Skip to main content
GullySystem

Delivery and Carton Tally for Movers

At the new address every carton is called off the packing list before the crew leaves. Unpacking and reassembly are recorded, and the signature is taken with any shortage already noted.

The tally at the door

Carton by carton

Numbers are ticked as cartons come off the lorry, either read aloud from the list or scanned where labels carry a barcode.

Loose articles

Furniture, cycles and garden pots are counted against the loose-article list made at packing.

Shortages

Any missing number is marked short there and then, and the supervisor notes whether it was loaded at all.

Visible damage

A dented carton or a cracked glass top is photographed at the door, before unpacking, and the photograph joins the move.

Unpacking and putting back

A family that paid for unpacking expects beds standing and cartons cleared. The crew records which rooms were unpacked, which wardrobes were reassembled and whether an air conditioner was refitted or left for a technician. Empty cartons taken away are counted too, since some families ask to keep a few. Work the customer asked the crew to stop is written down with that reason.

Why the tally is the moment that matters

Most disputes begin at the door. A customer who signs a clean receipt and then finds a scratch has a weak claim, and a mover who never wrote down an exception has a weak defence.

Exceptions written on the spot

Damage and shortage noted before the signature are the strongest evidence either side can hold.

Same numbers as packing

Each carton is read against the list made at the pickup end, so a missing carton is a missing number, not an opinion.

Time at the house

Rushing at dusk misses things. The record shows when the crew arrived and left, which helps with waiting charges and with complaints.

Signature and what follows

Receipt on delivery

The customer signs on the phone or on a printed copy, and the tally as signed is what the office holds.

Balance payment

Extras actually used at delivery, such as a long carry or waiting time, go to billing from this record.

A claim, where needed

Shortage and damage marked here open the claim, so nobody has to rebuild the story from phone calls a week later.

When delivery is split or refused

Not every drop is clean. A flat may be locked, a lift may be booked for the next day, or a society may turn the lorry away. The tally can stay open across two visits, with each carton ticked on the day it came off. Goods taken back to the godown are logged with the reason, and the storage days that follow reach billing.

Questions to answer before the first delivery

  • Who in the family signs when the owner of the goods is away
  • Whether the crew may leave cartons in a room the customer chooses
  • How long the crew waits at a locked flat before returning
  • Which exceptions the supervisor may agree on the spot

What the tally leaves open

  • Settlement of a shortage is agreed with the customer afterwards
  • A barcode scan works only if a reader is present at the new address
  • A technician for appliance fitting may be yours or the customer’s
  • Whether a signature is taken on paper or on a phone is your choice

A delivery day from the lorry to the signature

A delivery is a sequence of small checks done in a hurry. This page follows the crew at the new address. It shows what is ticked, who signs and what the office learns before the lorry is back in the yard. Speed matters at the door. Every tick counts.

Opening the lorry at the door

The supervisor opens the lorry door with the packing list in hand. Each carton is called out by number and ticked as it passes the threshold. A missing number is spoken aloud. Nothing else comes in first.

Placing cartons room by room

Cartons are carried to the room named on their label. Each time, the crew marks which room each went to. In the same pass, the customer can find the kitchen boxes in the kitchen and not look for them through the flat.

Reassembling the beds and wardrobes

The fitter puts the bed frame and wardrobe back together and notes that each was done. A screw missing from a set is recorded then and there. On that screen, the customer sees the note before signing. The paper shows what was done.

The customer signs the tally

At the end the customer reads the tally, notes any exception and signs on the phone. The office receives it before the crew leaves. The final bill is issued from the signed record. Nothing is billed from a guess.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Receipt on delivery

Can the same receipt be allocated without counting the money twice?

Take an unallocated amount in “Receipt on delivery” and apply it to the intended balance. Review the remaining amount and the original receipt reference together.

Background reading: ERPNext: payment allocation

FAQ

Frequently asked questions

Can the signature be taken on a phone?

Yes. The customer signs on the screen, and a printed copy can be given where the family prefers paper.

What if delivery runs across two days?

This tally stays open. Cartons delivered on the first day are ticked, and the rest are called off when the lorry returns.

Are photographs needed at delivery?

Only where something looks damaged. Those pictures are what a later claim is read against, so crews are asked to take them.

Does the office see a shortage at once?

Yes, as soon as the supervisor marks it. The coordinator can call the loading end before the crew has left the house.

What should a customer do before signing?

Check cartons against the list, open anything that looks crushed, and ask the supervisor to write any exception on the tally. A signature on a clean tally is hard to dispute later.

Can a family refuse to sign?

Yes. The supervisor records the refusal and the reason, and the office follows up. The tally still shows what was delivered.

Is a barcode scan better than reading numbers aloud?

Scanning is faster on large moves and reduces reading errors. Reading aloud works for small moves and needs no hardware, so a firm can start there.

Where do empty cartons and packing waste go?

That is your policy. The crew can record how many cartons were taken away, which helps when a family asks later whether some were left behind.

Where it fits

How this feature fits the system.

Packers and Movers Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Move enquiries and sources

Each shifting enquiry is recorded with origin, destination, date, flat or office size and the source of the call, whether a referral or a listing.

Lead Management

Quotations and move estimates

The quotation is built from the survey list, with cartons, labour, vehicle, loading, unloading and storage shown as separate heads.

Estimate/Quotation Management

Crew and vehicle allocation

Operations staff assign packers, loaders, a supervisor, a driver and a lorry or pickup to each move, marking hired trucks against their contractor.

Resource Allocation
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements