Skip to main content
GullySystem

Quotations and Rate Lists for Plumbing Contractors

Quotations are built from the firm’s own rate list for pipes, fittings, sanitaryware and labour. Every revision is kept, so the figure the client saw first is never lost.

The rate list behind every quotation

A plumbing firm prices by the metre of pipe, by the fitting and by the point of work. The rate list holds these as the firm quotes them.

Pipes by type and size

CPVC, UPVC, PPR, GI and drainage pipes, each by diameter and length, priced as the firm buys and sells them.

Fittings and sanitaryware

Elbows, tees, valves, taps, mixers, closets and basins, with the make and size the client chose.

Labour by point or by running metre

Some firms charge labour for each point of a fitting, others by the metre of line. Both can be held, and a job picks one.

Rate dates

A rate carries the date it was set. Dealer prices move, so the office can see which rates are old before a large quotation goes out.

Building and revising a quotation

The office starts from the site visit note and picks lines from the rate list, and quantities come from the measurements taken at the site. A client who asks for a cheaper tap or a different pipe gets a new revision. The earlier version stays on file. A dispute about what was quoted then has a clear answer.

Following the quotation

Each quotation shows as sent, under discussion, won or lost. Open ones that have gone quiet appear in a follow-up list for the office to call. A won quotation becomes a job without retyping its lines. Material and labour quantities then carry into the job for comparison.

What quotation tracking does not do

The software prices from rates the firm enters. It does not fetch dealer prices on its own. Which rates to charge, how much margin to add and what to offer a regular builder are decisions for the owner alone.

What buyers expect to see on a plumbing quotation

A homeowner reads a quotation to learn what is covered. A builder reads it to compare against two other firms.

Scope in plain words

Which bathrooms, which lines and which fixtures are included. A line that says only “plumbing work” invites disputes later.

Brand and grade of material

Pipe class, fitting make and sanitaryware series are named, because a swap changes the price.

Exclusions

Chipping, tiling, core cutting and electrical work are done by others. The quotation says so.

Validity and payment stages

Rates move with the dealer, so a quotation states how long it holds and when each part is paid.

Keeping rates honest

A rate list goes stale quietly. Pipe prices shift, a dealer changes a discount, and nobody updates the sheet.

  • Each rate shows the date it was last set.
  • Rates are grouped by supplier, so one dealer’s change is edited in one place.
  • Two price columns can sit side by side, one for builders and one for homes.
  • A margin line is kept apart from cost, so the owner sees both.

Questions for a quotation tool vendor

Ask these before choosing any tool. Their answers show whether it fits a plumbing firm or only a generic shop.

  • Can I price by the point and by the running metre in one quotation?
  • Does an accepted quotation turn into a job with quantities intact?
  • Are old revisions kept, and can I print any of them?
  • Can a quotation carry optional items the client may drop?

Quotations through a plumbing firm’s week

Each person touches the rate list differently. Names are kept.

The estimator after a site visit

Entry takes seconds. Measurements from the visit are keyed against the rate list, with pipes, fittings and sanitaryware picked by name and labour added by the unit. The total builds up line by line, without a calculator on the desk.

Owner reviews the draft

Nothing leaves unread. Before the draft goes out, the owner may change a margin or a rate, and both the earlier and the changed figure are kept. Later, it is easy to see why this quotation cost more than the last.

Sending, then waiting on a reply

The quotation goes to the builder as a document and its status becomes sent. A reminder date is set. Three days on, the office sees it still waiting and telephones. That call can be what wins the work.

Revising after a builder’s call

The builder asks for a cheaper fixture brand. Estimators open a new revision and swap those lines only. The first version stays on file, so the figure first quoted can always be shown if anyone argues about it.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

What buyers expect to see on a plumbing quotation

Which assumptions stop being valid when the quotation changes?

For “What buyers expect to see on a plumbing quotation”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.

Background reading: ERPNext: quotation terms

Keeping rates honest

Which rule wins when two rates or offers apply?

Use “Keeping rates honest” to check an ordinary sale and one that meets two pricing conditions. Ask for the calculation behind each final amount, rather than only the total.

Background reading: ERPNext: pricing conditions

FAQ

Frequently asked questions

Can the same rate list serve homes and builder projects?

Yes. A firm can hold more than one price level, so a builder’s bulk work and a homeowner’s single bathroom are quoted from different columns.

How are GST amounts shown on a quotation?

As the firm sets them up. Which items carry GST and at what rate is a matter for the firm’s accountant, and the quotation follows that.

Can a quotation be sent over WhatsApp?

Yes. It goes as a document to the client’s number. Delivery through WhatsApp is confirmed during scoping.

Does an old quotation change when rates change?

No. A quotation keeps the rates it was priced with. A new revision picks up the current rates only if the office asks for it.

Can I add a rate for a fitting that is not on the list?

The office adds the item with a unit and a rate, and it is available to later quotations. A one-off item can be typed on the quotation itself.

How do I handle a client who wants three options?

Prepare three revisions or three option blocks in one quotation. The client’s choice is marked, and only that choice flows into the job.

Can the quotation show a bathroom-wise breakup?

Lines are grouped by flat, floor or bathroom, so a builder can see the price of each unit.

Where it fits

How this feature fits the system.

Plumbing Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and site visits

Each enquiry is logged with source and address, the site visit is scheduled, and measurements and photographs stay with the client record.

Lead Management

Quotations and rate lists

Quotations are built item by item as a bill of quantities from the firm’s pipe, fitting and labour rates, with every revision and open quote kept.

Estimate/Quotation Management

Service calls and job tickets

A ticket is raised for each complaint, from a leaking tap to a blocked drain, then a plumber is dispatched and the repair billed.

Ticket Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements