Site Measurement Sheets for Modular Kitchens
Measurements taken at the flat go on one sheet that the designer and the factory both read. Nothing is copied twice, so the cutting list follows the wall.
What the sheet records
One sheet per kitchen, opened at the flat and filled in before the measurer leaves.
Measuring at site
The sheet opens on the measurer’s handset or tablet inside the flat. The measurer records readings as they are taken rather than writing on a pad and typing later at the showroom. A second visit after civil work is kept as its own sheet, so the change in a wall or a duct is visible. Both sheets stay on the project.
What the sheet feeds
Why measure at more than one height
Plastered walls are rarely true.
A measurer’s checklist for the flat
Walk the room once before taking a reading.
When a second measurement is needed
Civil work can change a wall after the first visit.
How the sheet feeds the cutting list
Everything the factory builds depends on a handful of readings taken on the first day. If a wall is recorded longer than it is, a run of units will not fit. If a beam drop is missed, a loft unit hits it. That is why the shortest reading governs, and why a second sheet after civil work does not overwrite the first. The designer draws against the sheet. The quote counts running feet from it. The cutting list applies your allowances for filler, skirting and scribe to the same figures. One careful visit prevents the most expensive kind of error, which is a panel cut to the wrong size.
What the sheet does not settle
- It does not shift plumbing or electrical points, which the client arranges
- Civil chipping and tile work stay outside this record
- It does not draw the kitchen; the design module does that
- Which fields appear on the sheet is set up with you
Measuring at the flat and using the sheet
A measurement sheet is made in an hour at the flat and used for weeks afterwards. This page follows the sheet from the visit to the cutting list. It shows who writes it, who checks it and who relies on it. The sheet has one author. Several later steps read from it.
Agree the evidence before signing off this part.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
When a second measurement is needed
Do purchasing, operating and billing quantities use the same unit?
Check the measurement unit and rounding used in “When a second measurement is needed”. Compare the result with a known sample before accepting a converted quantity or calculated charge.
Background reading: ERPNext: units of measure
The quotation
Which assumptions stop being valid when the quotation changes?
For “The quotation”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.
Background reading: ERPNext: quotation terms
Frequently asked questions
Can measurements be entered without a network at site?
Entry on a phone needs the site to be reachable. Where coverage is poor the readings are typed at the showroom and marked as entered later.
What if the flat is measured twice?
Both sheets are kept. The newer one governs the cutting list, and the older stays for comparison.
Are photographs of the walls stored?
Yes. Images attach to the sheet and open beside the readings when the designer starts the layout.
Does it calculate panel sizes on its own?
Panel sizes follow your own allowances for filler, skirting and scribe. Those allowances are entered during set-up.
How accurate must the first measurement be?
For a first quote, approximate wall widths and the positions of water points are enough. The factory needs a precise sheet before cutting.
Should measuring wait until civil work ends?
Final measurements should, since tiling and plastering change dimensions. An early visit is fine for planning if a later one confirms it.
Who takes the measurement, the designer or a measurer?
Either. Some showrooms send the designer and some use a separate measurer, and the sheet works for both.
Can the sheet include a sketch?
A sketch or a photograph of a drawn plan can be attached beside the readings.
How this feature fits the system.
Modular Kitchen Business Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Showroom enquiries and site visits
Showroom staff record the client, the flat or site, the kitchen shape discussed, the referrer and the measurement visit that has been booked.
Lead ManagementQuotations by unit and running feet
Quotes price each base, wall, tall and loft unit with finish and hardware, plus countertop, hood, hob and sink, and every version is retained.
Estimate/Quotation ManagementProduction job cards
Each unit gets a production job card following cutting, edge banding, drilling, assembly and packing, with the worker or machine noted at every stage.
Job CardsTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements