Delivery and Carton Tally for Movers
At the new address every carton is called off the packing list before the crew leaves. Unpacking and reassembly are recorded, and the signature is taken with any shortage already noted.
The tally at the door
Unpacking and putting back
A family that paid for unpacking expects beds standing and cartons cleared. The crew records which rooms were unpacked, which wardrobes were reassembled and whether an air conditioner was refitted or left for a technician. Empty cartons taken away are counted too, since some families ask to keep a few. Work the customer asked the crew to stop is written down with that reason.
Why the tally is the moment that matters
Most disputes begin at the door. A customer who signs a clean receipt and then finds a scratch has a weak claim, and a mover who never wrote down an exception has a weak defence.
Signature and what follows
When delivery is split or refused
Not every drop is clean. A flat may be locked, a lift may be booked for the next day, or a society may turn the lorry away. The tally can stay open across two visits, with each carton ticked on the day it came off. Goods taken back to the godown are logged with the reason, and the storage days that follow reach billing.
Questions to answer before the first delivery
- Who in the family signs when the owner of the goods is away
- Whether the crew may leave cartons in a room the customer chooses
- How long the crew waits at a locked flat before returning
- Which exceptions the supervisor may agree on the spot
What the tally leaves open
- Settlement of a shortage is agreed with the customer afterwards
- A barcode scan works only if a reader is present at the new address
- A technician for appliance fitting may be yours or the customer’s
- Whether a signature is taken on paper or on a phone is your choice
A delivery day from the lorry to the signature
A delivery is a sequence of small checks done in a hurry. This page follows the crew at the new address. It shows what is ticked, who signs and what the office learns before the lorry is back in the yard. Speed matters at the door. Every tick counts.
Agree the evidence before signing off this part.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
Receipt on delivery
Can the same receipt be allocated without counting the money twice?
Take an unallocated amount in “Receipt on delivery” and apply it to the intended balance. Review the remaining amount and the original receipt reference together.
Background reading: ERPNext: payment allocation
Frequently asked questions
Can the signature be taken on a phone?
Yes. The customer signs on the screen, and a printed copy can be given where the family prefers paper.
What if delivery runs across two days?
This tally stays open. Cartons delivered on the first day are ticked, and the rest are called off when the lorry returns.
Are photographs needed at delivery?
Only where something looks damaged. Those pictures are what a later claim is read against, so crews are asked to take them.
Does the office see a shortage at once?
Yes, as soon as the supervisor marks it. The coordinator can call the loading end before the crew has left the house.
What should a customer do before signing?
Check cartons against the list, open anything that looks crushed, and ask the supervisor to write any exception on the tally. A signature on a clean tally is hard to dispute later.
Can a family refuse to sign?
Yes. The supervisor records the refusal and the reason, and the office follows up. The tally still shows what was delivered.
Is a barcode scan better than reading numbers aloud?
Scanning is faster on large moves and reduces reading errors. Reading aloud works for small moves and needs no hardware, so a firm can start there.
Where do empty cartons and packing waste go?
That is your policy. The crew can record how many cartons were taken away, which helps when a family asks later whether some were left behind.
How this feature fits the system.
Packers and Movers Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Move enquiries and sources
Each shifting enquiry is recorded with origin, destination, date, flat or office size and the source of the call, whether a referral or a listing.
Lead ManagementQuotations and move estimates
The quotation is built from the survey list, with cartons, labour, vehicle, loading, unloading and storage shown as separate heads.
Estimate/Quotation ManagementCrew and vehicle allocation
Operations staff assign packers, loaders, a supervisor, a driver and a lorry or pickup to each move, marking hired trucks against their contractor.
Resource AllocationTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements