Skip to main content
GullySystem

Material and Finish Schedules for Architects

Finish selection runs alongside the drawings. Every room carries the flooring, paint, sanitaryware and fittings chosen, with the make and shade written where the site can read them.

What a schedule line holds

Room and element

The room, and whether the line is for flooring, wall finish, ceiling, joinery or a fitting.

Make and specification

Brand, series, shade, size and finish, written as the vendor’s own catalogue writes it, so the site orders exactly what the drawing intended.

Quantity taken off

The area or count read from the drawing, kept for the quantity list.

Vendor

The supplier or dealer quoted for that item, with the showroom contact.

Client sample

The sample shown, the date it was approved and whether the client signed on the sheet or on a print.

How the schedule is used

The project architect builds the schedule while detailing, so the sheets and the schedule carry the same specification and nobody writes a second version on a loose sheet. The quantity list for tender is taken off these lines. The contractor works from the schedule printed with the construction set. A changed selection raises a revision. Site asks fewer questions.

Where finish schedules connect to other records

Tender and quantities

Quantities off the schedule feed the list sent to contractors for rates.

Drawing revisions

A finish changed after issue is linked to the revision that carried it.

Site visits

A deviation in finish found on site refers back to the schedule line it breaks.

Which finish choices your office controls

  • Which rooms and elements the schedule covers
  • Whether vendor rates are held here or kept out of it
  • Who may change a selection the client has approved
  • Whether the client reads the schedule or only the drawings

Why finish schedules drift away from drawings

Finishes change late in a project. The sheet gets revised, and the schedule on a separate file does not.

Two versions of one choice

A tile named on a drawing differs from the tile in a loose sheet, and the contractor orders from whichever turns up first.

Client samples approved on site

A shade chosen at the shop never reaches the draughtsman, so the drawing stays old.

Quantities taken once

Areas measured at tender are not updated when a room changes size.

Building a schedule room by room

  • List each room and each element in it, floor to ceiling
  • Write the make and the code exactly as on the sample
  • Take quantities from the drawing in force
  • Note the vendor and the date the sample was approved
  • Link the line to the sheet that shows it

Questions for a finish schedule tool

  • Can a client approval be tied to a line?
  • Does a revision flag the lines it affects?
  • Can two options be held until one is chosen?
  • Is a site copy printable without vendor rates?

Where a material schedule meets the budget

Finishes drive cost more than most line items. The schedule is where the effect of a swap first shows.

  • A premium tile in one bathroom shifts the quantity list for tender
  • A cheaper paint range changes the coats named on site
  • A client who changes brand late reopens the vendor comparison

A finish schedule through the length of a job

Finishes are chosen early and changed late. In real use, the schedule has to stay readable while that happens. Here is one room’s finish line followed across four moments in the job, from first selection to a snag on site. The line stays the single reference.

Selection with the client

In the first visit to a tile showroom, the architect and client choose a bathroom wall tile. The make, shade and size are entered in the room’s line the same evening. The sample reference goes with it.

Quantities for the tender

The draughtsman takes off the wall area of the bathroom and enters the quantity. The tender list reads from these lines. A change in shade or size changes the line, so the tender document is not left behind.

Order and delivery on site

The contractor orders from the vendor named on the line. When boxes arrive, the site engineer compares the shade code with the schedule. A mismatch is noted before a single tile is laid. Mistakes show early.

Snag at handover

At the walk-through, a wall shows a patch of a different shade. The architect opens the room’s line, sees the approved shade and the sample date, and raises the snag against the right party. The record settles it.

What an office settles before building schedules

A finish schedule rewards a little preparation. These points are agreed before the first room is entered, so that every project is written the same way and any draughtsman can read another’s lines. Habits formed now hold for every later project.

The room and element list

Fix the names used for rooms and for elements within them, such as floor, skirting and wall. Two names for the same bathroom will split the schedule. One naming list serves every project. Short names read well on site.

What a line must carry

Agree the fields every line holds: make, code, finish and vendor. Optional ones, like a warranty note, are listed separately. A line missing its code is flagged, not silently accepted. Gaps are visible to all readers.

Who approves a change

Decide who may alter a line after the client has signed off: the project architect, or a principal. The change is dated and the earlier choice remains visible. Material swaps are never silent. Dates settle disputes.

Bringing in existing schedules

For a running job, enter the rooms still open and leave finished rooms in the older sheet. A short note links the two.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Drawing revisions

Which version applies to work that has already started?

Use a revised example from “Drawing revisions” during a scoped walkthrough. Identify work still using the earlier version before deciding which jobs should change.

Background reading: Odoo: controlled product changes

FAQ

Frequently asked questions

Does it hold vendor rates?

It can, where you want them. Whether rates sit in the schedule or stay out of it is decided with the partners.

Can two finish options be kept for one room?

Yes. Options sit side by side until the client picks one, and the choice is dated.

Is a printed schedule produced for site?

Yes. The schedule prints room by room and goes out with the construction set.

Does it order material from vendors?

No. Purchase is done by the client or the contractor, and the schedule only says what was specified.

Can the schedule be exported for a contractor?

A site copy can be produced with make, code and quantity. Whether vendor rates appear on it is your decision.

How are late changes tracked?

A changed selection is stored with its day and the approver’s name. The earlier choice stays visible in the history.

Do quantities update when a drawing changes?

Quantities are entered by your staff from the drawing in force. A revision flags the affected lines, and staff update the numbers.

Can a client see the schedule?

Only if you add a client view. A studio can share a printed schedule at the selection meeting and record the approval in the system.

Where it fits

How this feature fits the system.

Architecture Firm Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Drawing register and revisions

Plans, sections and details are filed in the drawing register with each revision’s reason, author and date, so the team finds the current sheet.

Document Management

Studio time and workload

Architects and draughtsmen log hours against each project, and the studio head reads the week’s totals to see which job is drawing the most effort.

Project Time Tracking

Projects and site records

Each project record names its architect and drawings in hand, so the principal sees how many jobs each person carries before promising a date.

Resource Allocation
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements