Skip to main content
GullySystem

Contract Billing for Facility Management Companies

The monthly bill for a site is built from deployed headcount, extra duties, consumables and any AMC work done. Nothing is typed afresh from attendance sheets at month end.

What goes on the bill

Each line traces back to an entry somebody made at a site. A bill queried in the second week can be opened and walked back to the duty, the indent or the complaint that put the line there.

Manpower by grade

Rate per grade against the strength delivered, counted from duties marked at the site.

Shortfall adjustment

Where a post stayed empty, the bill can carry a deduction on the basis your agreement states.

Extra duties

Double shifts, holiday duty and the extra hands your client asked for, each with its date and post.

Consumables and spares

Material billed over and above the rate, and spares used on breakdowns, drawn from the issue records.

Service lines

Annual contract charges for lifts, pumps or fire equipment, billed on the cycle the agreement names.

Cycle and references

Monthly or quarterly, with the work order number and the period covered printed on the bill.

Where manpower bills get disputed

Most arguments about a monthly facility bill come from the same few places. Sorting them out in software means the evidence is ready before the client asks.

Strength billed against strength delivered

Clients compare the headcount on the bill to their own gate register. A bill built from marked duties starts from the same facts.

Extra duty claimed without a request

Each extra duty line carries a date and a post, so a request from the client admin can be matched.

Rate revision applied from the wrong month

Each rate is dated from the month it begins, so earlier bills stay as issued.

Consumables above the allowance

Material over the contract allowance is listed with the issue entries behind it.

Raising and following a bill

The back office opens the month, checks the duty count per site and raises the bill. A copy goes to the client admin. Payment received is entered against it, so the ageing list shows which client has let two months run without settling. Part payments are allowed.

Tax lines, work orders and the client’s format

A client can want the work order number, the period and a sheet of attachments on every bill. Some want their own invoice layout. A few want different bills for each tower. All of this is settled with your accountant and the client admin ahead of billing, because the tax treatment of manpower and service lines is theirs to confirm.

What the client gets with it

The backing sheet matters as much as the figure.

  • Duties delivered against duties contracted for the period
  • Extra duty lines with the dates they were worked
  • Consumables billed over the contract rate
  • Maintenance rounds completed during the month
  • Complaints logged and closed at that site

Questions for a contract billing demonstration

  • Raise a bill for a site with two shortfalls and open one line to its duty.
  • Revise a sent bill and check that the first version survives.
  • Bill four sites on one invoice, then split it by site.
  • Enter a part payment and read the ageing list afterwards.
  • Export the bill backing sheet and attach it to an email.

What billing leaves to others

Tax treatment, the invoice format asked of you and the ledgers your client expects are not settled here. GullySystem prints what you set up. Accounting and filing the bill rests with your accounts team and auditor. Figures export for them.

Preparing a site bill through the month

A facility bill is built over the month, not on its last night. Each person who marks a duty or issues a carton adds a line without knowing it. Here is how the bill grows. Several people read it before it leaves the office.

During the month, at the sites

Supervisors mark attendance and raise extra duties against the client’s request. Consumables are issued from the godown. None of these people think of it as billing. Each entry still lands on the site’s bill for the month.

Three days before the cycle ends

The billing executive opens the draft for each site and reads the manpower lines against the contract schedule. A shortfall in one grade is spotted. The cause is traced to a post left uncovered. A note is added.

The operations manager’s review

The manager reads the draft for the biggest site. Extra duty lines are checked against the client’s emails. One is missing its request. It is held back from this bill and chased for the next one.

Bill goes out, reference attached

The bill leaves in the client’s required format with the work order number on top. The attendance summary travels with it. A copy stays on the site record, ready for the next conversation about payment.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Questions for a contract billing demonstration

Can you explain the balance from its original documents?

Select a partly settled example in “Questions for a contract billing demonstration”. Ask for the invoice, allocated receipts and remaining balance to be shown together before agreeing the opening figures.

Background reading: ERPNext: outstanding invoices

Tax lines, work orders and the client’s format

Is the plan based on demand that is still open?

Review “Tax lines, work orders and the client’s format” with an order that changes after planning. Check which material or capacity reservations need review before promising the revised completion date.

Background reading: ERPNext: production planning

FAQ

Frequently asked questions

Can one client receive a single bill for four sites?

Yes. Sites can be billed together on one invoice with a line per site, or separately, as that client prefers.

How is a shortfall deduction worked out?

On the basis written into your agreement, applied to the posts the attendance record shows as unfilled. Your office sets the formula.

Is payment tracked here?

Receipts are entered against the bill and ageing is shown per client. Bank reconciliation belongs with your accounts team.

Can a bill be revised after it goes out?

Yes. A revision is raised with its reason, and the earlier version stays on record for the query that follows.

Does it handle advance billing?

Yes. A site billed in advance for the coming month is handled, with duties reconciled on the following bill.

What if the client disputes the headcount?

Open the bill line and walk it back to the days and posts. Corrections to attendance carry a reason, so the revised bill shows what changed.

Can the bill carry the client’s own purchase order number?

Yes. The reference you set at the site record prints on each bill for that contract.

Are credit notes supported?

A revision can be raised with a reason. How a credit is shown in the invoice format your accountant approves is settled at set-up.

Can billing be locked after a month closes?

Yes. After the back office closes the month, site staff cannot alter its attendance. The back office can reopen it with a reason.

Where it fits

How this feature fits the system.

Facility Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Sites and contracts

Each client site is held with its blocks, posts, service scope, rate per category, billing cycle and the dates the agreement runs.

Contract Management

Attendance at the site

Staff mark in and out where they report, by phone with a photo and location, or through a device at the larger sites.

Attendance & Time Tracking

Complaint helpdesk

Residents, tenants and office admins log complaints by category, the desk assigns them with a reply time, and closure records the work done.

Helpdesk Automation
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements