Sheet, Flex and LED Stock for Signage Workshops
Stock records cover sheets, rolls, letter stock, LED modules and power supplies. Issues are made against a job, so each board shows the material it used and the workshop can see what is left.
What is tracked
A sign workshop buys in large units and uses them in odd pieces.
Issue against jobs
Material is issued from the job card. The issue takes the quantity off stock and puts it against that board. A sheet issued twice for one job stands out, because the second issue shows beside the first.
Why offcuts deserve a record
Offcuts are cash sitting on a rack. A shop that cuts a letter board from a fresh full sheet while a usable piece lies unseen pays twice.
Lighting parts and their risks
LED systems in lit letters fail at the power supply, so spare drivers matter more than spare modules. Heat and damp shorten a supply’s life, which is why shops keep a few drivers in stock beyond the open jobs. Decide a spare quantity per driver type when you set reorder levels.
Who works with it
- Storekeepers receive and issue material
- The workshop sees which offcuts are on the rack
- Owners see items below reorder level
- Estimators see what a past board used, before pricing the next one
Questions for the storekeeper at set-up
- Which unit does each item use, sheets, running feet or pieces?
- What size makes an offcut worth keeping?
- How often is the shelf counted against the record?
- Where do damaged sheets from the supplier get booked?
Supplier and price changes
Sheet and LED prices move between purchases. The stock record holds quantity and the last booked cost, which helps the owner compare quotation rates with the latest buying price. Revising the rate card is a decision the owner takes. Track the supplier, the invoice number and the date on each receipt so a disputed delivery can be traced.
What the stock record does not do
It counts what is booked in and out. It does not weigh scrap or catch material taken without a job card. The shelf is checked against the count from time to time by a person.
Stock movements through a workshop week
Material comes in on a lorry, goes out on a job and returns as scraps. Several people touch the record along that path. A week in the storeroom shows who writes what and why it matters at the cutting table.
What to settle before the first stock count
Stock records are worth only what people put into them. Before opening balances are entered, the owner and storekeeper should agree who issues material, how pieces are named and what is worth counting at all. Keep the answers practical. Keep it practical.
Agree the evidence before signing off this part.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
What the stock record does not do
What happens to movements entered while a count is being checked?
For “What the stock record does not do”, choose a count date and trace the movements around it. Agree who investigates a difference before an adjustment changes the available balance.
Background reading: ERPNext: stock reconciliation
Frequently asked questions
Can stock be split between two workshops?
Yes. Each workshop or godown keeps its own count, and a transfer moves material from one to the other.
Does a supplier’s bill update the stock?
Material is added when the storekeeper books it in against the bill. Payment to the supplier is handled in your accounts.
Can wastage be recorded?
Yes. Wastage is booked against the job, so the quantity cut and the quantity the board used can be read together.
How do I price a board that uses an offcut?
Most shops still charge the full rate per square foot, since the rate carries wastage and handling. Whether to give a discount is your policy.
Can I see which jobs used the most acrylic?
Issues are tied to jobs, so a list by job is possible. Reports on this are agreed with your team at the first workshop.
What about material the client supplies?
Client-supplied material can be booked as a separate item and kept off your cost. Decide this rule before the first such job.
Can the system suggest what to reorder?
It lists what has fallen below the level you set. The quantity to buy, and from whom, remains the owner’s call.
How this feature fits the system.
Signage Business Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Quotations and rate card
Quotations are built from square foot rates for flex, ACP, acrylic, letters and lighting, with installation and transport added as separate lines.
Estimate/Quotation ManagementWorkshop job cards
The workshop works from one card per sign, listing sizes, materials, finish and steps, and fabrication and printing stages are ticked off as they finish.
Job CardsMaterial stock and offcuts
Stores track ACP sheets, flex rolls, acrylic, LED modules and power supplies against jobs, with reorder levels and a list of reusable offcuts.
Stock Tracking and AlertsTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements