Skip to main content
GullySystem

Testing, Snags and Handover for Plumbing Contractors

Before a plumbing job is handed over, lines are tested and an inspection lists what must be corrected. Each test, snag and closure is recorded against the flat or floor it belongs to.

Tests on the lines

A water line is checked before plaster or tiles cover it. An entry shows that this was done.

Pressure and leak tests

The line tested, the date, who did it and the result are noted. A photograph of the gauge can be attached from a phone.

Drainage checks

Slope, flow and blockage checks on drain and soil lines are noted for each bathroom and each floor.

Retest after repair

A line that failed is linked to its repair and retest, so the history reads as one story.

Test before bill

The firm can require a test entry before a stage is marked complete. Whether to do so is a choice for the owner.

Snags at inspection

A builder’s engineer or the homeowner walks the site and points out defects. A loose tap, a slow drain, a damaged tile near a fitting or a missing cap goes on a snag list, with a photograph and the flat. The snag is assigned to a plumber and given a due date. It stays open until a supervisor marks it fixed. What remains before handover can be read off the list.

Handover

Once tests are done and snags are closed, the handover is logged with the acceptance date and the client who signed it off. Make and model of fittings can be listed there, along with the warranty terms the firm gives. A repair call that comes later links back to this handover.

What the client decides

Which tests are required, the pressure or duration a test must hold and the workmanship warranty are the firm’s own standards, or the builder’s. The software records them. It does not set them.

What a pressure test record should hold

A test that leaves no paper is a test the client can deny. Paper is what protects the firm.

Section tested

Which line, which floor, which flat. “Third floor bathroom” beats “bathroom”.

Test method and medium

Water or air, the pressure applied and how long it was held. The firm states its own specification, or the one in the builder’s contract.

Result and who witnessed

Passed or failed, with the plumber, the supervisor and sometimes the builder’s engineer named.

Photograph of the gauge

The gauge reading in a photo shows the number was not guessed.

Drainage checks and where leaks hide

Supply lines leak under pressure. Drains leak slowly and show up as damp patches months later.

  • Check joints at stack bends and floor traps.
  • Run water through every fixture before closing a ceiling.
  • Look for slope problems where water stands in a trap.
  • Retest after any chipping near a concealed line.

Questions about snag lists before you buy

Snags decide when final payment arrives. The tool should make them easy to list and hard to lose.

  • Can a snag carry a photo and a location?
  • Can the builder’s engineer add snags directly?
  • Can I see all open snags across a block?
  • Does closing a snag need a second person’s check?

Testing and snagging before a plumbing handover

The closing weeks of a plumbing job are busy with tests and corrections. Several people check the same flat. Order matters.

The plumber runs the test

Once a floor’s lines are fitted, the plumber records a test for each flat. The reading and the time are typed in. A line that fails is flagged at once, before walls are closed and tiles go over the problem.

Inspection day with the builder

Inspection is a long walk. The builder’s engineer goes through the floor calling out defects, and supervisors enter each as a snag against the flat and room. By evening the snag list for the whole floor is complete, with no reliance on memory.

Closing snags in order

Plumbers pick up their snags from a list for their own flats. Each is marked fixed with a date. A supervisor re-checks a few on site before the snag is allowed to close. Spot checks keep the habit honest.

The handover sitting

Accounts prints the closed list for each flat, with test records attached. The builder’s representative reads and signs. Anything still open goes onto a short list, agreed in the same sitting and dated, with a name against every line.

What the firm settles before snag lists begin

A snag list becomes unmanageable when nobody has decided how it works. A few rules agreed first keep the list useful through handover. Settle them with the supervisors before the first inspection is booked. Then write them down for everyone.

Who may close a snag

Decide whether the plumber who fixed it may mark it closed or a supervisor must confirm. Self-closing is quick but risky. A second person costs a little time and cuts disputes on handover day, when the builder is watching.

How a defect is described

Use fixed words. Agree wording for each type, such as dripping joint or poor slope, because fixed words make lists easy to sort and count. Free text alone makes it hard to see which fault keeps coming back across flats.

Which tests are always recorded

List the tests every job must have on file, such as line pressure and drain flow. A job missing one is flagged. Others can be optional, depending on the building and what its builder insists on.

Reading open snags at month end

Choose whether the owner reads open snags by flat, by plumber or by age. Age shows what has been left longest. Pick one view, and agree what happens to anything older than a set number of days.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Snags at inspection

Who decides whether a failed result blocks the next step?

For “Snags at inspection”, bring an accepted result and a failed one. Agree who can authorise an exception and what evidence must accompany that decision.

Background reading: ERPNext: inspection criteria

What the client decides

Can the test fail for the right reason when run on its own?

For “What the client decides”, agree the expected visible result and the starting records. Run the scenario independently, so another test cannot supply the state that makes it pass.

Background reading: Playwright: testing visible behaviour

FAQ

Frequently asked questions

Can snags be listed from a phone?

Yes. A supervisor can add a snag with a photograph while walking the flat with the builder’s engineer.

Can a client sign off on the handover?

Who accepted the work and when is noted on the entry. Whether a signed paper copy is also kept is a choice for the firm.

Does it follow any official testing standard?

No. It records the tests your firm or the builder requires. The standard that applies to a project is for the firm to confirm.

Are snags linked to billing?

They can be. A firm may hold the final bill, or part of it, until snags are closed, as the contract says.

What if a failed test is disputed by the builder?

The record shows the reading, the date and the witness. A retest is added as a new entry, so both attempts are on file.

Should the handover list include operating tips?

It can. A firm adds where the main valve is, how to clean aerators and whom to call. The handover note is printed and signed.

Where it fits

How this feature fits the system.

Plumbing Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and site visits

Each enquiry is logged with source and address, the site visit is scheduled, and measurements and photographs stay with the client record.

Lead Management

Quotations and rate lists

Quotations are built item by item as a bill of quantities from the firm’s pipe, fitting and labour rates, with every revision and open quote kept.

Estimate/Quotation Management

Service calls and job tickets

A ticket is raised for each complaint, from a leaking tap to a blocked drain, then a plumber is dispatched and the repair billed.

Ticket Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements