Skip to main content
GullySystem

Studio Workload in an Architecture Practice

A practice sells drawing hours, and those hours are rarely counted. Time entered against a project shows where the studio went this week and which drawings are waiting.

What is recorded

Hours by project

An architect or draughtsman enters hours against a project and the stage they worked on.

Work type

Drafting, checking, a client meeting, a site visit or submission work, from your own list.

Drawings in hand

Sheets assigned to each person, plus the revision asked and when it falls due.

Leave and absence

Days a person was away, so a week with few hours is not read as slow work.

What the numbers are read for

A principal reads hours by project against the stage being billed, which shows where a building is taking more studio time than the appointment allowed for. Draughtsmen see only their own sheets and hours. A project architect sees the team on that project. Nobody is ranked. Entry is kept short.

Where workload shows

Drawings per person

The sheets each draughtsman is carrying, and the number overdue.

Project time

Hours spent on a project to date, by stage and by person.

Spare capacity

Who can take the next project, read from sheets in hand rather than from memory.

What studio time records leave out

  • Payroll and salary are not calculated
  • Door attendance is not marked
  • No architect is rated against another
  • It does not set a fee from the hours recorded

What phase-level time tells an architecture practice

Studios that sell drawing hours need to see where the hours went. Totals alone hide it.

Against the stage billed

Hours on a stage set beside the fee for that stage show whether a building is costing more than expected.

By work type

Concept drawing, working drawings and site visits take different shapes of time. Splitting them shows the pattern.

Across a month

Recurring overruns on one project type point to a fee that needs revisiting at the next appointment.

Habits that keep time entry honest

Hours typed in from memory once a month come out wrong. Short and frequent works better.

  • Enter hours at the end of each day
  • Pick the project and stage from a short list
  • Leave leave and holidays visible, not hidden
  • Let a project architect review the week’s entries

Questions to ask about workload tracking

  • Can hours be tied to a stage?
  • Is the count of drawings waiting per person shown?
  • Can a principal see spare capacity before a new enquiry is taken?
  • Can staff enter time on a phone?

Using workload figures when a new brief arrives

Deciding whether to take a job needs two numbers, and both come from the records.

Drawings in hand

Sheets assigned to each person, with the stage they belong to.

Hours still booked

Time already promised to live projects through the coming weeks.

Gap that remains

Whatever capacity is left decides the start date quoted to the new client.

Time entry through a studio day

Hours are recorded in small moments, and the habit decides whether the numbers are worth reading. Here is how time entry fits four points in a working day, from the first drawing session to the Friday read. Small habits matter.

Start of the day

The draughtsman opens the list of drawings in hand and picks the project for the first session. In real use, a short entry is made against it. The day starts with a plan, not a blank, and the hours go where the work is.

After a client call

The project architect spends a long call on a revised layout and enters the time against the same project as a client meeting. Calls are no longer swallowed by the day. Each call is counted.

Switching between two projects

Work moves from a school job to a residence after lunch. A new entry begins with the switch. The record shows two projects, each with its own hours, rather than a single vague block. Context switches are honest.

Friday partners’ review

Partners read hours by project against the stage being billed. A project that consumed far more time than its fee suggests is noted. The conversation about staffing next week begins from numbers. Numbers start the talk.

Setting up workload tracking in a studio

Studios fear that timesheets will feel like surveillance. A few early decisions keep the practice honest and calm. Settle them in a short partners’ meeting before anyone is asked to enter a single hour. Honesty starts with a clear rule.

Which work types to track

Choose a short list such as design, drawings, site, meetings and admin. Long lists make the entry tiresome. A short list can be read by a partner at a glance. Add types only when a question needs them.

Who sees individual hours

Settle whether only partners see time by person, or whether the project architect also does. Some studios share team totals but keep personal hours narrow. Write the rule before entries begin. Trust grows when the rule is open.

Leave and absence

Agree how leave, holidays and training days are entered. If absence is missing, the spare capacity figure is wrong. A single entry type for leave keeps the workload picture plausible. Leave is recorded plainly each time.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

What is recorded

Which observation would change the proposed scope?

For “What is recorded”, observe someone completing the task with a representative example. Record where they stop, ask another person or re-enter information, then choose the smallest change whose result the team can verify.

Background reading: GOV.UK: researching user needs

FAQ

Frequently asked questions

Is time entry compulsory for everyone?

That is for the partners to fix. Some practices record hours only on site visits and submission work.

Can hours be entered from a phone?

A short entry after the day’s drawing work is the usual way.

Does it link to a biometric device?

Only if you want attendance as well. The device make is checked during scoping, and that work is quoted separately.

Who sees another person’s hours?

Principals, and the project architect on that project. Everyone else reads their own entries.

Are billable and non-billable hours separate?

Work types can be set as billable or not, such as office admin or training. Reports then show each person’s split.

Can a project be closed to new time entries?

Once a project or a stage is closed, no further hours can be booked against it without a partner reopening it.

Will staff see this as surveillance?

That depends on how your office introduces it. The records are about projects, and partners decide what each person sees.

How does it help decide whether to accept a new job?

The workload view shows drawings in hand and hours booked for each person. A principal reads this before promising a start date.

Where it fits

How this feature fits the system.

Architecture Firm Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Drawing register and revisions

Plans, sections and details are filed in the drawing register with each revision’s reason, author and date, so the team finds the current sheet.

Document Management

Studio time and workload

Architects and draughtsmen log hours against each project, and the studio head reads the week’s totals to see which job is drawing the most effort.

Project Time Tracking

Projects and site records

Each project record names its architect and drawings in hand, so the principal sees how many jobs each person carries before promising a date.

Resource Allocation
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements