Site Visit Reports for Architects

Site supervision produces more notes than any other stage. A visit report carries the date, the people met, the photographs taken and the instructions left for the contractor.

What a visit report records

Visit particulars

The date, the architect who went, the people met on site and the stage of work in progress.

Photographs

Pictures taken on the phone, attached to the report and to the part of the drawing they show.

Deviations

Work that differs from the issued drawing, with the drawing number and revision noted against it.

Instructions

What the contractor was told to do, and by when, written while the architect is still on site, so nothing is put together from memory afterwards.

Snags raised

Items the contractor has to close, each with a status the next visit updates.

From visit to closure

A snag opens with the visit that raised it and stays open until a later visit marks it closed. The contractor gets the snag list by WhatsApp or mail. A deviation the studio accepts turns into a drawing revision with the site visit as its reason. Open snags carry forward.

Who uses the reports

Project architects

Write the report on site and read the last visit before leaving the studio.

Principals

Visits made this week by project, with open snags on each site.

Clients

Receive a short visit note where your practice sends one. The decision is yours.

Limits of a site visit report

  • Testing of material and certification of work stay outside it
  • The contractor’s labour and material records are not run here
  • Measurement for the contractor’s running bill is not done here
  • It does not decide who pays for a deviation

How a snag list works on an architect’s job

A snag list holds defects and unfinished items found when work is checked against the drawings. It is taken at milestones and near completion.

Found

The snag is noted with a photograph and its place on the plan, so the contractor can find it without a phone call.

Assigned

The item goes to the trade responsible, such as the tiler or the electrician, through the main contractor.

Closed

A later visit checks the work and marks the snag closed. The closing visit is the evidence.

What a visit report should say about deviations

Any deviation is a difference between the built work and the drawing. How it is handled shapes cost and liability later.

  • Describe it plainly with a photograph
  • Record whether the studio accepts it or orders it redone
  • If accepted, raise a drawing revision with the cause named
  • Leave the question of who pays to the contract, not to the report

Questions for a site visit tool

  • Is entry possible on a phone with a weak signal?
  • Can snags be filtered by trade and by room?
  • Does each snag stay open until a named visit closes it?
  • Can the contractor receive the list in a form the site team will actually read?

A site visit from preparation to snag closure

Site supervision follows a rhythm of preparation, visit, report and chase. Each part falls to a different person. Below is the rhythm for a single visit to a house under construction, role by role. Each visit repeats it with new photographs.

Before the visit

The project architect opens the previous report and its open snags. A short list of things to check on site is prepared. The camera is charged, and the earlier instructions to the contractor are fresh. The walk starts prepared.

During the walk

The architect and the contractor’s engineer go through each floor. Photographs are taken and tied to a room or element. A deviation from the drawing is noted, with the sheet it contradicts, before leaving the spot. Memory is not trusted.

Report to the contractor

The same day, the report with its photographs and instructions is sent to the contractor. The contractor cannot say later that a point was only discussed. Accountability is plain.

Next visit, snags checked

On the following visit the architect works down the open snags. Closed items are ticked after a look. Those still open stay on the list and are read out again in the next report. Open items are visible.

Choices to settle before the first site report

Reports are useful only when everyone fills them in the same way. These points are agreed before the first visit is entered. They cost a short meeting and avoid awkward gaps in the record on site. Agree them in one short sitting.

What a visit report must hold

Agree the minimum: date, people present, photographs, deviations and instructions. A report lacking photographs is marked incomplete. The rule applies to the principal as much as to a junior architect. Consistency matters more than length here.

Who may close a snag

Decide whether the project architect alone closes a snag or the contractor can mark it done for checking. Two stages, raised and checked, keep the list honest. The closing person is named. Honesty beats speed.

How photographs are named

Choose how photographs are tied to rooms or elements. A picture tagged only with a date is hard to find later. A simple room tag costs a few seconds and saves long searching. Tags save time.

Running jobs and old notes

For a project already on site, start fresh from the current visit. Earlier notes stay in their existing files. List only snags still open, so the first report is clean and short. Old paper notes remain on the shelf.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

What a visit report records

What does one row mean before totals are combined?

Choose one period in “What a visit report records” and compare it with the source records. Define the date basis and grouping before accepting a total that combines several kinds of entry.

Background reading: Microsoft: reporting grain and relationships

FAQ

Frequently asked questions

Does the report work without a signal on site?

Entries can be typed and photographs attached, and they upload once the phone finds a network again.

Can snags be grouped by trade?

Masonry, plumbing, electrical and finishing snags can be listed apart for the contractor.

Who closes a snag?

The architect who verifies it on a later visit. A contractor’s claim of completion is recorded separately.

Is a printed visit report produced?

The report prints with its photographs for the file, the client and the contractor.

Can photographs be attached from the phone?

Photos taken during a visit attach to the report and to the snag they show. Your staff can add more when they reach the office.

How is the contractor told about new snags?

The list goes out through mail or chat, and your staff note when it was sent. The contractor’s reply is logged against the same list.

Does a deviation ever lead to a drawing revision?

If the studio accepts one, it can be raised as a revision with the visit named as cause. Both records point to each other.

Are visit reports numbered?

Each report takes a number within its project, in date order, so a client or contractor can cite one precisely.

Where it fits

How this feature fits the system.

Architecture Firm Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Drawing register and revisions

Plans, sections and details are filed in the drawing register with each revision’s reason, author and date, so the team finds the current sheet.

Document Management

Studio time and workload

Architects and draughtsmen log hours against each project, and the studio head reads the week’s totals to see which job is drawing the most effort.

Project Time Tracking

Projects and site records

Each project record names its architect and drawings in hand, so the principal sees how many jobs each person carries before promising a date.

Resource Allocation
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements