Studio Workload in an Architecture Practice
A practice sells drawing hours, and those hours are rarely counted. Time entered against a project shows where the studio went this week and which drawings are waiting.
What is recorded
What the numbers are read for
A principal reads hours by project against the stage being billed, which shows where a building is taking more studio time than the appointment allowed for. Draughtsmen see only their own sheets and hours. A project architect sees the team on that project. Nobody is ranked. Entry is kept short.
Where workload shows
What studio time records leave out
- Payroll and salary are not calculated
- Door attendance is not marked
- No architect is rated against another
- It does not set a fee from the hours recorded
What phase-level time tells an architecture practice
Studios that sell drawing hours need to see where the hours went. Totals alone hide it.
Habits that keep time entry honest
Hours typed in from memory once a month come out wrong. Short and frequent works better.
- Enter hours at the end of each day
- Pick the project and stage from a short list
- Leave leave and holidays visible, not hidden
- Let a project architect review the week’s entries
Questions to ask about workload tracking
- Can hours be tied to a stage?
- Is the count of drawings waiting per person shown?
- Can a principal see spare capacity before a new enquiry is taken?
- Can staff enter time on a phone?
Using workload figures when a new brief arrives
Deciding whether to take a job needs two numbers, and both come from the records.
Time entry through a studio day
Hours are recorded in small moments, and the habit decides whether the numbers are worth reading. Here is how time entry fits four points in a working day, from the first drawing session to the Friday read. Small habits matter.
Setting up workload tracking in a studio
Studios fear that timesheets will feel like surveillance. A few early decisions keep the practice honest and calm. Settle them in a short partners’ meeting before anyone is asked to enter a single hour. Honesty starts with a clear rule.
Agree the evidence before signing off this part.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
What is recorded
Which observation would change the proposed scope?
For “What is recorded”, observe someone completing the task with a representative example. Record where they stop, ask another person or re-enter information, then choose the smallest change whose result the team can verify.
Background reading: GOV.UK: researching user needs
Frequently asked questions
Is time entry compulsory for everyone?
That is for the partners to fix. Some practices record hours only on site visits and submission work.
Can hours be entered from a phone?
A short entry after the day’s drawing work is the usual way.
Does it link to a biometric device?
Only if you want attendance as well. The device make is checked during scoping, and that work is quoted separately.
Who sees another person’s hours?
Principals, and the project architect on that project. Everyone else reads their own entries.
Are billable and non-billable hours separate?
Work types can be set as billable or not, such as office admin or training. Reports then show each person’s split.
Can a project be closed to new time entries?
Once a project or a stage is closed, no further hours can be booked against it without a partner reopening it.
Will staff see this as surveillance?
That depends on how your office introduces it. The records are about projects, and partners decide what each person sees.
How does it help decide whether to accept a new job?
The workload view shows drawings in hand and hours booked for each person. A principal reads this before promising a start date.
How this feature fits the system.
Architecture Firm Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Drawing register and revisions
Plans, sections and details are filed in the drawing register with each revision’s reason, author and date, so the team finds the current sheet.
Document ManagementStudio time and workload
Architects and draughtsmen log hours against each project, and the studio head reads the week’s totals to see which job is drawing the most effort.
Project Time TrackingProjects and site records
Each project record names its architect and drawings in hand, so the principal sees how many jobs each person carries before promising a date.
Resource AllocationTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements