Site Measurement Sheets for Modular Kitchens

Measurements taken at the flat go on one sheet that the designer and the factory both read. Nothing is copied twice, so the cutting list follows the wall.

What the sheet records

One sheet per kitchen, opened at the flat and filled in before the measurer leaves.

Wall lengths and ceiling height

Each wall is measured near the floor, at counter level and close to the ceiling, because plastered walls rarely run true. The shortest reading governs the carcass.

Beam drops and projections

Beam depth, duct boxes and anything that cuts into a loft or a wall unit, written with its height from the floor.

Window and door positions

Where a sill falls, which way the door swings, and how far a shutter may open before it strikes something.

Service points

Water inlet, drain, gas line, switchboard and chimney duct positions, each given as a distance from the nearest corner.

Wall photographs

Pictures of every wall, the corners and the existing points attach to the sheet from the measurer phone.

Measuring at site

The sheet opens on the measurer’s handset or tablet inside the flat. The measurer records readings as they are taken rather than writing on a pad and typing later at the showroom. A second visit after civil work is kept as its own sheet, so the change in a wall or a duct is visible. Both sheets stay on the project.

What the sheet feeds

The layout drawing

The designer draws base, wall, tall and loft units against the measured wall, not against a guess made in the showroom.

The quotation

Running feet come from the sheet. A later correction moves through to the quote.

The cutting list

The governing readings give the panel sizes for the factory, with filler and scribe allowances applied.

Why measure at more than one height

Plastered walls are rarely true.

Read near the floor, at counter level and near the ceiling

Take all three. The smallest reading governs what can fit.

Record squareness

Corners that are not square change how a filler or scribe strip is cut.

Locate beams from the corner

Give each beam’s distance from a corner and its drop, so the loft unit height is correct.

A measurer’s checklist for the flat

Walk the room once before taking a reading.

Fixed elements first

Windows, doors, ducts, beams and columns.

Service points

Water, drain, gas, switchboard and chimney outlet, each as a distance from a corner.

Floor level

Check for a slope that will affect base unit heights.

Appliance positions

Note where the fridge and hob are expected to stand.

Photographs

Take pictures of each wall and corner before leaving.

When a second measurement is needed

Civil work can change a wall after the first visit.

After tiling or plastering

Thickness changes the final wall length.

After points are moved

The new position is recorded on a fresh sheet.

Before cutting begins

A final check before cutting avoids the worst surprises.

How the sheet feeds the cutting list

Everything the factory builds depends on a handful of readings taken on the first day. If a wall is recorded longer than it is, a run of units will not fit. If a beam drop is missed, a loft unit hits it. That is why the shortest reading governs, and why a second sheet after civil work does not overwrite the first. The designer draws against the sheet. The quote counts running feet from it. The cutting list applies your allowances for filler, skirting and scribe to the same figures. One careful visit prevents the most expensive kind of error, which is a panel cut to the wrong size.

What the sheet does not settle

  • It does not shift plumbing or electrical points, which the client arranges
  • Civil chipping and tile work stay outside this record
  • It does not draw the kitchen; the design module does that
  • Which fields appear on the sheet is set up with you

Measuring at the flat and using the sheet

A measurement sheet is made in an hour at the flat and used for weeks afterwards. This page follows the sheet from the visit to the cutting list. It shows who writes it, who checks it and who relies on it. The sheet has one author. Several later steps read from it.

Arriving at the flat

Wall lengths, window positions and the door swing are entered as measured. Nothing is carried back on loose paper.

Marking the services

Next the measurer records where water, drain, gas and power points sit and how high. These decide where the sink, hob and chimney can go. On the floor, the designer reads these first. They come before a single unit is drawn.

The designer checks the sheet

Back at the showroom, the designer compares the sheet with the client’s sketch. A wall that measures shorter than described is queried at once. A second visit is booked. This happens before the layout is drawn.

The factory reads the final figures

When the layout is approved, the production head reads the same measurements behind it. Filler panels and end panels are sized from the sheet. The cutting list follows the wall as it stands. Nothing is guessed.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

When a second measurement is needed

Do purchasing, operating and billing quantities use the same unit?

Check the measurement unit and rounding used in “When a second measurement is needed”. Compare the result with a known sample before accepting a converted quantity or calculated charge.

Background reading: ERPNext: units of measure

The quotation

Which assumptions stop being valid when the quotation changes?

For “The quotation”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.

Background reading: ERPNext: quotation terms

FAQ

Frequently asked questions

Can measurements be entered without a network at site?

Entry on a phone needs the site to be reachable. Where coverage is poor the readings are typed at the showroom and marked as entered later.

What if the flat is measured twice?

Both sheets are kept. The newer one governs the cutting list, and the older stays for comparison.

Are photographs of the walls stored?

Yes. Images attach to the sheet and open beside the readings when the designer starts the layout.

Does it calculate panel sizes on its own?

Panel sizes follow your own allowances for filler, skirting and scribe. Those allowances are entered during set-up.

How accurate must the first measurement be?

For a first quote, approximate wall widths and the positions of water points are enough. The factory needs a precise sheet before cutting.

Should measuring wait until civil work ends?

Final measurements should, since tiling and plastering change dimensions. An early visit is fine for planning if a later one confirms it.

Who takes the measurement, the designer or a measurer?

Either. Some showrooms send the designer and some use a separate measurer, and the sheet works for both.

Can the sheet include a sketch?

A sketch or a photograph of a drawn plan can be attached beside the readings.

Where it fits

How this feature fits the system.

Modular Kitchen Business Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Showroom enquiries and site visits

Showroom staff record the client, the flat or site, the kitchen shape discussed, the referrer and the measurement visit that has been booked.

Lead Management

Quotations by unit and running feet

Quotes price each base, wall, tall and loft unit with finish and hardware, plus countertop, hood, hob and sink, and every version is retained.

Estimate/Quotation Management

Production job cards

Each unit gets a production job card following cutting, edge banding, drilling, assembly and packing, with the worker or machine noted at every stage.

Job Cards
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.