Skip to main content
GullySystem

Production Job Cards for Modular Kitchen Work

Each approved kitchen becomes a set of job cards that the workshop builds from. Stages are marked as they finish, so the showroom knows what is ready.

From work order to cutting list

The approved unit list is turned into panels. Sizes come from the measurement sheet and your own allowances for filler, skirting and scribe. Board grade and thickness print beside each panel, and the edge band colour goes on the same sheet. Panels are grouped by board so a full sheet is used well. The list can be printed for the panel saw or sent out to a cutting supplier.

Stages a unit passes through

Cutting

Panels are cut and tallied against the list. Offcuts worth keeping are noted.

Edge banding

Exposed edges are banded in the colour on the card, and the operator marks the stage done.

Drilling and hardware prep

Hinge, channel and dowel holes are drilled to the fittings recorded for that unit, which is why the hardware selection is fixed before cutting.

Assembly

Carcasses are put together, drawers made up and shutters matched. The unit gets its project label.

Packing and labelling

Units are wrapped and labelled with the project, the unit code and the wall they belong to. Labels can come off a printer.

What the owner sees

Job cards roll up into a view of factory load. Kitchens waiting to be cut, units in assembly and projects packed and ready for dispatch each have their own count. A unit held up for a shutter finish that has not arrived shows against the project, not buried in a worker diary. Delivery dates can then be discussed with the client on the strength of the floor.

Why the order of stages matters

Each stage depends on the one before it.

Cut accurately

Errors at the saw carry through every later stage, so the first check belongs here.

Band before drilling

Workshops edge band before drilling, because drilling an unbanded edge can chip it and shift hole positions.

Drill to the hardware record

Holes follow the brand and model on the unit, which is why hardware is fixed first.

Getting more from each board

Board is the biggest material cost in most kitchens.

Group by board

Panels of the same grade, thickness and finish are laid out together.

Allow for the saw

Cutting layouts allow for the width of the blade and any edge trim.

Respect grain direction

Patterned laminate must run the same way on neighbouring doors.

Keep useful offcuts

Pieces worth saving are noted for small units.

Board grades the cutting list names

The card carries the grade so the wrong sheet is not picked.

General purpose plywood

Covered by the Indian standard IS 303.

Marine grade plywood

Covered by IS 710 and chosen for wet areas such as the sink base.

Engineered fibreboard

Used by some workshops for carcasses and chosen on cost and finish.

What the factory in-charge reads each morning

The day starts with the list of kitchens waiting to be cut, ordered by promised dates. The in-charge checks that board for the first few has arrived, and that the shade codes match the cards. Units held up by a missing finish are flagged and a call goes to purchase. Operators receive the cards for their station and mark stages as they finish. By afternoon the count of units in assembly and units packed has moved, and the owner can see it without walking the floor. When a client rings, the answer comes from the cards, not from a guess about which kitchen is where.

What job cards do not do

  • They do not run your panel saw or edge bander directly
  • Machine time costing and worker piece rates are separate work
  • Which stages you record is set from how your workshop runs
  • Quality standards for a finish remain your own call

The workshop floor from approval to dispatch

A job card is worked by several people before a kitchen leaves the factory. This page follows one project on the workshop floor. It shows who cuts, who edges, who assembles and who tells the showroom it is ready. The floor has a sequence. Each step ends with a mark on the card.

Cutting the sheets in the morning

On the next visit, the cutting operator opens the day’s cards and cuts boards to the list. Each finished panel is marked against its unit. A panel cut wrong is reported on the card, and the replacement is cut before the day ends.

Edge banding and drilling

The next operator bands the edges and drills for hinges and channels. Panels move forward only after the card is marked. The supervisor sees a queue at drilling, one step before the day goes wrong. Recovery is still easy.

Assembly and quality look

A carpenter assembles base units and the supervisor checks squareness and shutter alignment. A unit that fails goes back with a note. Units that pass are marked ready. They are stacked for packing at the end of the bay.

The showroom reads progress

The showroom manager opens the project and sees which units are done. A client asking for an update gets a clear answer. Dispatch must wait. It is planned only once every unit on the order is marked complete.

Make an informed decision

Questions to settle before rollout.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Edge banding

What happens when the connection stays down longer than the local buffer allows?

Test “Edge banding” with a controlled disconnection. Check how missing readings, delayed uploads and storage limits are made visible before relying on the history.

Background reading: AWS: local stream storage

From work order to cutting list

Is the plan based on demand that is still open?

Review “From work order to cutting list” with an order that changes after planning. Check which material or capacity reservations need review before promising the revised completion date.

Background reading: ERPNext: production planning

FAQ

Frequently asked questions

What if panels are cut outside our workshop?

The cutting list is still raised, and it goes out as a purchase order to the panel supplier. Receipt of cut panels is then recorded.

Can two kitchens be cut together?

Yes. Panels from more than one project can be grouped by board, and each panel keeps its project and unit code.

Does a worker mark the stage on the shop floor?

Yes, where a tablet or a shared screen is placed in the workshop. Otherwise the factory in-charge updates the cards.

Are unit labels printed?

Labels can print from a label or barcode printer, and the model is confirmed when the workshop is set up.

Which board grade should a kitchen use?

That is your call and the client’s. Dealers commonly suggest a water-resistant grade near the sink, and the standard mark on the sheet tells you what you bought.

Can job cards be printed for the floor?

Yes, one card per unit with panel sizes, edge colour and hardware, and a label for each finished unit.

What happens when a panel is damaged?

A replacement panel is added to the card with a reason, so waste can be reviewed later.

Does it connect to a panel saw?

Not directly. The cutting list prints or exports as a file, and saw connections are scoped on their own.

Where it fits

How this feature fits the system.

Modular Kitchen Business Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Showroom enquiries and site visits

Showroom staff record the client, the flat or site, the kitchen shape discussed, the referrer and the measurement visit that has been booked.

Lead Management

Quotations by unit and running feet

Quotes price each base, wall, tall and loft unit with finish and hardware, plus countertop, hood, hob and sink, and every version is retained.

Estimate/Quotation Management

Production job cards

Each unit gets a production job card following cutting, edge banding, drilling, assembly and packing, with the worker or machine noted at every stage.

Job Cards
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements