Consultant Coordination for Architecture Firms
A building needs more than one office drawing it. The consultants on a project, the inputs asked of each one and the drawings received are listed in one place.
Who is on the list
What is tracked against each one
A request records the input asked for, the drawing it relates to, the date asked and the date wanted, so the studio can see what is blocking it. Drawings that arrive are logged against the request and taken into the register. A consultant comment on your sheet becomes a revision reason. A reminder can follow on WhatsApp or by mail.
Where consultant coordination shows up in the studio
What your practice settles about consultants
- Which consultants are empanelled and for which building types
- Who may ask a consultant for an input
- Whether consultant bills are tracked here or by accounts
- How reminders reach a consultant office
Why consultant inputs hold up architectural drawings
A floor plan cannot be frozen until the column grid, the shaft sizes and the equipment room are known. The studio waits on others, and the wait is easy to lose.
Setting up a consultant request
- The input asked for, in one clear line
- The drawing it affects
- The date asked and the date needed
- The person at the consultant’s office who owns the reply
- A reminder date the project architect can see
Questions for consultant coordination software
- Does a late input mark the drawing it blocks?
- Are sets sent out and received back both counted?
- Is a consultant’s comment usable as a revision reason?
- Can a principal see all open requests without calling a meeting?
Reading the consultant list at the coordination review
The review is where late inputs get names against them. Bring the list, not memory.
Consultant coordination through a design week
Coordination is mostly waiting and chasing. A drawing leaves the studio, an input comes back, and the two have to be matched. Follow one project’s consultant list through a design week to see who acts on it and when. Each role reads it differently.
Agree the evidence before signing off this part.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
Who is on the list
Which observation would change the proposed scope?
For “Who is on the list”, observe someone completing the task with a representative example. Record where they stop, ask another person or re-enter information, then choose the smallest change whose result the team can verify.
Background reading: GOV.UK: researching user needs
Frequently asked questions
Do consultants log in to the system?
Not by default. A consultant view can be scoped, and most practices begin by sending mail and WhatsApp instead.
Can consultant fees be recorded?
Yes, where you pay them directly. What the client pays and what you pay follows the appointment letter.
Does it check a consultant drawing against ours?
No. Checking stays with the project architect, and the system records only that the check was done.
Can one consultant work on several projects?
Yes. The consultant record is shared, and each project keeps its own list of requests and arrivals.
Do consultants need to log in?
Not unless you want it. Most offices send and receive by mail or WhatsApp, and your staff record the exchange. A separate consultant view is scoped on request.
Can one consultant work on more than one project?
Each consultant is kept once and linked to every project they work on, so one screen shows everything a single office owes the studio.
How are overdue inputs shown?
A request past its wanted date moves to a late list with the days overdue, grouped by project and consultant.
Are consultant fees recorded here?
Only if your practice wants them. Some offices leave consultant bills with accounts and track only the drawings.
Can a consultant request be sent from the system?
The request is recorded in the system and the message itself goes out by mail or WhatsApp, depending on the connection you set up. Replies are logged by your staff against the same request.
How this feature fits the system.
Architecture Firm Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Drawing register and revisions
Plans, sections and details are filed in the drawing register with each revision’s reason, author and date, so the team finds the current sheet.
Document ManagementStudio time and workload
Architects and draughtsmen log hours against each project, and the studio head reads the week’s totals to see which job is drawing the most effort.
Project Time TrackingProjects and site records
Each project record names its architect and drawings in hand, so the principal sees how many jobs each person carries before promising a date.
Resource AllocationTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements