Delivery and Installation Planning for Modular Kitchens

Packed units leave the factory only when the flat is ready to receive them. Each fitting visit records what went in and what is still pending.

Checking the site first

A readiness check is filled in before a vehicle is loaded. Tiling and false ceiling finished, electrical points pulled to the marked positions, water and drain lines in place, the lift working and the flat accessible. Each line is ticked by the supervisor who visited or by the client on a message. A site that fails the check is rescheduled, with the reason on record. That reason matters when a client later asks why fitting slipped.

Loading and reaching the flat

Dispatch list

Packed units for the project are listed by wall, and each is ticked as it goes onto the vehicle. Nothing is loaded twice.

Vehicle and gate pass

The vehicle, driver and dispatch date are recorded, with a gate pass printed where the apartment asks for one.

Hardware and consumables

Hinges, channels, baskets, screws, silicone and edge touch-up material are issued against the project before the team leaves.

Fitting team

The carpenters and helpers going to that flat are named, with the days booked for them.

Recording each fitting visit

A visit record shows the date, who attended and which units were fitted. Carcass levelling, shutter alignment, countertop placement, chimney and hob fitting and final cleaning each sit as steps that get marked off. Work that could not be done is written with its reason, such as a countertop yet to arrive or a power point in the wrong place. Photographs of the finished walls can be attached. The client signs the last visit.

Why site readiness fails so often

A kitchen is fitted late in a flat’s finishing, so it inherits everyone else’s delays.

Trades overlap

Plumbing, electrical, tiling and painting teams all work in a small room. Fitters arrive to find a wet floor or a missing point.

Order matters

Rough electrical and plumbing come first, then wall finish and flooring, then units, then the countertop and the splash tiles. A step done out of order is chipped out later.

Paint needs time to cure

Some makers ask for plaster and paint to be finished a couple of days before fitting begins. Your supervisors know the interval your teams need.

Utilities belong to licensed trades

Showrooms do not connect gas, water or mains power themselves. The checklist says whose job each connection is.

Countertop and appliance timing

Stone is the item most likely to hold up a finished kitchen.

Templating follows the carcasses

A fabricator measures once base units stand level, so the date for it is only known after the first fitting visit.

Sink and hob models must be final

Cut-outs are made to the model. A change after templating means a fresh template and a wait.

Lead time is the fabricator’s figure

Ask them for the current schedule. The record keeps the date they promised so you can chase it.

Questions for the supervisor on the morning of dispatch

Five answers decide whether a vehicle should leave.

Is the lift or the staircase free?

Long tall units need a clear route.

Is anyone at the flat to receive?

Locked flats cost a day.

Are all walls marked?

Fitters work from the marked positions.

Is the hardware box complete?

A missing hinge stops a whole wall.

Who does what on a fitting day

The supervisor arrives first and checks the marked positions against the sheet. Carpenters unload in the order of the dispatch list, wall by wall, and the helper keeps hardware boxes with the unit they belong to. Base units go in first, levelled on the floor as it actually is. Wall units follow, then the tall units, because tall units sit against the finished run. The countertop fabricator visits after the carcasses stand. Before leaving site, the supervisor ticks the steps done, notes any shortfall with its reason and takes pictures. A client who walks in that evening sees the same record the owner reads.

What installation tracking does not do

  • It does not arrange civil, electrical or plumbing work at the flat
  • Vehicle hire and fuel accounting sit outside this record
  • Live vehicle tracking needs a device and is scoped separately
  • What counts as a ready site is agreed with your supervisors

A delivery day from factory to flat

Delivery is a long day with several hands on it. This page follows the supervisor, the loader and the fitter through one dispatch. It shows what is written at each point and what the showroom can see. The day is long. Each person leaves a short entry behind.

The supervisor’s morning call

Before loading starts, the supervisor rings the client or the building office and enters whether the flat is ready. A flat with wet paint is marked not ready. The load is held. The fitter’s day is moved and the client is told why.

Loading and the carton check

The loader packs carcasses, shutters and hardware, and the supervisor ticks each carton against the unit list. A missing channel box is found at the factory before loading starts. It is never found in a lift.

Fitting day one

The fitter unpacks and starts with base units. At the end of the visit, the fitter records what went in and what is left. The showroom manager reads the entry and sees the kitchen is part complete.

The pending list at evening

A shutter arrives chipped and is put aside. The fitter lists it as pending, with the unit and the reason. A replacement is requested the same day. The client does not have to ring the showroom first.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Checking the site first

Which observation would change the proposed scope?

For “Checking the site first”, observe someone completing the task with a representative example. Record where they stop, ask another person or re-enter information, then choose the smallest change whose result the team can verify.

Background reading: GOV.UK: researching user needs

Dispatch list

Can a partial delivery be distinguished from a completed order?

For “Dispatch list”, follow an example that leaves in more than one trip. Compare the quantity handed over with the quantity still owed before closing the order.

Background reading: ERPNext: delivery notes

FAQ

Frequently asked questions

Can a kitchen be fitted over more than one visit?

Yes. Carcasses, shutters and countertop go in on different days, and each visit keeps its own record.

What if the site is not ready on the day?

The visit is marked not done with the reason, and a fresh date is set. The dispatch can be held back.

Are fitting teams scheduled?

Yes. Carpenters and helpers are booked against dates, so two flats are not promised the same team.

Can the client confirm the work on the spot?

The last visit can take a signature or a message confirmation, and that is stored before handover opens.

Who is responsible for the plumbing and electrical points?

Normally the client or the contractor handling the flat. The readiness check only records whether the points are in the marked places.

Can a partial dispatch be made?

Yes. Units for one wall can go first, and the list shows which ones still wait at the workshop.

Is a fitting visit scheduled around the countertop?

It can be. The countertop date sits on the project, and the later visit is booked after it.

Are photographs required at each visit?

They are optional but useful. A picture of each finished wall settles most arguments at handover.

Where it fits

How this feature fits the system.

Modular Kitchen Business Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Showroom enquiries and site visits

Showroom staff record the client, the flat or site, the kitchen shape discussed, the referrer and the measurement visit that has been booked.

Lead Management

Quotations by unit and running feet

Quotes price each base, wall, tall and loft unit with finish and hardware, plus countertop, hood, hob and sink, and every version is retained.

Estimate/Quotation Management

Production job cards

Each unit gets a production job card following cutting, edge banding, drilling, assembly and packing, with the worker or machine noted at every stage.

Job Cards
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements