Skip to main content
GullySystem

Kitchen Design Drawings and Revision Records

Each layout drawn for a kitchen is kept as a numbered revision with the change it answers. The approved one is marked, so later work can be charged against it.

What a revision holds

A revision is more than a file. It carries why it exists.

The unit list

Base, wall, tall and loft units with their widths, heights and depths as drawn in that version.

Drawings and renders

Plan, elevation and the coloured views shown to the client all sit together, whatever software your designer draws them in.

The change asked for

A line in the client words, such as moving the hob off the window wall or adding a tall unit beside the fridge.

Who drew it and when

The designer and the drawing date are stamped on the revision. Nothing is overwritten.

Showing the design and getting approval

Renders can be sent to the client by WhatsApp or mail straight from the revision. When the client accepts a version it is marked approved, and that marking is what the quotation and the factory work order are built on. A change the client asks for after approval opens a fresh revision rather than editing the accepted one. The extra units or upgrades in it can then be priced on their own.

Who uses the drawing record

Designers

Draw each version, write the change it answers and attach the renders they have shown.

Owner

Sees the revision count on each project and which designs are waiting on a client reply.

Factory and site staff

Open the approved revision only, so nobody builds a shutter from a view that the client rejected last week.

Why revision counts get argued about

Clients feel a change is small. Showrooms know it is not.

No trade rule exists

Kitchen firms set their own limit on free revisions in the contract. Some include two rounds and charge for more, and others allow changes until approval.

Sign-off ends the free changes

A design signed off normally counts as final. Agree the sign-off point with the client before drawing starts.

Changes after cutting are costly

Once the design reaches the factory it is locked in practice, since board has been cut to it.

What a good change note says

The line written against a revision is what settles the argument months later.

Quote the client

Write what was asked in the client’s own words and who asked.

State what moved

Name the units that changed, in terms of width and position.

Say what it affects

Note whether the price, the hardware or the delivery date moves with it.

Comparing two revisions with a client

The comparison is the working tool at a showroom desk.

Side by side

Open the two renders next to each other with the notes underneath.

Price difference

Show the quote versions that belong to each, so the cost of a change is visible.

Decision logged

Whichever the client picks is marked, with the date and how they confirmed it.

How a showroom keeps drawings from piling up

Designers draw in different tools, so files arrive with odd names. The revision gives them a home. Each upload is tagged with the plan, the elevation or the render it shows, and the newest approved version sits at the top. Older drawings drop into a folded list rather than disappearing. When the client asks for the view from the second meeting, the designer finds it in seconds instead of scrolling through a chat group. Files are stored as they were uploaded and open as images or documents. Nothing is converted, which means nothing is lost, and nobody edits a drawing inside the system by accident.

What the module leaves to you

  • It is not drawing software; designs are drawn in your own tool
  • It does not judge whether a revision is chargeable
  • How many free revisions a client gets is your policy
  • Who may mark a revision approved is set at set-up

Design revisions through a client’s decision

A layout rarely settles in one drawing. This page follows one kitchen through three revisions, from first sketch to signed approval. It shows who draws, who talks to the client and who relies on the record afterwards. The record is short. Each revision stands on its own line.

The first drawing after measurement

Once that is done, the designer builds the first layout from the site sheet and saves it as revision one. The note says what the drawing answers. A two-wall kitchen with a tall unit by the door is one such case.

The client asks for a change

At the second meeting the client wants the hob moved to the island. Revision one stays on file. The earlier idea can be shown again if the client asks.

The showroom manager checks the price

A revision that adds units changes the cost. The manager opens the revision, reads the unit list and compares it with the previous one. The client hears what the change adds before agreeing to it.

The factory takes the approved drawing

Soon after, when the client signs, the designer marks revision three as approved. The production head sees only that one. Earlier drawings stay behind in the history. They do not trouble the cutting list. It reads only the approved one.

Make an informed decision

Questions to settle before rollout.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Kitchen Design Drawings and Revision Records

Which version applies to work that has already started?

Use a revised example from “Kitchen Design Drawings and Revision Records” in the demonstration. Identify work still using the earlier version before deciding which jobs should change.

Background reading: Odoo: controlled product changes

Showing the design and getting approval

What needs fresh approval after a record is changed?

For “Showing the design and getting approval”, change a material detail after approval in the demonstration. Agree the next responsible person and the evidence needed before the work can continue.

Background reading: ERPNext: approval transitions

FAQ

Frequently asked questions

Can design files from our drawing software be attached?

Yes. Drawing and image files upload to the revision, and the client sees only the views you choose to send.

Is an old revision deleted when a new one is drawn?

No. Every version stays on the project with its date, and the approved one is flagged.

How is extra work after approval handled?

It becomes a new revision. The added units are quoted separately, and your staff decide what is charged.

Can the client approve from a phone?

The client can confirm on a link or by message, and that reply is saved against the revision. A signed printout can be attached as well.

How many revisions should a client get free?

That is your policy. The record shows how many were drawn, so the number you promised sits beside the number used.

Can the client see rejected revisions?

Only if you send them. Factory and site staff see the approved one alone.

What if two staff draw different versions at once?

Every change becomes a numbered revision stamped with who made it and when. The designer in charge then marks which is current.

Can a revision be copied as a starting point?

Yes. A new revision can start from the last one, so only the changed units are retyped.

Where it fits

How this feature fits the system.

Modular Kitchen Business Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Showroom enquiries and site visits

Showroom staff record the client, the flat or site, the kitchen shape discussed, the referrer and the measurement visit that has been booked.

Lead Management

Quotations by unit and running feet

Quotes price each base, wall, tall and loft unit with finish and hardware, plus countertop, hood, hob and sink, and every version is retained.

Estimate/Quotation Management

Production job cards

Each unit gets a production job card following cutting, edge banding, drilling, assembly and packing, with the worker or machine noted at every stage.

Job Cards
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements