Skip to main content
GullySystem

Maintenance Contracts for Plumbing Contractors

Some clients pay a plumbing firm a yearly sum to look after their building. Each contract keeps its visit schedule, its calls and its renewal date in one record.

What a contract record holds

Apartment associations, offices, schools and shops are the usual clients. Terms differ, so each contract has its own fields.

Scope and period

The building, the lines and fittings covered, the start and end dates, and whether parts are included or billed separately.

Planned visits

Scheduled rounds for overhead tanks, sump and motor connections, valves and common-area taps. Each round is a ticket with a due date.

Calls under contract

A complaint from a covered building is logged as a service call and marked as under contract, so it is not billed as a fresh repair.

Contract invoices

Invoices follow the payment terms in the contract, whether yearly, half-yearly or quarterly.

Writing scope so that it can be tracked

Most contract quarrels are about what was covered. Does a leaking tap washer count as maintenance or as a part? Is a chokage caused by tenants’ waste included? A short schedule that lists covered items, excluded items and response times prevents the argument. The record then holds those terms, and each call can be checked against them at the time it comes in.

Covered

Lines, valves, taps and tanks the firm agrees to look after.

Excluded

Damage by misuse, new works and parts above an agreed value.

Response time

How fast a covered call is attended, such as same day for a leak.

Renewal follow-up

The office sees contracts that end soon. A renewal list gives the client, the lapse date and the last amount billed. A call or a message can be made before the date passes. A contract that lapses is marked as such, and the building returns to being billed per call.

Reading the history

Calls under a contract are visible together. If one building keeps raising the same complaint, the owner can see it. Repeated blocked drains in one wing may point to a cause worth fixing, and the owner can raise it with the client at renewal.

Seasonal rounds in a society

Overhead tanks are cleaned on a cycle, motors are checked before summer, and valves are exercised before the rains. A calendar of such rounds, spread over the year, keeps the work from piling up in one month. Record who did each round, what was found and what the committee was told. A committee that sees a dated report asks fewer questions at renewal.

Round

Tank cleaning, pump check, valve check or a drain inspection.

Finding

What was seen, with a photograph.

Advice

What the committee should plan for, such as replacing an old gate valve.

Pricing a contract that you can serve

A yearly figure that looks attractive can lose money if the building has old pipes and a lengthy schedule of covered fittings. Before quoting, visit the site, list what you will look after, estimate how many calls a year it generates and note parts that will fail soon. The history from earlier contracts is the best guide. A contract record that shows calls per building per year helps set next year’s price on evidence, not guesswork.

What the client decides

The firm decides what each contract covers, how fast a covered call is attended to and what happens when the covered parts wear out. The software holds these terms. It does not draft the contract.

A year of one society’s maintenance contract

A maintenance contract is lived over a year, not signed once. The office, the plumbers and the client each touch it. This is how one housing society’s contract moves through its whole year in the building. It runs from signing to renewal.

Setting the schedule

On signing, the office enters the visit schedule, the scope and the renewal date. Four visits are set against the society’s blocks. The plumbers see their list from the start. Nobody has to ask when the next round is.

A routine round

A plumber attends the monsoon round, checks tanks and pumps, and notes what was found. The note is saved against the contract. The next visit reads from it. Small faults are caught before they turn into floods.

An emergency call

A resident rings about a blocked drain. The society’s history shows each call in one place. The committee can see the pattern for itself.

The renewal conversation

Before the renewal date, the manager opens the contract and reads the visits made, the calls received and what was found. The conversation with the committee rests on records. It does not rest on recollection.

Contract choices to settle before signing

Any contract record is only as clear as the scope behind it. Follow-up then becomes simple. The plumbers know what is expected on each round, and the office can check it.

What the scope covers

State which fixtures, pipes and tanks are included and which are extra. A clear list lets the plumber record what was done against it. The society sees what its yearly sum buys. Disputes shrink, and renewals become easier to discuss.

What an emergency call includes

Decide whether calls are covered within the yearly sum or billed on top. Money surprises sour a contract. They do so faster than any leaking pipe.

Who owns the renewal

Name the person who contacts the client before the date, and the number of days ahead. Renewals then stop depending on someone remembering.

Make an informed decision

Questions to settle before rollout.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Contract invoices

Can you explain the balance from its original documents?

Select a partly settled example in “Contract invoices”. Ask for the invoice, allocated receipts and remaining balance to be shown together before agreeing the opening figures.

Background reading: ERPNext: outstanding invoices

Renewal follow-up

What happens to existing dues when the next renewal is stopped?

For “Renewal follow-up”, test a cancellation near the renewal date. Agree the last service period and how any existing balance is handled before recurring work starts.

Background reading: ERPNext: recurring billing

FAQ

Frequently asked questions

Can one contract cover several buildings?

One contract can list more than one address, and the visit schedule is kept for each of them.

Are planned visits reminded automatically?

Visits come up as tickets with a due date for the office to assign. Reminders by message to the client are confirmed during scoping.

Does a contract call use the same ticket as a repair?

It is the same ticket, marked as covered, so the history of the building stays in one place.

Does it send the contract renewal to the client?

It can send a message or an invoice. The wording of the renewal, and any change in terms, is the firm’s to decide.

What should a plumbing maintenance contract say about parts?

Say plainly whether parts are included, billed at cost or billed above an agreed value. The record can then flag a covered call that needs a chargeable part.

Can a lapsed contract be revived?

A lapsed contract can be renewed from its record, and the gap period shows as billed per call.

Where it fits

How this feature fits the system.

Plumbing Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and site visits

Each enquiry is logged with source and address, the site visit is scheduled, and measurements and photographs stay with the client record.

Lead Management

Quotations and rate lists

Quotations are built item by item as a bill of quantities from the firm’s pipe, fitting and labour rates, with every revision and open quote kept.

Estimate/Quotation Management

Service calls and job tickets

A ticket is raised for each complaint, from a leaking tap to a blocked drain, then a plumber is dispatched and the repair billed.

Ticket Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements