Drawing Issue and Transmittals for Architects

A drawing is of use only once it reaches the right hands. Each issue records the set sent, the person it went to, the medium and whether receipt came back.

What an issue record holds

The set

Which drawings, at which revision, went out together as one transmittal.

The recipient

The client, a consultant, the contractor or an authority, along with whoever signed for the set.

The medium

Hand delivery, courier, WhatsApp, mail or a cloud drive link, as your office sent it.

Purpose of issue

For comment, for approval, for tender or for construction, picked from the list your practice uses.

Acknowledgement

Whether receipt came back, and the date it was recorded against the transmittal.

Who releases and who receives

A project architect releases the set once the checking architect has signed the sheets off, and office staff then send it out and record the acknowledgement when it comes. Contractors and consultants each see the sets they were sent and nothing more. Clients see what came to them. Liaison staff see submission sets only.

What issue records are read for

Proof of what site holds

When a question arises over what was built, the issue list shows which revision the contractor was handed and on what date it was signed for.

Reissue after a revision

A fresh revision brings up everyone holding the older print, ready for a new transmittal.

Submission packing

A set lodged with an authority is itself an issue record, with the forms and papers that went with it.

What your office decides about issuing drawings

  • The purposes of issue your transmittals carry
  • Who may release a set and who only sends it out
  • Whether a cloud drive link or an attached file goes out
  • How long superseded prints stay on file

Why a transmittal is a record and not a courtesy

A transmittal states who was sent which sheet, at which revision, on what date. Disputes about what site was given are settled by that line.

Purpose of issue

Sets go out for information, for approval, for tender or for construction. Marking the purpose stops a concept sheet being built from.

Good for construction status

Document control guides ask that this status be explicit on the transmittal, and the issue record keeps it on the line.

Both directions

Sheets received from consultants are logged the same way, so the register shows what came in as well as what went out.

The trouble with drawings sent as loose attachments

Mail and chat attachments are fast, and they are hard to retire. Old revisions linger in inboxes and on phones.

  • A contractor builds from a print that was superseded last week
  • A consultant answers a query against the wrong sheet
  • Nobody can say afterwards who had which revision
  • A reissue misses one of the people on the list

Questions for a transmittal system

  • Does each line name the sheet, revision and purpose?
  • Will a reissue reach everyone who held the older print?
  • Is acknowledgement tracked, with chasers for the missing ones?
  • Is the history open to a principal for one recipient?

A drawing set from issue to acknowledgement

An issue looks simple until a contractor asks which set was given. This section follows one drawing set from the draughtsman’s desk to a site engineer’s acknowledgement, with the person responsible at each stage. Dates settle it. The answer should be a click away.

Draughtsman prepares the set

The draughtsman picks the sheets and their current revisions for the purpose of issue, perhaps tender or construction. The set is named on the record before it goes out. Sheets that are still drafts are left out.

Project architect releases it

The architect checks the list against the register and releases the issue to the contractor and two consultants. Medium and recipient are entered. The same set cannot be sent twice under different names. The record shows who released it and when.

Site engineer acknowledges

The contractor’s engineer confirms receipt by reply. The clerk marks the acknowledgement on the issue. A set that nobody has confirmed is shown differently and is chased by the clerk the next working day. Silence is visible.

Month-end check on the file

Before the stage bill goes out, the principal reads the issue list for the project. Every set the client paid for is there, with dates and recipients. Disputes about what was delivered are settled from the record. The file speaks first.

Decisions to settle before issuing drawings

A transmittal system holds only what the office decides to record. Before the first set goes out through it, partners agree a handful of rules. Keep each one short enough to be applied by any project architect on a busy day. Rules should be few.

Who may release a set

Decide whether a project architect can issue to a contractor alone, or whether a principal signs off tender and construction sets. Draughtsmen prepare issues but do not send them. The rule is the same on every job.

The purpose labels

Agree the list of purposes, such as for information, for approval, for tender and for construction. Long label lists confuse the site. A short list is applied the same way by everyone. Review the list after the first projects.

Recipients and their addresses

Collect the people who will receive sets: contractor, consultants, the client and authority liaison. Enter names and roles once. Later issues pick them from the list, so no one types an address in a hurry.

Sets already out on site

For running projects, enter the current issue as one starting record with its date and sheets. Earlier history stays in the old files. The system starts from what the site holds today. Nobody tries to rebuild past issues.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Reissue after a revision

Which version applies to work that has already started?

Use a revised example from “Reissue after a revision” during a scoped walkthrough. Identify work still using the earlier version before deciding which jobs should change.

Background reading: Odoo: controlled product changes

The trouble with drawings sent as loose attachments

Who can open the file through its direct link?

For “The trouble with drawings sent as loose attachments”, check a sample with an authorised account and an account that should be refused. Include the downloadable file, not only the page showing its name.

Background reading: OWASP: record-level access

FAQ

Frequently asked questions

Can a transmittal go out on WhatsApp?

Yes, where the file size allows. The message carries the drawing list and the link or file your office chooses.

Is a printed transmittal note produced?

Yes. A note listing the drawings and their revisions prints for signature on delivery.

Does the contractor log in to download sets?

Only when you ask for it. A contractor view needs its own scoping and carries its own price.

What if receipt is never acknowledged?

The transmittal stays unacknowledged and shows on a pending list for office staff to follow up.

Does it mark older prints as superseded?

When a revision is issued, the earlier one is marked superseded on the register. Holders of the older print appear on a list, so a reissue can reach them.

Is there a limit to the sheets on one transmittal?

A single transmittal can list the whole set of sheets. Each sheet keeps its own number, revision and purpose on its line.

How do we chase a contractor who has not replied?

Unacknowledged issues stay on a waiting list with the days elapsed. Your staff call or write, and note the reply against the line.

Is a client a valid recipient as well as site?

Clients are recipients like any other. The same record holds the date, the medium and the purpose of the issue.

Where it fits

How this feature fits the system.

Architecture Firm Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Drawing register and revisions

Plans, sections and details are filed in the drawing register with each revision’s reason, author and date, so the team finds the current sheet.

Document Management

Studio time and workload

Architects and draughtsmen log hours against each project, and the studio head reads the week’s totals to see which job is drawing the most effort.

Project Time Tracking

Projects and site records

Each project record names its architect and drawings in hand, so the principal sees how many jobs each person carries before promising a date.

Resource Allocation
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements