Skip to main content
GullySystem

Plumber Attendance and Wages for Plumbing Contractors

Plumbers, helpers and gang leaders are recorded against the calls and sites they worked on. Daily wages, piece-rate pay and advances are worked out from that record at the month’s end.

Who works for the firm

A plumbing firm carries a mix of people. Some are on a fixed wage and some are paid by the job.

Plumbers and helpers

Each person has a record with a phone number, a skill grade and how they are paid. Helpers are attached to a plumber.

Gangs and subcontractors

A gang leader who brings a crew for a block of flats is entered as a team, with the rate agreed for the work.

Attendance by site

Attendance is marked against the site or the call where the person worked. A day split between two sites is shown as two entries.

Advances and deductions

An advance to a plumber is dated when given. A deduction for a broken tool is dated too, and both are cleared against later pay.

Working out what is payable

Daily-wage staff are paid from days present at the agreed rate. Piece-rate work is paid from the measured quantity, such as points fitted or metres laid, and overtime follows whatever rule the firm uses. At month end, one statement per person lists days, work, advances taken and the balance. Disputes are settled from entries. Memory is not needed.

Wages against jobs

Because attendance names a site, labour cost for each job is known. This sits beside material cost, so the owner reads what a bathroom block truly cost. A job that looked profitable on the quotation may turn out otherwise.

What the client decides

  • The pay basis for each person: daily, monthly or by the piece
  • Overtime and holiday rules, if the firm has them
  • How advances are recovered across months
  • Whether provident fund or ESI applies, which is for the firm’s advisor to confirm
  • Whether payment is by cash, UPI or bank transfer

How a plumbing gang is really paid

Plumbing labour is rarely one neat type. A firm may pay a fitter by the day, a helper by the month and a gang leader by the point.

Day rate with a skill grade

A senior fitter and a trainee helper earn differently, so the grade sits on the person’s record. Rates change when the owner changes them.

Piece rate by measured work

Pay follows points fitted or metres laid. The supervisor enters the quantity after checking it on site.

Lump sum for a block

A gang leader quotes one figure for a block of flats. The firm splits it across the crew the leader brought, if it wants that record.

Part days and travel

A half day at one site and a half day at another is common. Both entries are kept, because each site carries its own labour cost.

Attendance disputes and how they are settled

Most arguments about wages are about one missing day. A plumber says they came. The supervisor says they did not.

  • Each mark carries the site, the day and whoever entered it.
  • A correction is a new entry with a reason, so the first entry is not lost.
  • The statement lists every day counted, which lets a plumber check it line by line.
  • Advances taken in the month appear on the same page as the days worked.

Questions for the owner before wages are switched on

Pay practice differs between firms, even in the same town. Settle these points during scoping.

  • Are helpers paid by the firm or by the plumber they assist?
  • Does overtime start after a fixed number of hours, or only on Sundays?
  • Is a rate for a block of work final, or open to change when the plan changes?
  • Who confirms measured quantities before piece-rate pay is released?

Plumber attendance across a working week

Wages for a plumbing gang are decided one day at a time, long before payday. Each morning’s marking settles what is owed.

Marking the gang at first light

Marking takes minutes. The gang leader lists who arrived and the site each person was sent to, and helpers are marked under the plumber they work with. A name missing from the list stays absent until the office enters it with a reason.

A plumber moved between two sites

A call comes in and one plumber leaves a site at noon. The day is split between both jobs. Each job then carries its own share of the labour cost, and neither is overcharged for work done elsewhere.

The advance asked for on Wednesday

A helper asks for money before payday. Office staff enter it against the helper’s name with a date. It shows later on the pay sheet as a deduction, so nobody has to remember who took what, or when.

Saturday settling with the leader

Accounts prints the week’s sheet for each gang. The leader reads out days, piece-rate work and advances, and anyone may question a line. Corrections are made on the record itself. After that, the sheet is final and is filed.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Working out what is payable

Can a correction be traced to the right date and session?

For “Working out what is payable”, check a late correction against the original register. Agree who may amend it and which downstream total should change after the correction.

Background reading: Frappe HR: attendance records

What the client decides

Can the same receipt be allocated without counting the money twice?

Take an unallocated amount in “What the client decides” and apply it to the intended balance. Review the remaining amount and the original receipt reference together.

Background reading: ERPNext: payment allocation

FAQ

Frequently asked questions

Can plumbers mark their own attendance?

Yes, from a phone, if the owner wants that. A firm can let the supervisor mark it instead, and the setting is chosen with the firm.

Does it handle piece-rate work?

Yes. Pay is calculated on the measured work, such as fitting points or metres of pipe, at the rate agreed with the plumber or the gang.

Does the software run payroll and statutory filings?

No. It prepares wage statements from attendance and work done. Statutory deductions and returns belong to the firm’s accountant.

Can a plumber see their own wage statement?

Yes, where the owner permits it. A plumber sees their own days, work and advances, and nobody else’s.

What if a plumber works for two firms in a week?

The record shows only the days entered by your firm. Work done elsewhere is outside the system, and so is any agreement between the firms.

Can a gang leader see what the crew earns?

Only when the owner switches it on. Firms give the leader a view of the team’s own days and nothing about other gangs.

How are festival advances handled?

They are entered as advances with a date and a plan for recovery. The plan can span several months, and each month’s statement shows what remains.

Where it fits

How this feature fits the system.

Plumbing Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and site visits

Each enquiry is logged with source and address, the site visit is scheduled, and measurements and photographs stay with the client record.

Lead Management

Quotations and rate lists

Quotations are built item by item as a bill of quantities from the firm’s pipe, fitting and labour rates, with every revision and open quote kept.

Estimate/Quotation Management

Service calls and job tickets

A ticket is raised for each complaint, from a leaking tap to a blocked drain, then a plumber is dispatched and the repair billed.

Ticket Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements