Design Stages in an Architecture Practice
A project moves through named stages, and each stage owes a set of drawings. The studio marks the date a stage was reached, along with whatever is still pending inside it.
Stages a practice names for a project
What a stage carries
Each stage holds a start date, the date it was reached, the drawings it owes and the name of the architect answerable for it. A stage is marked complete only when the drawings listed under it exist in the register. Client comments sit against the stage in which they were raised. Nothing closes quietly.
Where the stage list is used
What stage tracking leaves to the architect
- Drawings are drawn and checked by the studio, and only their existence is recorded
- Your fee stages come from the appointment letter
- A stage is never approved on the client’s behalf
- It does not chase a consultant by itself, staff still call
Stage names across practices
Names vary. A studio following an Indian appointment letter may use one set, a firm with international clients another.
Marking a stage complete
- The listed drawings exist in the register
- The architect answerable has signed the stage off
- The client’s approval is on record, where the appointment requires it
- Open items inside the stage are cleared or carried forward by name
Questions to ask about stage tracking
- Can two stages run together on one project?
- Is a stage reopened when the brief changes?
- Does completion feed the bill without retyping?
- Can each project have a different stage list?
A project’s stage list through the working week
At that point, a stage list is read by several people for different reasons. The principal looks for slipping dates, the draughtsman looks for the next set due, and accounts look for a stage ready to bill. Here is each reading in turn.
Choices to make before stages are entered
Stage tracking works only when the studio agrees what each stage means. Before the first project is entered, partners settle the points below. They are short conversations that save long ones during live projects. Settle them early, before habits form.
Questions to settle before rollout.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
Billing
Can you explain the balance from its original documents?
Select a partly settled example in “Billing”. Ask for the invoice, allocated receipts and remaining balance to be shown together before agreeing the opening figures.
Background reading: ERPNext: outstanding invoices
Approval set
What needs fresh approval after a record is changed?
For “Approval set”, change a material detail after approval in the demonstration. Agree the next responsible person and the evidence needed before the work can continue.
Background reading: ERPNext: approval transitions
Frequently asked questions
Can we rename the stages?
Yes. Stage names follow your appointment letter, and our staff rename them when the practice changes how it works.
What if two stages run together?
Both stay open. A project shows the stage furthest along and the earlier ones still carrying work.
Is a stage reopened when the brief changes?
Yes. It reopens with a note on why, and the drawing revisions raised afterwards are linked to it.
Does one stage block the next?
Only where your office wants that. Whether detailed design may start on an unapproved schematic rests with the partners.
Can stage names differ between projects?
A villa and a hospital rarely follow the same list, so each project carries its own stage names and the drawings each one owes.
Who marks a stage complete?
The roles you allow. It is the project architect with a principal’s sign-off, and accounts staff only read the result.
How are stage delays shown?
Each stage has a planned date and the day it was reached. Any stage past its plan shows the days over, grouped by architect and project.
Does the system tell us which stage to bill?
It shows stages marked complete that have not been billed. The fee for each stage still comes from your appointment letter.
How this feature fits the system.
Architecture Firm Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Drawing register and revisions
Plans, sections and details are filed in the drawing register with each revision’s reason, author and date, so the team finds the current sheet.
Document ManagementStudio time and workload
Architects and draughtsmen log hours against each project, and the studio head reads the week’s totals to see which job is drawing the most effort.
Project Time TrackingProjects and site records
Each project record names its architect and drawings in hand, so the principal sees how many jobs each person carries before promising a date.
Resource AllocationTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements