, size, schedule and grade from the lot record, so the carton mark matches the certificate.

Does it cover forged fittings?

Forged threaded and socket weld fittings are set up as separate types, with forging blanks, machining routes for bore and thread, and the class rating on the mark.

What drives the quote?

Presses, users and fitting families set the figure. Share your requirements with a few of your elbows, tees and reducers, and the quote is built around them.

Can pipe stock be loaded from our sheets?

Pipe lengths, heats and balances are imported from your sheet, and a small sample is verified with your store staff before the full list is loaded.

Who changes certificate formats?

GullySystem staff update the layouts on request. Past certificates keep the layout they were issued in, so an old copy never changes.

Wondering what it would cost? Share your requirements and an engineer will come back with a scope.

Book a demo

See Pipe Fitting Manufacturer Management Software with your own data.

Tell us how you run things today. We’ll show you the parts that matter to you and say plainly what would need changing.

  • No obligation
  • A reply within one business day
  • Your details stay private

Start with your requirements

Seven short steps that tell us what you need. An engineer reads them before getting in touch.

Share your requirements