Skip to main content
GullySystem

Drawing Register and Revisions for Architects

Every plan, section, elevation and detail takes a number, and every change takes a revision. The register shows the revision in force and what each earlier one altered.

What a register entry holds

Number and sheet title

Your own numbering, the sheet title and the project the drawing belongs to.

Sheet particulars

Scale, sheet size, the discipline it sits under and the stage it was drawn for.

Author and checker

The draughtsman who drew the sheet and the architect who checked it before release.

Revision in force

The current revision letter, its date and the file uploaded against it.

Revision history

Each earlier revision with the reason it was raised, the person who asked for it and a note on what it altered, so the trail can be read later.

Why a revision is raised

A revision follows a client comment, a consultant input, an authority query or something found on site. The reason comes from your own list, so the register can later be read by cause. A revision raised during a site visit is linked back to the visit report. Reasons are never left blank.

Keeping site on the current print

Superseded prints are marked

An earlier revision shows as superseded, so nobody prints and issues it again by mistake.

Holders are listed

Everyone who received an earlier revision is listed against it, so a reissue reaches the consultant, the contractor and the site office without anyone hunting through old mail.

Pending work shows

Drawings asked for and not yet redrawn sit on a pending list the studio reads each morning. Work shows before it is late.

What the studio sets up for its drawing register

  • Your numbering pattern for plans, sections, elevations and details
  • The revision letters or numbers your office has always used
  • The list of reasons on which a revision may be raised
  • Who may check a sheet and release it for issue
  • Whether drawing files are uploaded here or kept on a cloud drive

What a revision history shows over a project

A single sheet can pass through more than one letter before it is built. The history explains each step.

Cause

Revisions carry a reason from your own list, such as a client comment or a consultant input, so a principal can read the register by cause.

Author and checker

Each revision names who drew it and who checked it, which matters when a site problem is traced back.

Date and stage

The stage in force at the time of each revision is noted, so late changes stand out from early refinement.

Numbering patterns that survive growth

A numbering scheme that works for one architect breaks down with six. Fix the pattern early.

  • Project code first, then a drawing type letter, then a sequence
  • Separate runs for plans, sections, elevations and details
  • Revision letters or numbers kept apart from the drawing number
  • One owner for the numbering list, such as a senior draughtsman

Questions to ask a drawing register tool

  • Does it stop two sheets sharing a number?
  • Can the checker and releaser be different people?
  • Is the revision in force clear at a glance?
  • Can past revisions be retrieved on demand?

A drawing register in daily studio use

Afterwards, the register is opened more than any other record in a studio, by people with different questions. This section looks at four moments in the week when the register is read, and what each reader needs from it. Each reader asks differently.

Draughtsman starts a sheet

Before drawing a new elevation, the draughtsman checks the number pattern and the next free number. The sheet is entered with its title and author. Two people can no longer pick the same number by accident. Numbers stay unique.

Checker raises a revision

The checker finds a wrong window size on a section and raises revision C. Day to day, the register records the cause and the sheets affected. The earlier revision is marked superseded, so old prints are not trusted. Old prints lose authority.

Site engineer asks which is current

A call comes from site about a staircase detail. The project architect opens the register and reads the revision in force and its issue date. The answer takes a moment and no one searches a folder. It is a short answer.

Principal reviews before submission

Before a sanction set is lodged, the principal reads the register for the project. Pending revisions and unchecked sheets stand out. The set goes out only once the list is clean. Anything unchecked is chased before the set leaves the building.

Decisions before the register is filled

A register is easy to start and hard to untangle. These are the points a studio settles before the first sheet is entered. Each takes only a short meeting among partners and the senior draughtsman. Keep it brief. The answers last for years of drawings.

The numbering pattern

Choose how a sheet number is built: discipline, floor and a serial, for instance. Keep it readable on a printed title block. Once drawings are numbered, changing the pattern means renumbering live work. A predictable pattern helps new staff.

Who may raise a revision

Decide whether a draughtsman can raise a revision or whether the checker alone does. The rule decides who is named as author and who as approver. It is applied to every project in the same way. The rule is simple.

What a revision note must say

Agree the minimum entry: the cause, the sheets altered and the person who asked. A note that reads revised tells the site nothing. A good one saves a phone call. The reason matters as much as the sheet number.

Bringing existing sheets in

For running jobs, enter only the sheets in current use, with their latest revision. Do not recreate old history. Superseded prints from before the change stay in the archive folder. Archive folders keep their place beside the register.

Make an informed decision

Questions to settle before rollout.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Drawing Register and Revisions for Architects

Which version applies to work that has already started?

Use a revised example from “Drawing Register and Revisions for Architects” in the demonstration. Identify work still using the earlier version before deciding which jobs should change.

Background reading: Odoo: controlled product changes

FAQ

Frequently asked questions

Does it open or read CAD files?

No. The register holds the entry, the revision and an uploaded file, while drafting stays in your CAD software.

Can an older revision be recovered?

Yes. Earlier revisions stay against the number with their files, and the one in force is marked plainly.

Who is allowed to raise a revision?

Roles your partners nominate. The person and the date are stored with the revision as it is raised.

May revisions be numbered within a stage?

Yes, where the practice already does that. The pattern goes in as your office writes it.

Can we import our existing drawing list?

Existing lists from a sheet can be loaded with their numbers, titles and current revisions. How much revision history to bring over is a decision for your office.

Does the register show which sheets are on hold?

A sheet held for a consultant or a client reply carries a hold mark and the cause, which explains any pause.

What stops an unchecked drawing reaching site?

Release for issue needs a named checker. Sheets without one stay out of the issue list, and the register shows the gap.

Are drawing files stored inside the system?

That is your call. Files can be uploaded against each sheet, or the register can point to a folder on your own cloud drive.

Where it fits

How this feature fits the system.

Architecture Firm Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Drawing register and revisions

Plans, sections and details are filed in the drawing register with each revision’s reason, author and date, so the team finds the current sheet.

Document Management

Studio time and workload

Architects and draughtsmen log hours against each project, and the studio head reads the week’s totals to see which job is drawing the most effort.

Project Time Tracking

Projects and site records

Each project record names its architect and drawings in hand, so the principal sees how many jobs each person carries before promising a date.

Resource Allocation
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements