Site Visit Reports for Architects
Site supervision produces more notes than any other stage. A visit report carries the date, the people met, the photographs taken and the instructions left for the contractor.
What a visit report records
From visit to closure
A snag opens with the visit that raised it and stays open until a later visit marks it closed. The contractor gets the snag list by WhatsApp or mail. A deviation the studio accepts turns into a drawing revision with the site visit as its reason. Open snags carry forward.
Who uses the reports
Limits of a site visit report
- Testing of material and certification of work stay outside it
- The contractor’s labour and material records are not run here
- Measurement for the contractor’s running bill is not done here
- It does not decide who pays for a deviation
How a snag list works on an architect’s job
A snag list holds defects and unfinished items found when work is checked against the drawings. It is taken at milestones and near completion.
What a visit report should say about deviations
Any deviation is a difference between the built work and the drawing. How it is handled shapes cost and liability later.
- Describe it plainly with a photograph
- Record whether the studio accepts it or orders it redone
- If accepted, raise a drawing revision with the cause named
- Leave the question of who pays to the contract, not to the report
Questions for a site visit tool
- Is entry possible on a phone with a weak signal?
- Can snags be filtered by trade and by room?
- Does each snag stay open until a named visit closes it?
- Can the contractor receive the list in a form the site team will actually read?
A site visit from preparation to snag closure
Site supervision follows a rhythm of preparation, visit, report and chase. Each part falls to a different person. Below is the rhythm for a single visit to a house under construction, role by role. Each visit repeats it with new photographs.
Choices to settle before the first site report
Reports are useful only when everyone fills them in the same way. These points are agreed before the first visit is entered. They cost a short meeting and avoid awkward gaps in the record on site. Agree them in one short sitting.
Agree the evidence before signing off this part.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
What a visit report records
What does one row mean before totals are combined?
Choose one period in “What a visit report records” and compare it with the source records. Define the date basis and grouping before accepting a total that combines several kinds of entry.
Background reading: Microsoft: reporting grain and relationships
Frequently asked questions
Does the report work without a signal on site?
Entries can be typed and photographs attached, and they upload once the phone finds a network again.
Can snags be grouped by trade?
Masonry, plumbing, electrical and finishing snags can be listed apart for the contractor.
Who closes a snag?
The architect who verifies it on a later visit. A contractor’s claim of completion is recorded separately.
Is a printed visit report produced?
The report prints with its photographs for the file, the client and the contractor.
Can photographs be attached from the phone?
Photos taken during a visit attach to the report and to the snag they show. Your staff can add more when they reach the office.
How is the contractor told about new snags?
The list goes out through mail or chat, and your staff note when it was sent. The contractor’s reply is logged against the same list.
Does a deviation ever lead to a drawing revision?
If the studio accepts one, it can be raised as a revision with the visit named as cause. Both records point to each other.
Are visit reports numbered?
Each report takes a number within its project, in date order, so a client or contractor can cite one precisely.
How this feature fits the system.
Architecture Firm Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Drawing register and revisions
Plans, sections and details are filed in the drawing register with each revision’s reason, author and date, so the team finds the current sheet.
Document ManagementStudio time and workload
Architects and draughtsmen log hours against each project, and the studio head reads the week’s totals to see which job is drawing the most effort.
Project Time TrackingProjects and site records
Each project record names its architect and drawings in hand, so the principal sees how many jobs each person carries before promising a date.
Resource AllocationTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements