Skip to main content
GullySystem

Elevator AMC Contracts and Renewal Tracking

A contract ties a building and its lifts to the cover your company has sold. Visit frequency, instalments and the renewal date are read from this one record.

What a service contract holds

The contract is the record that every visit and every invoice refers back to. Nothing else overrides it.

Lifts covered

The building and the lifts inside it that the contract covers, named by wing and lift number.

Cover type

Whether parts are included, which parts are left out, and what is charged separately, in the words your own contract uses. Committees read this closely.

Visit frequency

The visit schedule for each lift, and whether a breakdown call is inside the cover or billed on its own.

Period and instalments

Start and end dates, the instalment plan the society or facility team agreed, and the amount falling due at each stage.

Signatories

The committee member or facility manager who signed. The signed copy is filed against the building.

Renewals and reminders

Contracts falling due appear in advance, grouped by month, so the office has time to speak to a committee before the period ends. A renewal keeps the lift history intact and opens a fresh period with its own instalments. Where a society takes months to decide, the contract is marked under discussion, and visits continue or stop by your instruction. A lapsed contract stops raising visits, so nobody services a building for free without the office knowing.

Who works with contracts

Owners

Read lifts under cover by building and cover type. Renewals that are near show on the same screen.

Service desk

Checks whether a caller’s lift is covered before a technician is sent, and whether the call is chargeable.

Accounts staff

Raise instalment invoices from the plan on the contract and follow what each building still owes you.

What is settled with the client

  • The cover types your company sells and what each one leaves out
  • Whether visits stop at once when a period ends, or continue on instruction
  • The number of months ahead a renewal appears on the office list
  • Who may change a cover type or extend a period

Comprehensive and non-comprehensive: what the record must say

Buyers ask for the difference. Published guides describe a comprehensive AMC as covering breakdown work and parts, while a non-comprehensive one is closer to labour and routine visits, with major parts paid separately.

  • Parts included and parts excluded, named
  • Whether breakdown calls fall inside cover
  • Response commitments written in the contract
  • Emergency support outside working hours
  • Who pays when a part is replaced

A renewal conversation

Renewals are won well before the end date. The office needs notice and facts.

Performance since last renewal

Calls, repeat faults and visits done give you something concrete to discuss.

Proposal on file

The renewal quotation is a revision of the old contract, so the committee sees what changed.

Follow-up dates

Each conversation is logged with the next date.

Questions committees ask a lift service company

  • How fast will a technician come to a stuck lift?
  • Which parts are covered?
  • Who is the contact at night?
  • How is a visit recorded?
  • What changes at renewal?

Handling a contract from signing to the next renewal

A lift contract has a life of its own. It is signed, scheduled, invoiced, chased and renewed. Reading that life through the roles involved shows how the record is used each day and what the office reads at renewal time.

Entering a signed contract

After a society signs, the office clerk enters the lifts covered, the visit frequency and the instalment dates. A scanned copy is attached. From then on the schedule and the billing both read from this one entry.

Visits against the contract

The service manager checks that visits are keeping pace with the cover sold. This is a weekly look. In the same step, a building owed a visit shows up in red on the desk list. Missed visits get a reason before the month closes.

A change midway through the term

A building adds a new lift to the same contract. The clerk records it with a start date and adjusts instalments. Nothing is overwritten.

Sitting down before the renewal date

Weeks before expiry the sales executive opens the contract, the visit history and the callbacks. At the desk, the renewal quote is prepared from what actually happened. A society that had repeated breakdowns gets a clear conversation.

Terms settled before contracts go on the system

A lift company settles a few things on paper first. These choices shape every schedule and every invoice that follows. Take time over them. Rushed terms come back as disputes.

Who may edit a signed contract

A signed contract should not change quietly. An edit by the clerk might wait for the service head.

What is recorded on each lift

Some companies record cover type, visit frequency and spare-part terms for every lift. Others record them per building. The choice affects reports later, so the owner picks one approach and uses it for all contracts.

How running contracts come across

Existing contracts sit on paper or in sheets. Before loading, each one is checked for building name, lift count and expiry date. Contracts already expired are loaded separately and marked as lapsed. Nothing is dropped.

Which renewal alert comes first

A reminder that arrives too early gets ignored. One that arrives late is useless. The owner chooses the number of weeks before expiry that the first reminder appears and who receives it. The choice can change after the first quarter.

Make an informed decision

Questions to settle before rollout.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Accounts staff

Can you explain the balance from its original documents?

Select a partly settled example in “Accounts staff”. Ask for the invoice, allocated receipts and remaining balance to be shown together before agreeing the opening figures.

Background reading: ERPNext: outstanding invoices

Elevator AMC Contracts and Renewal Tracking

What happens to existing dues when the next renewal is stopped?

For “Elevator AMC Contracts and Renewal Tracking”, test a cancellation near the renewal date. Agree the last service period and how any existing balance is handled before recurring work starts.

Background reading: ERPNext: recurring billing

FAQ

Frequently asked questions

Can one contract cover lifts of different makes?

Yes. A building with lifts from two makers can sit under a single contract, and each lift is named separately.

Does a lapsed contract stop the visit list?

Yes. Routine visits are raised from live contracts only. An expired period stops producing them.

How is a breakdown call outside cover handled?

The call is logged against the lift and marked chargeable, so your office raises a separate invoice for it.

Can the contract copy be stored here?

Yes. The signed copy and any annexure are filed against the building and opened from the contract record.

Can a contract start before the warranty ends?

Yes. The warranty end date is on file, so a paid contract can be scheduled to begin the day after.

Do renewals keep the old visit history?

Yes. The renewal sits beside the old contract, and the history stays on the building.

What if a society wants more visits than the contract says?

Change the frequency on the contract, and the visit list follows. The extra cost is priced by your office.

Can I see which contracts are due next quarter?

Yes. Renewals are listed by month, grouped by building, with the contact to speak to.

Where it fits

How this feature fits the system.

Elevator Service Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Quotations and modernisation proposals

Quotations list the parts and labour for a new lift, a repair or a modernisation, and are tracked to an order with revisions kept on file.

Estimate/Quotation Management

AMC contracts and renewals

Each building’s contract records cover type, the lifts included, visit frequency and instalments, so the service team sees renewal dates and visits owed.

AMC and Service Contracts

Technician routes and attendance

Buildings are grouped into routes with a technician or pair assigned, and the day’s visits and calls are recorded as attended.

Technician Scheduling
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements