Reports for Modular Kitchen Owners and Managers
These reports come out of what the showroom and the workshop already enter. Nobody prepares a separate sheet when the month closes.
Reports on the front end
Where kitchens come from, and how far each one travels.
Reports on delivery and money
How the numbers are read
Each report opens on screen with filters for date, designer, showroom and stage, and the list can be exported to a spreadsheet whenever an owner wants it on paper. A figure can be clicked through to the projects behind it, so an owner who sees four kitchens stuck before dispatch can open those four. The dashboard carries a handful of counts. Figures move as the showroom and workshop enter their work.
Which numbers an owner should watch
Generic dashboards pile up figures nobody asked for. A kitchen showroom needs only a few.
Reviewing on a rhythm
Reports help when someone looks at them regularly.
Why a report disagrees with your memory
Entries drive every figure in the report.
From a figure to the kitchens behind it
A dashboard count is a starting point. Click four kitchens stuck before dispatch and the list opens with the stage each is in, the days it has waited and the reason noted. From there, the owner can act: ring the client about an unpaid stage, chase a laminate shade, or move a fitting team. The same applies to money. An overdue balance opens the invoices behind it. This drill-down habit changes the review meeting. Instead of asking people to recall what is stuck, the owner reads it from the screen and spends the time on decisions.
What the reports will not tell you
- They do not forecast next quarter or model demand
- They carry no industry benchmark to compare you against
- Profit per kitchen depends on how you load overheads
- Any report you need beyond this list is quoted on its own
Reports through a showroom’s week and month
This page follows a week and a month in a kitchen business. It shows who reads which report and what they decide after reading it. A fixed hour makes the habit.
Questions to settle before rollout.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
Design revisions per project
Which version applies to work that has already started?
Use a revised example from “Design revisions per project” in the demonstration. Identify work still using the earlier version before deciding which jobs should change.
Background reading: Odoo: controlled product changes
Quotations given, approved and closed
Which assumptions stop being valid when the quotation changes?
For “Quotations given, approved and closed”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.
Background reading: ERPNext: quotation terms
Frequently asked questions
Can project reports be exported?
Yes. Every list on screen can go out as a spreadsheet file, with the filters you applied still in force.
Does the owner get a daily summary?
Yes. A short message or mail with the counts you choose can be sent each morning, and the list of counts is settled with you.
Can material used be compared with the quote?
Yes, where purchase and issue entries are kept up to date. The report reads those entries, so the comparison depends on how carefully they were filled.
Are reports split by showroom?
Yes. Each showroom can be read on its own or together, and the owner sees both views.
Is there a benchmark to compare us with other showrooms?
No. Published benchmarks for the trade are rough and vary by source, so reports compare you with your own past months.
Can reports be scheduled?
Set a day and time, and a summary reaches you by message or mail.
Can each designer see only their own figures?
Yes, where you restrict it. The owner sees all.
Can I get a report that is not listed?
It can be scoped and priced. Check whether the request is only a filter on an existing report before building anything new.
How this feature fits the system.
Modular Kitchen Business Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Showroom enquiries and site visits
Showroom staff record the client, the flat or site, the kitchen shape discussed, the referrer and the measurement visit that has been booked.
Lead ManagementQuotations by unit and running feet
Quotes price each base, wall, tall and loft unit with finish and hardware, plus countertop, hood, hob and sink, and every version is retained.
Estimate/Quotation ManagementProduction job cards
Each unit gets a production job card following cutting, edge banding, drilling, assembly and packing, with the worker or machine noted at every stage.
Job CardsTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements