Skip to main content
GullySystem

Architecture Project and Site Records

Every project opens with a plot, a client and a brief. The site particulars, the appointment terms and the people involved are held in one record the studio works from.

What the project record holds

Site and plot

Site address, plot area, survey or khata reference, road width, orientation and the setbacks your drawing is working to, all held where the studio can read them.

Building particulars

Building type, number of floors, built-up area and the use the client has in mind for each floor.

Client and contacts

The client, the owner who signs, the contractor once appointed and the number each one answers on.

Appointment terms

The stages your appointment letter names, what each stage covers and the drawings promised at the end of it.

Project team

The project architect in charge, the draughtsmen assigned and the consultants brought on for structure and services.

Who opens and reads it

A principal or project architect opens the project once the appointment letter is signed, and the site particulars entered then are read by everyone who touches the job later. Draughtsmen read the plot and orientation while setting up a sheet. Liaison staff check the plot reference before a submission is prepared. Accounts staff read the stage list first. Nobody retypes the address.

How a project record feeds drawings, stages and visits

Stages open from here

The stage list entered on the project becomes its milestone track. Billing waits for that mark.

Drawings inherit the project

A new drawing number picks up the project code, so the register stays sorted by site rather than by sheet.

Submissions and visits attach

Approval sets, consultant requests and site visit reports all hang off this record, so a principal reading one project sees its whole history without opening four other files.

What your office fixes for project records

  • Which project codes and site names your office uses
  • The stages your appointment letter names and what each one covers
  • Which fields must be filled before a project can open
  • Who may change the appointment terms after signing

Opening a project record, step by step

The first week of a job decides how clean the file stays. A fixed order helps.

Enquiry first

Record the caller, the plot location and the brief as stated. Nothing else is needed yet.

Appointment next

Once the letter is signed, the stage list and the fee terms are entered from it and not from memory.

Team and codes last

The project architect, the draughtsmen and the project code are set, so the first drawing number picks the code up.

Plot details that get lost in an unstructured folder

Site particulars are small facts that cost a lot when they go missing. Teams look for them across WhatsApp chats and old emails.

  • The plot reference as it appears on the owner’s papers
  • Road width and orientation noted at the first site visit
  • Setbacks the drawings were prepared against
  • The name of the person at site who holds the keys
  • Boundary changes the survey revealed

Questions to ask about a project record

  • Is a project allowed to begin as an enquiry and become an appointment later?
  • Can several contacts sit on one project with one marked as the signing owner?
  • Do drawings, submissions and visits attach to this one record?
  • Can partners decide which fields are compulsory?

Handling one project record from brief to handover

A project record is opened once and read for years. The first entries decide what everyone finds later. Here is how a studio touches one record between the signed appointment letter and the last handover file, role by role. Each reads it differently.

Principal opens the record

After the appointment letter is signed, the principal enters the client, the plot reference and the agreed scope. Fee lines are left to accounts. Small gaps at this point turn into arguments later in the job.

Draughtsman reads the plot

Before starting a plan, the draughtsman reads setbacks and plot dimensions from the record, not from an old message. A corrected site area shows its date. The earlier figure is therefore not drawn from by mistake.

Liaison clerk adds particulars

Survey numbers, owner names and authority file references are added as papers arrive. The clerk does not retype them for each submission. They are read from the record, and a change is made once, in one place. One entry serves all.

Handover closes the file

Contacts, final scope and consultant names are confirmed. The file then becomes the reference for any later alteration brief.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Appointment terms

What becomes available when a booking is moved or cancelled?

Use “Appointment terms” to move a booking, then cancel a second example. Check the released slot, the person or resource still assigned, and any amount left to settle before accepting the revised schedule.

Background reading: ERPNext: appointment records

FAQ

Frequently asked questions

Can a project be opened before the appointment is signed?

Yes. It sits as an enquiry with the site particulars, and the appointment terms are added once the client signs.

What if a plot has more than one owner?

Several contacts are held against one project, with the signing owner marked apart from the rest.

Are the owner’s documents kept here?

Uploads sit against the project record. Which papers your office collects at the start is listed during implementation.

Can two studios share one project?

Yes. Both read the same project record, and who may change what rests with the partners.

Does the record check plot rules for us?

No. It holds the figures your office enters, such as setbacks and plot area. Whether they comply is for the architect and the authority.

Can old projects be loaded?

Projects from your folders and sheets can be brought in with their codes, stages and contacts. How far back to go is decided with you.

Can a project be archived after handover?

A closed project stays readable with its drawings, visits and bills, and drops off the working lists.

How are site photographs kept?

They attach to the visit that took them and stay reachable from the project record. Whether they sit here or on your cloud drive is your call.

Where it fits

How this feature fits the system.

Architecture Firm Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Drawing register and revisions

Plans, sections and details are filed in the drawing register with each revision’s reason, author and date, so the team finds the current sheet.

Document Management

Studio time and workload

Architects and draughtsmen log hours against each project, and the studio head reads the week’s totals to see which job is drawing the most effort.

Project Time Tracking

Projects and site records

Each project record names its architect and drawings in hand, so the principal sees how many jobs each person carries before promising a date.

Resource Allocation
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements