Kitchen Handover, Snag List and Warranty
Handover is a record, not a conversation on a chat group. Snags are listed, closed one by one, and the warranty details for the kitchen stay on file.
The snag list at handover
The supervisor walks the kitchen with the client and writes what they point at.
Warranty held with the kitchen
Hardware brand, model and the fitting date are kept per unit, along with the board grade and the laminate or acrylic code behind each shutter. A client who returns after two years with a failed hinge is matched to the exact fitting. No carton has to be opened. Where the brand runs a warranty, the claim and the reply are logged. What a brand accepts is between you and that brand.
After the kitchen is handed over
What to check on the walk-through
Inspect before the client signs, because faults found later are harder to prove.
Writing the warranty down
A warranty is only as clear as what is stated.
Tracking snags to closure
Each snag moves through the same short path.
Service calls years after handover
A client rings in the third year about a drawer that drags. Without a record, the showroom guesses which channel was fitted and which carpenter went. With one, the call opens a service visit on the original project. The unit, the hardware model and the fitting date are already there, so the right spare goes in the van. If the problem is a maker fault, the claim is raised with the brand and logged. If it is a worn part, the visit is billed under your own policy. Over time, the service history shows which fittings fail more, which helps the owner choose brands for the next quote.
What handover does not settle
- It does not decide who pays for a snag caused by civil work
- Warranty terms on hardware and boards belong to their makers
- How long you attend free service calls is your policy
- Replacement material is bought through the purchase module
Handover week from snag list to warranty
Handover is spread over a few days at the flat. This page follows the fitter, the supervisor and the client through one handover week. It shows who writes the snags, who closes them and when the warranty begins. The week is short. Each step is a dated entry on the file.
Questions to settle before rollout.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
Kitchen Handover, Snag List and Warranty
What proves that a planned task was actually completed?
Select an overdue entry in “Kitchen Handover, Snag List and Warranty”. Ask which work record closes it and what remains visible when the visit is postponed or only part of the job is done.
Background reading: ERPNext: maintenance plans
Balance payment
Can the same receipt be allocated without counting the money twice?
Take an unallocated amount in “Balance payment” and apply it to the intended balance. Review the remaining amount and the original receipt reference together.
Background reading: ERPNext: payment allocation
Frequently asked questions
Can snags be added after the client has moved in?
Yes. A complaint weeks later joins the same project as a service visit, with the unit and fitting already on record.
Is the laminate code kept for a replacement shutter?
Yes. Brand, code and shade stay on the unit, so a matching shutter can be ordered years afterwards.
Does it chase the hardware brand for a claim?
No. It records the claim you raised and the reply you received, and the brand decides the outcome.
Can handover be signed on site?
A signature or a message confirmation can be taken and attached. Open snags stay listed after signing.
Should snags be written before or after the final bill?
Before. The list and the balance are read together so the client sees both on one day.
How long should rectification take?
That is your commitment. Whatever you promise is recorded as a date against each snag, and late ones show up on the owner’s list.
What is excluded from a typical warranty?
Damage from water at the sink base, misuse and changes made by others are common exclusions. Your own terms decide, and they should be written clearly.
Can the warranty card be generated?
A summary of brands, models and fitting dates can be printed from the project. The wording of terms is yours.
How this feature fits the system.
Modular Kitchen Business Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Showroom enquiries and site visits
Showroom staff record the client, the flat or site, the kitchen shape discussed, the referrer and the measurement visit that has been booked.
Lead ManagementQuotations by unit and running feet
Quotes price each base, wall, tall and loft unit with finish and hardware, plus countertop, hood, hob and sink, and every version is retained.
Estimate/Quotation ManagementProduction job cards
Each unit gets a production job card following cutting, edge banding, drilling, assembly and packing, with the worker or machine noted at every stage.
Job CardsTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements