Skip to main content
GullySystem

Import and Quarry Purchase Orders for Stone Yards

Imports and quarry purchases give a stone yard one order for each container, truck or block. Freight, duty and unloading crane hire are recorded as landed cost. The stone is then received against the order, slab by slab, so every piece on the racks carries the cost of getting it there.

What a stone purchase order keeps on file

An order starts the life of every slab. It names what was bought, who sold it and what it cost to land. Receipt then turns the order into slab records that the rest of the yard can sell. Nothing reaches the racks without one.

Supplier, stone and load

The order names the supplier and the stone, and says whether the load is a container, a truck or a block. Marble from overseas and granite from a quarry sit in the same list. Quantities are agreed before the vehicle leaves.

Freight, duty and crane lines

Freight, duty and unloading crane hire go in as separate landed cost lines. Each has an amount and a note. Your adviser decides how duty is treated. It simply keeps the figures where the purchase team can see them.

Receipt slab by slab

Receipt is slab by slab. Lot, shade and size come from the caliper reading and the tag. Open lines show what has arrived against the order and what is still on the road. Cracks are marked on the spot.

Blocks and their later slabs

A block is received as one record, with its cost. The gangsaw splits it into slabs afterwards. Cost then passes to each slab by a rule you choose, and the order keeps the link back.

Buying and unloading through a working week

Purchase work is spread across three rooms. The desk, the yard and the accounts office each touch an order. Four moments show how it moves from a call with a supplier to slabs on the racks. Each is one person with one task.

Raising an order for a container

A purchase officer agrees a container of marble and raises the order. Supplier, stone and expected landed cost lines go in. Nothing is on the racks yet. Sales staff cannot sell what has not been received.

Unloading with the crane

The crane lifts slabs off the vehicle and staff measure each with a caliper. Lot and shade are keyed against the order. Crane hire is added as a landed cost line once the hire invoice arrives.

Marking cracks on arrival

Cracks and epoxy repairs are noted before shelving. A cracked slab is recorded against its lot and supplier, with a photo if the yard wants one. The note travels with the slab from then on.

Reading what a lot really cost

Once duty and freight are in, the owner opens landed cost and margin by lot. Some parcels surprise. A lot that looked cheap at the quarry gate can cost more than another once every line is added.

What each person sees on a purchase

Four people read an order. The buyer, the yard, the owner and the accounts desk each look for a different answer. The screen gives each of them the lines they need.

Purchase and import staff

They raise orders, receive containers slab by slab, record cracks and keep landed cost against each lot. Open orders show what is expected. Part-received loads are listed, so nothing is forgotten on the road or left unchecked at the gate.

Owners and yard managers

Capital sitting in uncut stone is easy to read here. Owners see landed cost by lot. They also see which orders are still open. Yard managers see what is due so the crane and the staff are ready.

Accounts and dispatch

Accounts read the order lines. Each cost line is listed with its note. Figures are exported to the accounting package for your accountant. Dispatch watches arrivals so loads out are not planned around stone still on the road.

Sales staff and showroom

Stock appears to them only once it is received and graded. They sell from the racks, not from an order. Quotes name real slabs. A container still on the road is not offered to a customer.

Decisions to settle before the first order

Orders are easy to raise and hard to tidy later. Agree them early. Sit down with the purchase team and your accountant before the first container is received in the new system.

Who may change an order for imports and quarry purchases

Decide who can edit an order once stone has been received against it. One option is to let only the owner change a cost line after receipt. Every edit is recorded against the person who made it. Keep it tight.

What is left out for imports and quarry purchases

Decide whether a local purchase of one or two slabs needs a full order. Agree whether insurance and clearing fees sit in landed cost or in the accounts. Put the rule in writing, on the set-up sheet. Decide it once.

How open orders come across for imports and quarry purchases

Containers on the water and trucks on the road are entered as open orders before the first day of use. Each carries its supplier, stone and landed cost lines so far. Stock sheets cover the racks.

Which report matters first for imports and quarry purchases

Begin with landed cost and margin by lot. It tells the owner whether prices were set with the real cost in view. Breakage by lot, supplier and carrier comes next. Check the first lot by hand against its invoices.

How purchases connect to the rest of the yard

Purchases are where stock begins. Almost every other feature reads something from them. This feature hands over lots and costs to the register. In return it takes back the damage notes that sales staff and delivery crews record later, so a supplier claim has evidence behind it.

  • Slab and block register receives each slab created at unloading
  • Lots, shades and grading opens a lot for every load
  • Delivery and breakage feeds back claims by supplier and carrier
  • Area billing and invoices read landed cost when margin is shown
  • Accounting package export carries order costs to your accountant

Where purchase orders stop

An order records what was bought and what it cost to land. It is not a customs tool. It does not clear a shipment or file anything with an authority. Duty rates, tax treatment and currency conversion stay with your adviser and your broker. A yard that buys a single truck now and then may be content with its existing paperwork.

FAQ

Frequently asked questions

Where does duty go on an import order?

Duty is entered as its own landed cost line against the order. The amount comes from your documents. How it is treated in the accounts is a question for your adviser. The line then flows into landed cost by lot.

Can an order be received slab by slab?

Yes, an order is received one slab at a time. Each slab is measured, tagged with lot and shade and checked for cracks. Balances are visible. The order shows how much of the load has been received and how much remains.

Does the supplier see the cracked slabs we record?

Cracks are noted against the lot and supplier, and the breakage report groups them by lot, supplier and carrier. You decide what to send and when. The claim itself stays between you and the supplier.

Do quarry block purchases follow the same order?

Yes, blocks use the same order screen as containers and trucks. The block arrives as one record. After the gangsaw, the slabs inherit a share of its cost by the rule you chose, so cost per slab is never a guess.

Can landed cost reach our accounting software?

Orders and their cost lines can leave through the accounting package export. Your accountant decides which entries are made and how stock is valued. Detail stays by lot. A query from the accountant is then easy to answer.

Where it fits

How this feature fits the system.

Marble and Granite Dealer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Slab and block register

Slab 14 of lot 22 stays slab 14. A hold and a delivery both name that piece.

Batch and Serial Tracking

Site measurement and quotations

Kitchen top measurements become a quote with edges and a sink cut-out. Acceptance makes it a job.

Estimate/Quotation Management

Cutting and polishing jobs

The job lists the slab, the cuts and the polishing unit. It closes with pieces back and wastage.

Work Order Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements