Skip to main content
GullySystem

Material and Finish Schedules for Architects

Finish selection runs alongside the drawings. Every room carries the flooring, paint, sanitaryware and fittings chosen, with the make and shade written where the site can read them.

What a schedule line holds

Room and element

The room, and whether the line is for flooring, wall finish, ceiling, joinery or a fitting.

Make and specification

Brand, series, shade, size and finish, written as the vendor’s own catalogue writes it, so the site orders exactly what the drawing intended.

Quantity taken off

The area or count read from the drawing, kept for the quantity list.

Vendor

The supplier or dealer quoted for that item, with the showroom contact.

Client sample

The sample shown, the date it was approved and whether the client signed on the sheet or on a print.

How the schedule is used

The project architect builds the schedule while detailing, so the sheets and the schedule carry the same specification and nobody writes a second version on a loose sheet. The quantity list for tender is taken off these lines. The contractor works from the schedule printed with the construction set. A changed selection raises a revision. Site asks fewer questions.

Where it connects

Tender and quantities

Quantities off the schedule feed the list sent to contractors for rates.

Drawing revisions

A finish changed after issue is linked to the revision that carried it.

Site visits

A deviation in finish found on site refers back to the schedule line it breaks.

What the client decides

  • Which rooms and elements the schedule covers
  • Whether vendor rates are held here or kept out of it
  • Who may change a selection the client has approved
  • Whether the client reads the schedule or only the drawings
FAQ

Frequently asked questions

Does it hold vendor rates?

It can, where you want them. Whether rates sit in the schedule or stay out of it is decided with the partners.

Can two finish options be kept for one room?

Yes. Options sit side by side until the client picks one, and the choice is dated.

Is a printed schedule produced for site?

Yes. The schedule prints room by room and goes out with the construction set.

Does it order material from vendors?

No. Purchase is done by the client or the contractor, and the schedule only says what was specified.

Talk to us

Tell us what you need.

Send a short brief and one of our engineers will come back to you within one business day.

  • No obligation
  • A reply within one business day
  • Your details stay private

All fields are required. A short description is enough.

Your details stay private. Privacy policyProtected by reCAPTCHA.