Skip to main content
GullySystem

Lift Quotations and Modernisation Proposals

Quotations for new lifts, repairs and modernisation work are built here from the survey already on file. Each one is followed until the society or builder decides.

What a lift quotation carries

A quotation names what the buyer gets, in the wording your office already uses.

Lift specification

Load, speed, floors served, car finish, door type and the controller offered, drawn straight from the survey sheet. Nobody retypes it.

Scope of supply

What your company supplies and erects, and what the builder provides, such as the shaft, the power supply and scaffolding. Disputes start here.

Parts and labour

For a repair or a modernisation, the parts to be replaced and the labour days, each priced the way your office prices them.

Payment stages

The stages at which money falls due, from order to material arrival, erection and handover, as agreed with the buyer. Builders negotiate these hard.

Modernisation of an older machine

A modernisation proposal starts from what the survey found on the old lift. Controller replacement, a new door operator, rope renewal, car refurbishment and fresh button panels can each be offered alone or together. The proposal says which existing parts stay. Societies like to compare, so a second and a third version can sit against the same building without the first being lost.

Following a quotation to an order

Sent and seen

The quotation is marked sent, with the person it went to and the day an answer is expected.

Revisions

A revised version is kept beside the first. Both stay readable, so nobody argues about which figure was offered to the committee.

Order accepted

An accepted quotation opens the installation or repair job and carries the specification across. The buyer is already on file.

Closed without an order

A lost quotation closes with a reason, and the building stays on file for a later approach.

What lift quotations leave out

  • It sets no prices of its own, and your rate list is loaded at set-up
  • Tax treatment of supply and erection is for your accountant or advisor
  • It draws no shaft layout, which your draughtsman still prepares
  • Approval limits for a discount are settled with you before go-live

Scope that prevents disputes

Disputes on lift orders begin with what the builder or committee thought was included.

What you supply

Machine, rails, car, doors, controller, wiring and erection.

What the buyer provides

Shaft, pit, power point, scaffolding, and finishing around landing doors.

What is optional

Finish upgrades, extra features and extended warranty are listed as options.

Offering options to a society

A committee asks for three choices. A basic repair, a partial upgrade and a full modernisation.

  • Each option has its own parts, labour and price
  • Options share the same survey
  • Differences are shown side by side
  • The accepted option becomes the job

Questions for a lift quotation tool

  • Does it reuse the survey?
  • Are revisions kept?
  • Can discount limits be set?
  • Does it follow up on silence?

Preparing and following a quotation week by week

A lift quotation passes through the surveyor, the estimator, the sales head and finally the client. Here is how the record is used across a working week, from the first price request to the follow-up call. Each hand-off is marked.

Pulling figures from the survey

The estimator opens the survey on file and reads shaft size, floors and machine room position. A price is built from those facts. Nobody rings the site to ask for a measurement already taken. Time is saved.

Reviewing before it goes out

The sales head reads the draft scope, the exclusions and the payment terms. A line that promises civil work is removed. Only after approval does the quotation reach the builder or the society. It is a firm gate.

Sending revised options

The society asks for a cheaper controller. The estimator keeps the first quotation, adds a second version and marks which is current. Both stay on the record. The committee can compare them side by side.

Following up after a fortnight

The sales executive opens the list of quotations with no reply. A short call is made and the answer is noted. Lost quotations carry a reason, such as price or timing, for the next review. Calls stay brief.

What an owner settles before quotations are issued

Quotations carry the company’s promise on paper, so the owner decides a few things first. These choices apply to every quotation and every revision. Settling them early keeps the sales team from improvising when a client pushes. Keep it simple.

Who may release a quotation

A junior estimator may prepare a draft but not send it. The owner names who approves, and for what size of job. Approval is a click on the record. Everyone sees who approved and when.

What the standard scope includes

The company writes down what is part of a normal installation and what is extra, such as scaffolding or electrical points. Quotations then start from the same list. Clients see consistent wording from one job to the next.

How earlier quotations are brought in

Past quotations are in sheets and documents. The office loads the live ones with client, amount and date. Old closed ones can stay in the archive. A search then finds a similar job for reference.

Which follow-up report comes first

First on the list might be quotations pending more than ten days, or modernisation proposals with no reply. Others are added after a month of use. Review it each week.

Make an informed decision

Questions to settle before rollout.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Revisions

Which version applies to work that has already started?

Use a revised example from “Revisions” in the demonstration. Identify work still using the earlier version before deciding which jobs should change.

Background reading: Odoo: controlled product changes

Lift Quotations and Modernisation Proposals

Which assumptions stop being valid when the quotation changes?

For “Lift Quotations and Modernisation Proposals”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.

Background reading: ERPNext: quotation terms

FAQ

Frequently asked questions

Can three options be offered to one society?

Yes. Several versions sit against the same building, and the committee can be sent whichever ones you choose.

Does a modernisation quotation reuse the survey?

Yes. The existing machine details and the shaft readings carry across, so the writer starts from recorded facts rather than memory.

How is a revised figure kept separate from the first?

Each revision is stored as its own version. Each version keeps the day it was issued and who sent it.

Can a quotation become a job without retyping?

Yes. Accepting it opens the installation or repair job with the specification, payment stages and building already filled in.

How do I handle a committee that asks for a lower price?

Open a revision, change the lines and send it. The first version stays for comparison.

Can I price parts and labour separately?

Yes. Each part has a price and each labour day has a rate, so the committee sees both.

What happens when the order is placed?

The quotation opens the job and carries the specification and payment stages across.

Is old equipment from another make quoted differently?

The survey records the existing make and controller. The proposal states what stays and what is replaced.

Where it fits

How this feature fits the system.

Elevator Service Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Quotations and modernisation proposals

Quotations list the parts and labour for a new lift, a repair or a modernisation, and are tracked to an order with revisions kept on file.

Estimate/Quotation Management

AMC contracts and renewals

Each building’s contract records cover type, the lifts included, visit frequency and instalments, so the service team sees renewal dates and visits owed.

AMC and Service Contracts

Technician routes and attendance

Buildings are grouped into routes with a technician or pair assigned, and the day’s visits and calls are recorded as attended.

Technician Scheduling
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements