Production Job Cards for Modular Kitchen Work
Each approved kitchen becomes a set of job cards that the workshop builds from. Stages are marked as they finish, so the showroom knows what is ready.
From work order to cutting list
The approved unit list is turned into panels. Sizes come from the measurement sheet and your own allowances for filler, skirting and scribe. Board grade and thickness print beside each panel, and the edge band colour goes on the same sheet. Panels are grouped by board so a full sheet is used well. The list can be printed for the panel saw or sent out to a cutting supplier.
Stages a unit passes through
What the owner sees
Job cards roll up into a view of factory load. Kitchens waiting to be cut, units in assembly and projects packed and ready for dispatch each have their own count. A unit held up for a shutter finish that has not arrived shows against the project, not buried in a worker diary. Delivery dates can then be discussed with the client on the strength of the floor.
Why the order of stages matters
Each stage depends on the one before it.
Getting more from each board
Board is the biggest material cost in most kitchens.
Board grades the cutting list names
The card carries the grade so the wrong sheet is not picked.
What the factory in-charge reads each morning
The day starts with the list of kitchens waiting to be cut, ordered by promised dates. The in-charge checks that board for the first few has arrived, and that the shade codes match the cards. Units held up by a missing finish are flagged and a call goes to purchase. Operators receive the cards for their station and mark stages as they finish. By afternoon the count of units in assembly and units packed has moved, and the owner can see it without walking the floor. When a client rings, the answer comes from the cards, not from a guess about which kitchen is where.
What job cards do not do
- They do not run your panel saw or edge bander directly
- Machine time costing and worker piece rates are separate work
- Which stages you record is set from how your workshop runs
- Quality standards for a finish remain your own call
The workshop floor from approval to dispatch
A job card is worked by several people before a kitchen leaves the factory. This page follows one project on the workshop floor. It shows who cuts, who edges, who assembles and who tells the showroom it is ready. The floor has a sequence. Each step ends with a mark on the card.
Questions to settle before rollout.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
Edge banding
What happens when the connection stays down longer than the local buffer allows?
Test “Edge banding” with a controlled disconnection. Check how missing readings, delayed uploads and storage limits are made visible before relying on the history.
Background reading: AWS: local stream storage
From work order to cutting list
Is the plan based on demand that is still open?
Review “From work order to cutting list” with an order that changes after planning. Check which material or capacity reservations need review before promising the revised completion date.
Background reading: ERPNext: production planning
Frequently asked questions
What if panels are cut outside our workshop?
The cutting list is still raised, and it goes out as a purchase order to the panel supplier. Receipt of cut panels is then recorded.
Can two kitchens be cut together?
Yes. Panels from more than one project can be grouped by board, and each panel keeps its project and unit code.
Does a worker mark the stage on the shop floor?
Yes, where a tablet or a shared screen is placed in the workshop. Otherwise the factory in-charge updates the cards.
Are unit labels printed?
Labels can print from a label or barcode printer, and the model is confirmed when the workshop is set up.
Which board grade should a kitchen use?
That is your call and the client’s. Dealers commonly suggest a water-resistant grade near the sink, and the standard mark on the sheet tells you what you bought.
Can job cards be printed for the floor?
Yes, one card per unit with panel sizes, edge colour and hardware, and a label for each finished unit.
What happens when a panel is damaged?
A replacement panel is added to the card with a reason, so waste can be reviewed later.
Does it connect to a panel saw?
Not directly. The cutting list prints or exports as a file, and saw connections are scoped on their own.
How this feature fits the system.
Modular Kitchen Business Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Showroom enquiries and site visits
Showroom staff record the client, the flat or site, the kitchen shape discussed, the referrer and the measurement visit that has been booked.
Lead ManagementQuotations by unit and running feet
Quotes price each base, wall, tall and loft unit with finish and hardware, plus countertop, hood, hob and sink, and every version is retained.
Estimate/Quotation ManagementProduction job cards
Each unit gets a production job card following cutting, edge banding, drilling, assembly and packing, with the worker or machine noted at every stage.
Job CardsTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements