Skip to main content
GullySystem
Manufacturing · Precast Concrete Manufacturer Management Software

One system for element marks, casting beds, cube results, yard bays and erection loads.

Precast projects, element schedules, drawing revisions, rebar cages, embedded items, casting beds, cube tests, yard stock and trailer loads are held in one system. Each mark is followed from drawing to pour, from demoulding to bay, and from the gate to the crane. The steel shop bends cages from it, the crew pours to it and dispatch loads trailers by it. No one chases a mark.

  • Element types, moulds and casting beds entered the way the plant runs them
  • Project schedules and open marks migrated
  • Edits to element types and checklists made by GullySystem staff when asked

Precast plants run projects, element marks, casting beds, cube results, yard bays and trailer loads on Precast Concrete Manufacturer Management Software from GullySystem. Each mark carries its drawing revision, embeds and strength record to the site it ships to.

Where it breaks today

What goes wrong before the software.

Revisions are issued after cages are tied

A drawing moves from rev B to rev C while the old cage sits on the bed. Nobody notices until a tape is run along the finished unit. By then it is cast.

Embedded plates and inserts cannot be added after the pour

Cleats, sleeves and lifting anchors are checked by eye against a sheet. One omitted plate becomes a drilling job at height.

Demoulding follows the calendar

The crew strips moulds on a fixed day count because the cube result is on paper somewhere else. A weak unit chips at its lifting point. The crane stands idle.

Mould reuse is not counted

Steel and timber moulds wear with every cast. Nobody knows how many pours a mould has taken until a unit comes out of tolerance.

Yard bays hold unmarked stock

Racks of slabs and stacks of panels carry chalk marks that fade. Locating a mark means moving others. Every search ties up the crane.

Trailers leave in the wrong order

The erection plan wants columns first. The loader takes whatever is closest, and site cranes wait for the right piece. Hours are lost.

How it runs

How the work flows through it, step by step.

  1. 1

    Project and element schedule

    The planner loads the project and its list of marks with drawing number, revision, volume and weight. Delivery dates are set against the erection plan. The sequence is fixed here.

  2. 2

    Bed and mould allocation

    Marks are assigned to casting beds and moulds by date. The system shows how many times each mould has been used. Wear is visible.

  3. 3

    Cage, embeds and pre-pour check

    The steel shop makes the cage for the current revision. A checker confirms cover, embeds and lifting inserts and signs off before the concrete arrives. No sign-off, no pour.

  4. 4

    Pour, cubes and curing

    The pour is logged with mix and time, and cubes are cast for the element. Curing method and days are recorded until the cube result clears the unit for lifting.

  5. 5

    Demould, finish and yard

    The unit is lifted, inspected and repaired if needed, then placed in a numbered bay. Finishing and any coating are entered against the mark. Repairs are listed.

  6. 6

    Load, deliver, erect

    Trailers are loaded in erection order. The site signs for the marks received, and rejected units go back on the list. Nothing is forgotten.

Modules

What is inside.

Every module can be switched on, left out or changed to match how your team already works.

Projects and element schedule

Hold every mark for a project with drawing number, revision, weight, volume and planned delivery, and follow each from planned to erected.

Drawing revision control

Link each mark to its current revision, warn the bed when a revision arrives after the cage is made, and keep the superseded drawing on record.

Casting beds and moulds

Plan marks across beds and moulds by date, count pours per mould, and log repairs, liner changes and wear against each mould.

Rebar cage and embed checks

Record bar schedule, cover, plates, sleeves and lifting inserts per mark, with a named checker releasing the unit for the pour.

Concrete mix and cube tests

Record the mix, pour time and cubes cast per element, then show crush results against the lifting and delivery strength set for that type.

Curing and demoulding

Track steam or water curing by element and the hours elapsed, and block demoulding until the strength condition you set has been met.

Yard bays and stock

Place each finished mark in a bay or rack, search by mark number, and log repairs, patching and coatings done after demoulding.

Loading plans and delivery notes

Build trailer loads in erection order, check each mark at the gate, and print a delivery note listing marks, weights and the receiving engineer.

Site receipt and rejections

Record units accepted, rejected or damaged on arrival, with a reason, and send the rejected mark back into the casting plan.

Project billing

Raise stage invoices by marks delivered or erected, with the contract rate for each element type and the retention held by the client.

Solutions inside

The business modules it is built from.

Each one is also available on its own, or inside a system built for you.

  • Project Management Reports

    Every mark is listed under its project with weight, volume and delivery date, so progress from planned to erected reads from one page.

  • Document Management

    Each shop drawing is stored against its mark with revision letters, and a late revision raises a warning before the pour.

  • Production Planning

    Marks are placed on beds and moulds by date, so two elements never claim one mould and pour counts accumulate for each.

  • Quality Control

    A checker confirms cover, plates and lifting inserts against the shop drawing, and the pour is released only after a signed check.

  • Batch and Serial Tracking

    Each pour and its cubes are tied to the element mark, so crush results can be read for any unit that has shipped.

  • Stock Tracking and Alerts

    Finished marks are held by bay or rack with their age, and a search by mark number returns the location.

  • Vehicle and Trip Management

    Trailer loads follow the erection order, with each mark checked at the gate and weights summed against the vehicle’s limit.

  • Invoice Management

    Stage invoices are raised from marks delivered or erected at the contract rate, with retention shown beside each project balance.

Services

How we would put it in.

Setup, data migration, integrations and anything built on top.

Who uses it

One system, each person sees their part.

For owners and plant managers

Read marks cast against plan, yard stock, units awaiting a cube result and project billing without walking the beds.

For production planners

Allocate marks to beds and moulds, watch revisions land, and plan loads in the erection order the site gave.

For the steel shop and fixers

See the cage and embed list for the current revision of each mark and report a finished cage for checking.

For quality staff

Release the pour, record cubes and decide whether a unit may be lifted. Raise a non-conformance against a mark. Hold the load.

For yard and dispatch

Find a mark by bay, build the trailer in order and record the gate check.

Reports

The numbers the owner asks for.

  • Marks by status, project and bed
  • Cube results against lifting and delivery strength
  • Mould pour counts and repairs
  • Yard stock by bay, age and mark
  • Drawing revisions issued after cage fabrication
  • Deliveries by project, trailer and rejected marks
  • Stage invoices and retention by project
Good fit

Who this is built for.

  • Plants that cast beams, columns and slabs for building frames
  • Makers of wall panels and façade units
  • Factories producing hollow-core planks and floor slabs
  • Producers of manhole rings, culverts and drainage units
  • Plants that supply to a contractor’s erection programme
  • Yards that run steam curing and several casting beds
Honest answer

When it is not the right choice.

Made to fit

Adapted to your business before it goes live.

You are not handed a login and left to it. The product is set up around your records, your people and the tools you already use.

Element types and moulds

Beams, slabs, panels and drainage units, with their moulds, beds and lifting rules, are set up as your plant defines them.

Checklists

Pre-pour and demoulding checklists follow your own quality procedure and are reviewed with your technical staff.

Strength limits

Lifting and delivery strengths per element type are entered by your engineers, not assumed.

Project data brought across

Element schedules and open projects are loaded from the spreadsheets the planner uses today.

Tax and currency

Tax lines and currency on stage invoices follow the rules of each customer’s country.

Hosted by GullySystem

Planner, beds and yard all see one list of marks because GullySystem keeps the system hosted.

Works alongside

  • Spreadsheet import
  • Email
  • WhatsApp
  • Drawing file storage
  • Accounting export
  • Weighbridge entry
Common questions

Questions owners ask before a demo.

What if a drawing revision arrives after the cage is made?

The mark is flagged on the bed schedule the moment the new revision is loaded. The steel shop and quality checker see the flag before the pour, and the old drawing stays on file.

Can it stop a unit being lifted too early?

Demoulding is blocked until the strength condition you set for that element type is met. Your engineers decide the limit, and an override needs a named approver.

Does it count how often each mould is used?

Yes. Every pour adds to the mould’s pour count, and repairs or liner changes are logged. A mould nearing the wear limit you choose is shown on the planning screen.

How do we find a mark in the yard?

Each finished unit sits in a numbered bay or rack. Searching a mark returns its bay, age and condition, so the crane driver goes straight to it.

Can trailers be loaded to match the erection sequence?

Yes. The load list is built in the order the erection plan gives, and the gate check confirms each mark before the trailer leaves.

How are rejected elements handled?

The site records the mark and the reason. The unit returns to the casting plan as a repair or a recast, and its cost stays on the project account.

Is the project view shared with the contractor?

A limited view can be given to the contractor’s engineer. It shows marks cast, in yard, loaded and delivered. Cube results are shared only when you choose.

What does it cost, and what do I see first?

Price is set by beds, plants and users. We start by loading one of your casting schedules to show the flow, and the offer arrives in a document afterwards.

Can the plant take its records out later?

Marks, cube results and delivery history can be exported as spreadsheets. The column layout for those exports is fixed with you when the quotation is signed.

Wondering what it would cost? Share your requirements and an engineer will come back with a scope.

Book a demo

See Precast Concrete Manufacturer Management Software with your own data.

Tell us how you run things today. We’ll show you the parts that matter to you and say plainly what would need changing.

  • No obligation
  • A reply within one business day
  • Your details stay private

Start with your requirements

Seven short steps that tell us what you need. An engineer reads them before getting in touch.

Share your requirements