Artwork and Mock-up Approval for Signage Jobs
Every mock-up version is saved against the job with the client’s comments. The version marked approved is the one the workshop sees on the job card, and earlier versions stay in the history.
Versions and changes
A signboard goes through two or three drafts before the client is happy. Each draft needs a number, a date and an owner.
Why approval sits before cutting
Acrylic and ACP cannot be uncut. A wrong spelling or colour fixed on screen costs little, but the same fix on a finished board means a remake. The job card shows only the approved version. Trade guides on sign shop workflow describe the same rule: production waits until the proof is signed, and a file changed after sign-off must go back for a fresh approval.
What a good mock-up carries
A client can only approve what they can read. A flat logo on white tells them little about a lit board at night.
Who works with it
- Designers upload mock-ups and revise them after comments
- Estimators send versions to the client and record the replies
- The workshop opens the approved file from the job card
- Owners see which jobs are waiting on a client’s approval
Questions for the client before approval is requested
Delay comes from the wrong person reading the proof. Settle a few points first.
- Who at the client company has authority to approve, and who only comments?
- Does the landlord or mall office need to see the design as well?
- Is the logo file the current one, or an old copy from a visiting card?
- Will the client approve by signature, email or message, and which of these do you accept?
What approval does not cover
The system keeps the record of what was approved. It does not design the artwork or check brand rights. Who may approve for a client company, such as a store manager or head office, is confirmed with the client.
A mock-up from first draft to cutting
A mock-up passes between the designer, the client and the workshop before any board is cut. Each opens the record for a different reason. Follow one fascia sign through a week to see where versions and comments matter. Drafts pile up quickly.
What the owner settles before approvals go live
Approval stands between a drawing and money spent on material. Before the first job runs through it, the owner should decide who requests it, who may accept it and what the saved file must show. These are quick decisions. Keep it light.
Questions to settle before rollout.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
Artwork and Mock-up Approval for Signage Jobs
Which version applies to work that has already started?
Use a revised example from “Artwork and Mock-up Approval for Signage Jobs” in the demonstration. Identify work still using the earlier version before deciding which jobs should change.
Background reading: Odoo: controlled product changes
Approval
What needs fresh approval after a record is changed?
For “Approval”, change a material detail after approval in the demonstration. Agree the next responsible person and the evidence needed before the work can continue.
Background reading: ERPNext: approval transitions
Frequently asked questions
Can a reply on WhatsApp count as approval?
Yes, when you accept it. The message is attached to the version, and what your business treats as valid approval is your own decision.
What if the client changes their mind after cutting begins?
The change is recorded as a new version and the job card is flagged. Whether the extra work is charged is decided with the client and noted on the invoice.
Are the design files stored in the system?
Yes, as attachments on each version. The size of files and how long they are kept are reviewed during set-up.
How many mock-up rounds should a quotation allow?
No standard revision count exists. Shops state a count of free revisions in the quotation terms and charge design time beyond it. Pick a rule and write it on the quotation.
Why does the colour on the board differ from the proof on screen?
Screens glow, while vinyl, paint and printed flex reflect light. Name the colour by code and show a physical swatch where the match matters.
Can the workshop see older versions by mistake?
The job card opens only the approved version. Earlier drafts remain in the history for the office, which helps when a client says they approved something else.
Who is responsible if the approved artwork has a spelling error?
That is a matter for your terms with the client. Reading the text aloud before sign-off, and recording who signed, is the usual protection.
How this feature fits the system.
Signage Business Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Quotations and rate card
Quotations are built from square foot rates for flex, ACP, acrylic, letters and lighting, with installation and transport added as separate lines.
Estimate/Quotation ManagementWorkshop job cards
The workshop works from one card per sign, listing sizes, materials, finish and steps, and fabrication and printing stages are ticked off as they finish.
Job CardsMaterial stock and offcuts
Stores track ACP sheets, flex rolls, acrylic, LED modules and power supplies against jobs, with reorder levels and a list of reusable offcuts.
Stock Tracking and AlertsTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements