Skip to main content
GullySystem

Service Catalogue Management for Pest Control

Service management defines each treatment you sell once, with its coverage, visit frequency, follow-up, warranty and rate. Quotes, contracts and schedules then draw on that definition.

Each treatment, defined once

General pest control, termite treatment, rodent control, mosquito fogging and bed bug work all differ. Five fields describe each of them.

Coverage

Which pests, which areas and which methods the treatment includes.

Frequency

How often visits repeat under a contract, such as monthly, quarterly or once.

Follow-up

A check visit after a set time, with the days counted from the first treatment.

Warranty

How long it lasts and what keeps it valid.

Rate

Price by area, by room count or by premises type.

Effect at the counter

The desk picks the treatment, and the visit plan, warranty and price come with it. A quote no longer needs a call to the senior technician. The same job is described the same way to every customer.

Pricing basis in pest control

Price residential work by flat size or number of rooms. Commercial work depends on built-up area, the kind of business and risk. Termite treatments may be priced by area treated or by running length of the building. Pick the basis that your market understands, then record it per treatment, so that a customer who compares two quotes sees the same logic. If you price differently for a flat and a hotel, record both rates under one treatment instead of making two treatments.

By area

A rate per square foot, with a minimum charge.

By premises

A fixed price for a flat of a given size.

By contract

A yearly figure that includes the set number of visits.

Reviewed across a season

  • Which treatments sell, and to which kind of customer
  • Callbacks by treatment, as a measure of whether it works
  • Treatments quoted often and closed rarely
  • Chemical use by treatment, read against what you charge

Changing a treatment later

Products change as regulations and supplier ranges change. A new gel bait may replace an older spray. When the catalogue entry is updated, new quotes use the new definition, while contracts already signed keep the terms the customer agreed. Decide with your senior technician who may edit a treatment and how old versions are kept. Ask who tells the desk that a product has changed, since the person who knows is out in the field.

Set-up effort

Setting this up takes one long sitting with your senior technician, agreeing what each treatment involves and when it repeats. That conversation is worth having whether or not a system exists.

Naming treatments so customers understand

Customers do not buy a residual spray with a two-stage gel placement. They buy cockroach control for their kitchen. Name each treatment in the words a customer uses, and keep the technical description in a second field for the technician. The same applies to warranty. Say what happens if the pest returns, how long the promise lasts and what the customer must do to keep it valid, such as sealing a gap or clearing a storeroom. Plain names reduce calls to the office and quarrels at renewal.

Questions before building the catalogue

  • How many treatments you actually sell today
  • Which have separate rates for homes and businesses
  • Which carry a warranty and what voids it
  • Who approves a new treatment or a price change

A treatment definition through its working life

A treatment is defined once and then used by several hands over the months. This is how a single entry, such as a termite treatment with its follow-up, is met by different people on different days. Each person meets the same definition.

Owner defines the treatment

The owner enters coverage, number of visits, follow-up gap, warranty and rate for a termite treatment. The definition is read aloud once and agreed. After that, nobody retypes these terms. The firm now has one source of terms. Everything after this point draws from it.

Desk quotes from the definition

A caller picks the treatment while on the phone with a customer. The rate and the warranty fill in on their own. The customer hears the same terms the technician will later see on the job. Both parties see matching terms.

Technician sees the scope

On the job the technician opens the treatment and checks coverage and follow-up. A question about the number of visits promised is answered on the phone, not by calling the office. Customers get a prompt answer.

Owner revises with a date

Old contracts keep the terms they were sold on. New quotes pick up the revised ones. Revisions leave a clear history.

What the owner fixes before the catalogue

A catalogue is easier to live with when a few decisions are settled before anyone enters a treatment. The owner works through them with the senior supervisor, because the answers shape every later quote. Each takes a moment to settle.

Who may edit a treatment

Only the owner changes rates, warranties and follow-up gaps. The desk may add a note but not a term. This keeps two customers from getting two different warranties on the same service. Warranty terms stay uniform.

How current contracts come across

For each running AMC, link it to the treatment it was sold under and its original terms. Do not rewrite them to match today’s rates. Old promises stay as they were made. Running contracts remain honest.

Which price basis is used

Decide whether each treatment is priced by area, by room count or by visit. Write the basis in the definition. A quote that mixes two bases is the likeliest source of a dispute. Plain bases avoid disputes.

Make an informed decision

Questions to settle before rollout.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Warranty

What proves that a planned task was actually completed?

Select an overdue entry in “Warranty”. Ask which work record closes it and what remains visible when the visit is postponed or only part of the job is done.

Background reading: ERPNext: maintenance plans

FAQ

Frequently asked questions

Can we price the same treatment differently for a flat and a hotel?

Yes. One treatment can carry several rates by premises type, so the desk picks the right one without inventing a new treatment.

What if we add a new treatment next year?

Add it to the catalogue with its coverage, frequency and rate. It is available for quotes and contracts from that date.

Do follow-up visits get scheduled on their own?

If the treatment defines a follow-up, the visit is laid out from the first treatment date and appears on the due list.

How many treatments should a pest control catalogue have?

As many as you sell in a distinct way, and not more. Start with six to ten and add as customers ask.

Does the catalogue hold the chemical used?

It can note the usual product class for planning. The product and dose actually used are entered by the technician on the job.

Can a price change affect running contracts?

Not unless you choose to change them. Signed contracts keep the rate the customer agreed to.

Where it fits

How this feature fits the system.

Pest Control Business Management System: the parts that work with this feature, the trades that use it and the ways to put it in place.

AMC contracts and renewals

Each annual contract stores its services, visit frequency, terms and end date, and a renewal list appears ahead of lapse.

AMC and Service Contracts

Technician dispatch and routes

Dispatchers assign jobs to technicians by area and group them into a route, and any change is pushed to the technician’s phone.

Technician Scheduling

Service reports and work orders

Every visit has a work order that the technician closes with the treatment given, chemicals used, photos and the customer’s sign-off.

Service Reports and Proof of Visit
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements