Kitchen Handover, Snag List and Warranty

Handover is a record, not a conversation on a chat group. Snags are listed, closed one by one, and the warranty details for the kitchen stay on file.

The snag list at handover

The supervisor walks the kitchen with the client and writes what they point at.

What the snag is

A shutter out of line, a chipped edge, a drawer that scrapes, missing silicone at the countertop joint or a laminate shade that does not match. Small things, listed anyway.

Where it is

The unit and the wall, so a carpenter sent two days later finds it without ringing the client. Location is never left vague.

Who will attend it

A carpenter or the hardware supplier, with a date promised to the client.

How it closed

What was done, the person who did it and the client confirmation. A photograph can be attached.

Warranty held with the kitchen

Hardware brand, model and the fitting date are kept per unit, along with the board grade and the laminate or acrylic code behind each shutter. A client who returns after two years with a failed hinge is matched to the exact fitting. No carton has to be opened. Where the brand runs a warranty, the claim and the reply are logged. What a brand accepts is between you and that brand.

After the kitchen is handed over

Service calls

A later complaint opens as its own visit on the same project, with the unit and the fitting named.

Balance payment

The last stage invoice is raised at handover. The snag list and the balance are read together.

Client messages

A closing message carries the warranty note and whom to call, by WhatsApp or by mail.

What to check on the walk-through

Inspect before the client signs, because faults found later are harder to prove.

Alignment and gaps

Shutter lines, gaps between doors and how evenly units sit against the wall.

Movement

Soft-close action, drawer glide and hinges that hold a door open.

Countertop

Level, joint finish and the fit of the sink and hob cut-outs.

Finish

Edges, laminate shade matching between shutters and scratches from fitting.

Writing the warranty down

A warranty is only as clear as what is stated.

Hardware is the maker’s cover

Brands cover their own hinges, channels and fittings under their terms.

Carpentry cover is yours

A warranty may cover bought-in hardware and leave the carpentry out, so state in writing which parts you cover and for how long.

Retention can be agreed

Some contracts hold a small final amount until snags are cleared. If yours does, the snag list drives the release.

Tracking snags to closure

Each snag moves through the same short path.

Logged

With location, photograph and the person it is assigned to.

Promised

A date given to the client.

Done

The fix recorded, with client confirmation.

Service calls years after handover

A client rings in the third year about a drawer that drags. Without a record, the showroom guesses which channel was fitted and which carpenter went. With one, the call opens a service visit on the original project. The unit, the hardware model and the fitting date are already there, so the right spare goes in the van. If the problem is a maker fault, the claim is raised with the brand and logged. If it is a worn part, the visit is billed under your own policy. Over time, the service history shows which fittings fail more, which helps the owner choose brands for the next quote.

What handover does not settle

  • It does not decide who pays for a snag caused by civil work
  • Warranty terms on hardware and boards belong to their makers
  • How long you attend free service calls is your policy
  • Replacement material is bought through the purchase module

Handover week from snag list to warranty

Handover is spread over a few days at the flat. This page follows the fitter, the supervisor and the client through one handover week. It shows who writes the snags, who closes them and when the warranty begins. The week is short. Each step is a dated entry on the file.

The walk-through with the client

The supervisor walks the kitchen with the client, opening each door and drawer. Every fault is entered as a snag against its unit. The entry is made on the spot. After that, a client who points out a gap sees it written.

Assigning the snag to a fitter

The showroom manager reads the list and assigns each snag to a fitter with a date. A scratch on a shutter goes to the factory for repair. A loose hinge is a quick fix. It waits for the next visit.

Closing the snag after the visit

After repair, the fitter marks the snag closed and the client confirms it. A snag the client disagrees with stays open. Nothing is closed on the fitter’s word alone. The client confirms each repair, and an entry is made on the file.

Starting the warranty record

When the last snag closes, the manager enters the handover date and attaches the brand warranty papers for hardware and appliances. A call a year later is answered from the file. Nobody searches through old messages.

Make an informed decision

Questions to settle before rollout.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Kitchen Handover, Snag List and Warranty

What proves that a planned task was actually completed?

Select an overdue entry in “Kitchen Handover, Snag List and Warranty”. Ask which work record closes it and what remains visible when the visit is postponed or only part of the job is done.

Background reading: ERPNext: maintenance plans

Balance payment

Can the same receipt be allocated without counting the money twice?

Take an unallocated amount in “Balance payment” and apply it to the intended balance. Review the remaining amount and the original receipt reference together.

Background reading: ERPNext: payment allocation

FAQ

Frequently asked questions

Can snags be added after the client has moved in?

Yes. A complaint weeks later joins the same project as a service visit, with the unit and fitting already on record.

Is the laminate code kept for a replacement shutter?

Yes. Brand, code and shade stay on the unit, so a matching shutter can be ordered years afterwards.

Does it chase the hardware brand for a claim?

No. It records the claim you raised and the reply you received, and the brand decides the outcome.

Can handover be signed on site?

A signature or a message confirmation can be taken and attached. Open snags stay listed after signing.

Should snags be written before or after the final bill?

Before. The list and the balance are read together so the client sees both on one day.

How long should rectification take?

That is your commitment. Whatever you promise is recorded as a date against each snag, and late ones show up on the owner’s list.

What is excluded from a typical warranty?

Damage from water at the sink base, misuse and changes made by others are common exclusions. Your own terms decide, and they should be written clearly.

Can the warranty card be generated?

A summary of brands, models and fitting dates can be printed from the project. The wording of terms is yours.

Where it fits

How this feature fits the system.

Modular Kitchen Business Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Showroom enquiries and site visits

Showroom staff record the client, the flat or site, the kitchen shape discussed, the referrer and the measurement visit that has been booked.

Lead Management

Quotations by unit and running feet

Quotes price each base, wall, tall and loft unit with finish and hardware, plus countertop, hood, hob and sink, and every version is retained.

Estimate/Quotation Management

Production job cards

Each unit gets a production job card following cutting, edge banding, drilling, assembly and packing, with the worker or machine noted at every stage.

Job Cards
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements