Delivery and Installation Planning for Modular Kitchens
Packed units leave the factory only when the flat is ready to receive them. Each fitting visit records what went in and what is still pending.
Checking the site first
A readiness check is filled in before a vehicle is loaded. Tiling and false ceiling finished, electrical points pulled to the marked positions, water and drain lines in place, the lift working and the flat accessible. Each line is ticked by the supervisor who visited or by the client on a message. A site that fails the check is rescheduled, with the reason on record. That reason matters when a client later asks why fitting slipped.
Loading and reaching the flat
Recording each fitting visit
A visit record shows the date, who attended and which units were fitted. Carcass levelling, shutter alignment, countertop placement, chimney and hob fitting and final cleaning each sit as steps that get marked off. Work that could not be done is written with its reason, such as a countertop yet to arrive or a power point in the wrong place. Photographs of the finished walls can be attached. The client signs the last visit.
Why site readiness fails so often
A kitchen is fitted late in a flat’s finishing, so it inherits everyone else’s delays.
Countertop and appliance timing
Stone is the item most likely to hold up a finished kitchen.
Questions for the supervisor on the morning of dispatch
Five answers decide whether a vehicle should leave.
Who does what on a fitting day
The supervisor arrives first and checks the marked positions against the sheet. Carpenters unload in the order of the dispatch list, wall by wall, and the helper keeps hardware boxes with the unit they belong to. Base units go in first, levelled on the floor as it actually is. Wall units follow, then the tall units, because tall units sit against the finished run. The countertop fabricator visits after the carcasses stand. Before leaving site, the supervisor ticks the steps done, notes any shortfall with its reason and takes pictures. A client who walks in that evening sees the same record the owner reads.
What installation tracking does not do
- It does not arrange civil, electrical or plumbing work at the flat
- Vehicle hire and fuel accounting sit outside this record
- Live vehicle tracking needs a device and is scoped separately
- What counts as a ready site is agreed with your supervisors
A delivery day from factory to flat
Delivery is a long day with several hands on it. This page follows the supervisor, the loader and the fitter through one dispatch. It shows what is written at each point and what the showroom can see. The day is long. Each person leaves a short entry behind.
Agree the evidence before signing off this part.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
Checking the site first
Which observation would change the proposed scope?
For “Checking the site first”, observe someone completing the task with a representative example. Record where they stop, ask another person or re-enter information, then choose the smallest change whose result the team can verify.
Background reading: GOV.UK: researching user needs
Dispatch list
Can a partial delivery be distinguished from a completed order?
For “Dispatch list”, follow an example that leaves in more than one trip. Compare the quantity handed over with the quantity still owed before closing the order.
Background reading: ERPNext: delivery notes
Frequently asked questions
Can a kitchen be fitted over more than one visit?
Yes. Carcasses, shutters and countertop go in on different days, and each visit keeps its own record.
What if the site is not ready on the day?
The visit is marked not done with the reason, and a fresh date is set. The dispatch can be held back.
Are fitting teams scheduled?
Yes. Carpenters and helpers are booked against dates, so two flats are not promised the same team.
Can the client confirm the work on the spot?
The last visit can take a signature or a message confirmation, and that is stored before handover opens.
Who is responsible for the plumbing and electrical points?
Normally the client or the contractor handling the flat. The readiness check only records whether the points are in the marked places.
Can a partial dispatch be made?
Yes. Units for one wall can go first, and the list shows which ones still wait at the workshop.
Is a fitting visit scheduled around the countertop?
It can be. The countertop date sits on the project, and the later visit is booked after it.
Are photographs required at each visit?
They are optional but useful. A picture of each finished wall settles most arguments at handover.
How this feature fits the system.
Modular Kitchen Business Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Showroom enquiries and site visits
Showroom staff record the client, the flat or site, the kitchen shape discussed, the referrer and the measurement visit that has been booked.
Lead ManagementQuotations by unit and running feet
Quotes price each base, wall, tall and loft unit with finish and hardware, plus countertop, hood, hob and sink, and every version is retained.
Estimate/Quotation ManagementProduction job cards
Each unit gets a production job card following cutting, edge banding, drilling, assembly and packing, with the worker or machine noted at every stage.
Job CardsTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements