Skip to main content
GullySystem

Carcass Board and Shutter Finishes for Kitchens

Board grade and shutter finish are fixed unit by unit, from the lists your showroom actually sells. The choice then travels to the quotation and the cutting list.

Choices held against each unit

A kitchen rarely uses one material throughout. The record follows that.

Box board

Plywood grade, particle board or high density board with its thickness, chosen per unit so a wet area under the sink can differ from a loft.

Shutter finish

Laminate, acrylic, membrane, veneer or paint, with the code or shade name from the sample the client picked in the showroom.

Edge and profile

Edge band colour and thickness, and whether the shutter takes a profile handle, a J groove or a separate handle.

Internal finish

What lines the inside of the carcass and the back panel. Clients ask about this more than designers expect.

Countertop and skirting

Granite, quartz or sintered surface with its thickness and edge, plus the skirting material below the base units.

Working from your own sample list

Board grades, laminate ranges, acrylic shades and paint finishes are loaded as your showroom lists them, with the brand and the code on the sample card. A rate sits behind each one, so changing a shutter from laminate to acrylic changes the quote without anyone rebuilding it. Discontinued shades can be hidden from the list. Our staff add new ranges when you send them.

Where the selection goes next

Into the quotation

Each quoted line shows the unit, the board behind it and the finish, so the client reads what the rate covers.

Into production

The cutting list carries board grade and thickness. The edge bander operator sees the band colour on the job card.

Into purchase

Board and laminate quantities for the project build into orders on your dealers, with shade codes written on the order.

What kitchen board and finish records leave out

  • Material advice and brand comparison are left to your designers
  • Warranty on a board or a laminate rests with its maker
  • Which ranges you stock and show is your commercial call
  • Rates behind each finish are loaded from your price list

How carcass and shutter choices split in a kitchen

The box and the face are bought separately and priced separately. Records should keep them apart.

Box board

Marine and boiling water proof plywood, high density board and MDF are the usual options. The wet base units near the sink are where the choice matters most.

Shutter face

Laminate, acrylic, PU paint, veneer and glass sit at different price points and need different upkeep.

Mixed choices

A kitchen may use plywood below the sink and another board elsewhere. Each unit holds its own entry.

Questions a customer asks about boards and finishes

  • Which board is used for base units near water?
  • Does a glossy finish show fingerprints?
  • Is the make and code written on the quotation?
  • Are other shades shown before ordering?

Writing the choice into the quotation

Dealer guides advise that the carcass material be named on the quote. The system does this automatically for each unit.

Material named

The board and the finish appear by name and code on every unit line.

Mix visible

If units use different boards, the quote shows it, and the customer sees what was agreed.

Change traced

Any swap made after approval is dated on the record, which gives the price change a visible cause.

Choosing boards and finishes across a project

A kitchen’s board and finish choices are made over several visits, not in one sitting. This page follows a project from the first showroom visit to the cutting list. It shows who picks, who checks and who reads the result. The choices are small. Each one reaches the price and the board cut.

The first visit at the showroom

The designer lays out sample shutters for the client and notes the carcass board and shutter finish for each run of units. A client who changes mind has no delay. The change is entered at once, so the quotation follows the choice.

Confirming a sample in hand

Before approval the designer checks that the selected shutter finish is in stock or on order. A finish that has stopped coming is flagged. The client picks again while the drawing is still open to change.

The factory reads the selection

The production head opens the project and sees the board grade per unit. Moisture-resistant board is listed for the sink base and plain board for the wall units. The cutting list follows those choices exactly.

A change after approval

The designer enters the change with a date and the price difference. The new finish reaches the factory in time. The sheet is cut only after the change is read.

Make an informed decision

Questions to settle before rollout.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Into the quotation

Which assumptions stop being valid when the quotation changes?

For “Into the quotation”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.

Background reading: ERPNext: quotation terms

Edge and profile

What happens when the connection stays down longer than the local buffer allows?

Test “Edge and profile” with a controlled disconnection. Check how missing readings, delayed uploads and storage limits are made visible before relying on the history.

Background reading: AWS: local stream storage

FAQ

Frequently asked questions

Can different units use different board grades?

The unit under the sink can take one grade while the loft takes another, and both print on the cutting list.

Are laminate codes stored?

Brand, code and shade name are kept, so a replacement shutter years later matches what was fitted.

Does changing a finish update the quotation?

It does, where a rate is behind that finish. The reissued quote gets its own version number, and the old one remains.

Can we load our own sample ranges?

The ranges you sell are entered at set-up, and our staff add later arrivals when you ask.

How do we record a customer who wants plywood only below the sink?

Select the plywood grade for those base units and a different board for the rest. The quotation shows each unit with its own material.

Are fingerprints and upkeep noted?

Upkeep remarks can be stored with each finish in your sample list, so staff repeat the same advice to every customer.

Do you advise on which board to choose?

No. The module records the selection your showroom and the customer decide. Advice rests with your designers and the board maker’s data.

Can samples be shown before a finish is chosen?

The sample card details held for each finish, such as brand and code, are shown to staff so the right card is picked up at the meeting.

Where it fits

How this feature fits the system.

Modular Kitchen Business Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Showroom enquiries and site visits

Showroom staff record the client, the flat or site, the kitchen shape discussed, the referrer and the measurement visit that has been booked.

Lead Management

Quotations by unit and running feet

Quotes price each base, wall, tall and loft unit with finish and hardware, plus countertop, hood, hob and sink, and every version is retained.

Estimate/Quotation Management

Production job cards

Each unit gets a production job card following cutting, edge banding, drilling, assembly and packing, with the worker or machine noted at every stage.

Job Cards
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements