Crew and Vehicle Allocation for Movers
Each move needs packers, loaders, a supervisor and a vehicle of the right size. Allocation puts named people and a numbered lorry against the day, instead of a plan held in someone’s head.
Who and what is allotted
Clashes and the day view
One lorry on two moves is the mistake this screen is built to stop. A vehicle already allotted on a date shows as taken, and so does a supervisor. The coordinator reads the day with every crew and vehicle in one column. A late unloading becomes visible before tomorrow’s morning is promised. Leave, a breakdown and a vehicle under service are entered so nothing is allotted against them.
Sizing a crew from the survey
A crew is sized from what the surveyor recorded, not from habit. Three questions decide most of it.
What allocation feeds
Peak days and thin weeks
Month end and school holidays pack the calendar. Overbooked crews are a common reason for rushed packing and later damage complaints. The allocation view shows how full a date is before a new booking lands on it. In a thin week it shows the opposite, idle lorries and packers on no job, which is the moment to chase quotations that went quiet.
Questions for scoping crew allocation
- Which of your packers can be sent out alone as a supervisor
- How you pay hired loaders, by the day or by the move
- Whether the driver of a hired lorry may be named before the day
- Who approves a change of crew on the morning itself
What the coordinator still decides
- How many loaders a flat and its staircase really need
- Which contractor to call when your own lorries are out
- Whether a crew does two small shifts in a single day
- Driver duty hours and rest, which stay a matter of your own rules
Allocation through a coordinator’s day
A coordinator’s day is mostly spent matching people and vehicles to dates. This page follows one day of allocation. It shows when each choice is made, who is told and what changes when a plan falls apart. A day rarely runs as drawn. The record changes with it.
Agree the evidence before signing off this part.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
Who and what is allotted
Which observation would change the proposed scope?
For “Who and what is allotted”, observe someone completing the task with a representative example. Record where they stop, ask another person or re-enter information, then choose the smallest change whose result the team can verify.
Background reading: GOV.UK: researching user needs
Frequently asked questions
Does it stop one lorry being booked twice?
Yes. The date shows that lorry as taken, and the coordinator has to free it before allotting it again.
Can hired vehicles be tracked the same way?
Partly. The contractor, rate head and driver number are held, but a GPS feed is available only on vehicles you own.
Do packers see the whole calendar?
No. A packer or supervisor reads only the moves allotted to them, and the owner decides whether more is shown.
Can allocation change on the morning itself?
Yes. A substitution is entered on the move, with the name of the person removed and the person who took the place.
How many people should a three-bedroom move have?
No fixed crew size fits every move. It depends on the stairs, the lift, the fragile pieces and the hours allowed, which is why the survey feeds the crew size.
Can one crew do packing on one day and loading on the next?
Yes. Packing day and loading day are separate allocations on the same move, so the same people or different ones can be named for each.
What happens when a lorry breaks down on the way?
The coordinator marks the vehicle as unavailable and allots a replacement, which can be a hired one. The move keeps the history of both vehicles.
Is a driver’s licence or contractor detail stored?
Whatever you decide to hold against a driver or contractor can be kept on their profile. The list of fields is agreed while scoping.
How this feature fits the system.
Packers and Movers Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Move enquiries and sources
Each shifting enquiry is recorded with origin, destination, date, flat or office size and the source of the call, whether a referral or a listing.
Lead ManagementQuotations and move estimates
The quotation is built from the survey list, with cartons, labour, vehicle, loading, unloading and storage shown as separate heads.
Estimate/Quotation ManagementCrew and vehicle allocation
Operations staff assign packers, loaders, a supervisor, a driver and a lorry or pickup to each move, marking hired trucks against their contractor.
Resource AllocationTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements