Architecture Firm Software Views for Principals and Architects
An architecture project passes through several hands between the first brief and the last bill. A partner, a project architect and a liaison clerk each reach only what their own work needs.
One project, five roles
One project through a working week
An enquiry is opened with the plot details. The studio draws, and each sheet takes its number. A set goes to the client for approval, and the reply is logged on the sheet. Staff on liaison lodge the submission and bring back the queries. An architect returns from site and types the visit report on a phone. On Friday evening, accounts raise bills on the stages that closed.
What each studio role cannot see
A draughtsman does not read fees or client correspondence. Submissions are visible to liaison without the billing. Consultant and contractor views, where a practice wants them, are limited to the sets and snags sent to that office, and they are scoped before they are built. Partners see everything.
What partners decide about studio roles
- Which roles exist in the studio and who holds them
- What each role may open, change or release for issue
- Who may approve a drawing for issue to site
- Whether fees are visible to project architects
- Which projects a visiting architect can read
A day in the studio as seen by each role
The same project shows a different face to each person. That is deliberate.
Setting access when the studio is small
A three-person studio may not need five roles. Roles can be merged and split later.
- Start with the roles you already use informally
- Give one partner the power to change roles
- Review the list when a new person joins or leaves
- Keep client mail visible only to those who deal with the client
Questions to ask about role-based access
- Can fees be hidden from project architects?
- Are visiting architects limited to one project?
- Does a log show who changed a released drawing?
- Does access end on the day someone leaves?
The same project on a Monday and a Friday
A role view matters when a project is moving. Here are four people in a studio at different points of one week on the same project. Each one opens a screen built for the question in hand. Roles differ here.
Access decisions a studio makes with partners
A studio chooses who sees what before staff start work. These are the questions partners settle, with the senior architect and the accountant, so every person opens a screen that fits their task and nothing else. Fit comes before convenience.
Agree the evidence before signing off this part.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
One project, five roles
Which observation would change the proposed scope?
For “One project, five roles”, observe someone completing the task with a representative example. Record where they stop, ask another person or re-enter information, then choose the smallest change whose result the team can verify.
Background reading: GOV.UK: researching user needs
Frequently asked questions
Can a draughtsman see the client’s mail?
That is set with the partners. Most studios keep correspondence with the architect in charge and show only sheets to the draughtsman.
Do architects work from a phone on site?
Visit reports, photographs, snags and hours are entered on site and read back in the studio.
Can a partner compare two studios?
Projects from every studio sit together, and a partner reads them as one list.
Who changes a role later?
GullySystem staff make the edit once you ask for it. The proposal sets down what each role may open.
May a person hold two roles?
A person can be given more than one role, and sees the combined access. A principal who also does accounts work is a common example.
What does a visiting consultant see?
Only the sheets and requests that concern them, where you choose to give them a view. Fees and client mail stay hidden.
Is a log kept of who released a drawing?
The register notes who checked and released each revision, with the date. That record stays with the sheet.
Do roles differ by project?
Access can be set per project, so a visiting architect reads one job and not the rest of the studio.
How this feature fits the system.
Architecture Firm Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Drawing register and revisions
Plans, sections and details are filed in the drawing register with each revision’s reason, author and date, so the team finds the current sheet.
Document ManagementStudio time and workload
Architects and draughtsmen log hours against each project, and the studio head reads the week’s totals to see which job is drawing the most effort.
Project Time TrackingProjects and site records
Each project record names its architect and drawings in hand, so the principal sees how many jobs each person carries before promising a date.
Resource AllocationTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements