Skip to main content
GullySystem

Lots, Shades and Grading in a Stone Yard

Lots, shades and grading let a stone yard show a buyer how closely slabs match. Slabs are grouped by the lot they arrived in and by shade grade, and bookmatched pairs stay linked. Sales staff, purchase staff and the owner read the same grouping when they sell, buy or review stock.

What lot and shade records hold for stone

A lot is the group one container or truck brought in. A shade grade is the yard’s own word for how a slab looks. Together they decide what a customer is told about matching pieces at the rack. Both live on the slab record.

Lot number and source

Every lot records the order it arrived against, the supplier and the slabs inside it. Lot 22 stays lot 22. Landed cost is kept per lot, so the margin on a whole parcel can be read later.

Shade grade scale

Grades are entered in the words your yard already uses for lighter and deeper casts of one stone. Fewer grades read better. Each slab carries one grade beside its lot, so a rack reads consistently from one end to the other.

Veining and match notes

Veining notes describe the direction and strength of the pattern on the face. The note lives on the slab record. It does not depend on a salesperson’s memory, so a buyer who wants quiet stone is shown quiet slabs.

Bookmatched pair links

Two slabs cut one after the other can be linked as a mirror pair. The link is visible from either record. One is never sold without its mirror, whoever is serving at the counter or on the phone.

Matching stone for buyers through the week

Grading earns its place at the rack. Here are four moments in a marble or granite yard where lot and shade records decide what is shown. They also decide what is held and what is bought next. Each is one person with one question.

Walking a lot with a buyer

A sales rep opens the lot and lists its slabs by grade. The buyer sees which pieces are closest in tone. Pieces sit side by side. Stone from one lot is pulled to the front of the A-frame rack.

Buyer asks for half a pair

The rep opens the slab and sees its mirror named on the record. That is the cue to explain the pairing. The hold then covers both pieces, so the match is kept for the site.

Grading at unloading

Purchase staff enter a shade grade as each slab is tagged and shelved. Later the yard manager walks the lot in daylight and corrects any grade that looks wrong. The correction is visible on the slab.

Questioning a slow lot

The owner opens stock by lot and shade on a quiet afternoon. One grade sits unsold on the racks. That stands out. The owner can then decide whether to offer it to builders or hold the price.

What each role sees on lots and grades

Lot and shade data answers a different question for each person. Four roles lean on it every day. Each sees the grouping that fits the job in hand, and none has to ask the yard.

Sales staff and showroom

They see slabs grouped by shade with free and held pieces marked. A pair link shows on both records. Veining notes appear beside the grade. They can find matching stone for a kitchen top without asking the yard.

Owners and yard managers

They see stock by lot, shade and thickness, with capital tied up in each lot. Margin and landed cost by lot sit alongside. Any lot that is nearly all held, or nearly all free, is obvious.

Purchase and import staff

They open a new lot when a container or truck is received and grade the slabs as they come off the vehicle. Cracks are noted against the lot. The supplier’s quality then shows over several purchases.

Accounts and dispatch

They read the lot and shade printed on a delivery note and an invoice line. A customer who queries the stone can be answered from the record, with lot and grade in hand. Dispatch loads pairs onto the same vehicle.

Decisions to settle before grading starts

Grades only help if every person uses them the same way. Agree these rules first. Settle them before slabs are entered, so the first weeks of records read as cleanly as the last.

Who may change a grade for lots shades and grading

Choose one person, such as the yard manager, to correct shade grades. Keep it to one. Sales staff add a note when a buyer disagrees. Every change is attributed, so a disputed grade has a clear history.

What is left out for lots shades and grading

Decide whether plain, single-colour stone needs a shade grade or only a lot. Some yards skip grading for offcuts as well. Write the rule down. Then the racks stay consistent, and a new hire grades the same way as the owner.

How existing lots come across for lots shades and grading

Your stock sheets give lot and shade for each slab already on the racks. They are entered before the first day. Gaps are listed for the yard manager. Pairs are linked by hand once, then kept linked automatically.

Which report matters first for lots shades and grading

Begin with stock by lot, shade and thickness, with slabs free and on hold. Keep it simple. It shows whether grades were entered the same way by everyone. Margin and landed cost by lot follow once the opening stock looks right.

How grading connects to the rest of the yard

Lots and shades sit above single slabs. They take stone from purchases and receipt. They hand a matching choice to holds, quotes and deliveries, so the site gets the stone the buyer saw at the rack. Stone comes in from receipt and goes out to the buyer’s site.

  • Slab and block register supplies each slab’s number and size
  • Imports and quarry purchases open each new lot on receipt
  • Yard reservations read the pair link before placing a hold
  • Site quotations name the lot a kitchen top is cut from
  • Delivery and breakage keeps pairs together on the same load

Where lots and grading stop

The system records a grade. It does not judge stone. A person at the rack decides what counts as a match, and daylight in the yard can differ from lights in the showroom. Buyers still need to look. A yard that sells one plain colour in a single lot can use the lot number alone.

FAQ

Frequently asked questions

Can two lots be compared side by side?

Yes, stock by lot and shade opens for two lots in turn. The rep reads out grades and thickness. The buyer still judges the match with their own eyes, standing at the rack beside the A-frame.

Who can see which slabs are bookmatched?

Anyone who opens either slab sees the link and the mirror’s number, even a new hire. A short note on the record says it is half of a pair. Staff at the counter cannot miss it.

Do shade grades follow the supplier’s own names?

Grades follow your yard’s words. Staff can note the supplier’s name for a shade beside the grade. That way a reorder from the same quarry is easy to match to what is already on the racks.

Does the lot record show cost as well as shade?

Yes, the lot keeps landed cost, which includes freight, duty and unloading crane hire. The landed cost and margin report reads that cost by lot. You can see which parcel paid and which did not. Check that first.

How do I see which lots are nearly sold out?

Open stock by lot and shade. Free slabs and held slabs are counted separately for each lot. Lots with few free pieces left are easy to see and can be reordered before a buyer asks for them.

Where it fits

How this feature fits the system.

Marble and Granite Dealer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Slab and block register

Slab 14 of lot 22 stays slab 14. A hold and a delivery both name that piece.

Batch and Serial Tracking

Site measurement and quotations

Kitchen top measurements become a quote with edges and a sink cut-out. Acceptance makes it a job.

Estimate/Quotation Management

Cutting and polishing jobs

The job lists the slab, the cuts and the polishing unit. It closes with pieces back and wastage.

Work Order Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements