Design Stages in an Architecture Practice

A project moves through named stages, and each stage owes a set of drawings. The studio marks the date a stage was reached, along with whatever is still pending inside it.

Stages a practice names for a project

Concept

Site study, options and the massing shown to the client. The option the client picked is recorded.

Schematic design

Plans, sections and elevations worked up to a level the client and the structural consultant can both read.

Approval set

The drawings and forms prepared for lodging with the local authority, kept as a stage of its own.

Detailed design

Working drawings, joinery and services layouts, finish schedules and the quantity list taken off them, each sheet numbered in the register before it leaves the studio.

Good for construction

The set released for the contractor to build from, with every consultant input folded in.

Site stage

Visits, revisions raised on site, snags and the as-built set handed over at the end. Handover closes the file.

What a stage carries

Each stage holds a start date, the date it was reached, the drawings it owes and the name of the architect answerable for it. A stage is marked complete only when the drawings listed under it exist in the register. Client comments sit against the stage in which they were raised. Nothing closes quietly.

Where the stage list is used

Billing

Accounts staff can bill any stage once it is marked complete. Till then it stays off the billing list.

Workload

Projects group by stage, so a principal can see the count sitting at detailed design this month. Load shifts week by week.

Client updates

A short note can go out when a stage closes, by WhatsApp or mail.

What stage tracking leaves to the architect

  • Drawings are drawn and checked by the studio, and only their existence is recorded
  • Your fee stages come from the appointment letter
  • A stage is never approved on the client’s behalf
  • It does not chase a consultant by itself, staff still call

Stage names across practices

Names vary. A studio following an Indian appointment letter may use one set, a firm with international clients another.

Council of Architecture stages

The Council of Architecture’s conditions of engagement describe stages from the client’s brief onward, and Indian appointment letters draw on them in some form.

Plan of work stages

Practices working with overseas clients may use the numbered stages of a plan of work such as RIBA’s.

Your own list

The system takes whatever names your office uses and does not insist on either scheme.

Marking a stage complete

  • The listed drawings exist in the register
  • The architect answerable has signed the stage off
  • The client’s approval is on record, where the appointment requires it
  • Open items inside the stage are cleared or carried forward by name

Questions to ask about stage tracking

  • Can two stages run together on one project?
  • Is a stage reopened when the brief changes?
  • Does completion feed the bill without retyping?
  • Can each project have a different stage list?

A project’s stage list through the working week

At that point, a stage list is read by several people for different reasons. The principal looks for slipping dates, the draughtsman looks for the next set due, and accounts look for a stage ready to bill. Here is each reading in turn.

Principal on Monday morning

The principal scans every live project and its current stage. Then, a project parked in schematic design for long enough draws a question. Beside each stage sits the date it was reached, so drift is plain. Drift shows early.

Project architect assigns the sets

With a stage reached, the architect checks what drawings that stage owes and hands them out. A detailed design stage may owe door schedules and toilet details. Each is given a name and a due date. Nothing is assumed.

Draughtsman marks work done

As sheets are completed, the draughtsman ticks them against the stage. Unfinished items remain visible inside the stage. A stage is not called complete while one sheet is still in hand. Partly finished sheets are not counted as done by anyone reading the list.

Accounts watches for closure

When a stage is marked complete, accounts sees it as ready for a bill. If the closing date looks odd, the question goes back to the project architect before any invoice is raised. Billing waits for that answer.

Choices to make before stages are entered

Stage tracking works only when the studio agrees what each stage means. Before the first project is entered, partners settle the points below. They are short conversations that save long ones during live projects. Settle them early, before habits form.

The stage names

Choose the names the studio really uses, from concept to site supervision. If clients have heard a stage called something else, add a note beside it. Names should read the way the studio talks. Clients then recognise the words in every message.

Who may close a stage

Decide whether a project architect can mark a stage complete or whether a principal must. The answer depends on how fees are tied to stages. Fees follow the answer.

What each stage must hold

List the drawings, approvals and client inputs a stage owes before it can close. A tidy list for concept differs from one for approval set. Each is entered once and reused for new projects. Keep that list short.

Bringing running projects across

Mark each running project at the stage it has really reached today. Do not backfill old dates. The record starts from the present, and earlier history stays in the existing files. The next stage change is the first real entry for each job.

Make an informed decision

Questions to settle before rollout.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Billing

Can you explain the balance from its original documents?

Select a partly settled example in “Billing”. Ask for the invoice, allocated receipts and remaining balance to be shown together before agreeing the opening figures.

Background reading: ERPNext: outstanding invoices

Approval set

What needs fresh approval after a record is changed?

For “Approval set”, change a material detail after approval in the demonstration. Agree the next responsible person and the evidence needed before the work can continue.

Background reading: ERPNext: approval transitions

FAQ

Frequently asked questions

Can we rename the stages?

Yes. Stage names follow your appointment letter, and our staff rename them when the practice changes how it works.

What if two stages run together?

Both stay open. A project shows the stage furthest along and the earlier ones still carrying work.

Is a stage reopened when the brief changes?

Yes. It reopens with a note on why, and the drawing revisions raised afterwards are linked to it.

Does one stage block the next?

Only where your office wants that. Whether detailed design may start on an unapproved schematic rests with the partners.

Can stage names differ between projects?

A villa and a hospital rarely follow the same list, so each project carries its own stage names and the drawings each one owes.

Who marks a stage complete?

The roles you allow. It is the project architect with a principal’s sign-off, and accounts staff only read the result.

How are stage delays shown?

Each stage has a planned date and the day it was reached. Any stage past its plan shows the days over, grouped by architect and project.

Does the system tell us which stage to bill?

It shows stages marked complete that have not been billed. The fee for each stage still comes from your appointment letter.

Where it fits

How this feature fits the system.

Architecture Firm Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Drawing register and revisions

Plans, sections and details are filed in the drawing register with each revision’s reason, author and date, so the team finds the current sheet.

Document Management

Studio time and workload

Architects and draughtsmen log hours against each project, and the studio head reads the week’s totals to see which job is drawing the most effort.

Project Time Tracking

Projects and site records

Each project record names its architect and drawings in hand, so the principal sees how many jobs each person carries before promising a date.

Resource Allocation
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements