Skip to main content
GullySystem

Lift Test Records and Document File

Papers that belong to a lift are kept with the lift. Test readings, commissioning notes, drawings and certificates are filed against the machine and the building it serves.

What the file holds

Your office already keeps these papers somewhere. Here they sit beside the machine they describe.

Test readings taken

Readings your engineer records at commissioning and after major work, such as brake, governor and load test figures.

Commissioning and handover notes

The note signed at handover, the walkthrough remarks and the warranty period your office offered the buyer.

Drawings and layouts

Shaft and machine room drawings, wiring diagrams and the controller layout for the model installed.

Certificates and correspondence

Certificates and letters your office holds for that lift, with the date each was added and by whom.

Photographs

Site photographs from erection, from a major repair or from a modernisation, attached to the lift.

Who may open a paper

Access follows the work a person does. A technician on the route can read a drawing for the machine in front of them, while letters and certificates stay with the office staff you name. Every document shows who uploaded it and when, and a replaced version is kept rather than overwritten. Nothing leaves the system unless a person with permission downloads it.

Dates the office watches

Some papers carry a date that matters later.

Warranty end

The day a new lift comes off warranty, so a paid contract can be discussed in good time.

Renewal of a document

Where a paper your office keeps has an expiry on it, that date appears on a list for the staff to act on.

Last test after major work

The date readings were last taken on a machine, so an older entry can be seen and acted on.

What this module does not claim

  • It makes no statement about what any authority requires of a lift or its owner
  • It issues no certificate, and your engineer signs whatever your practice needs
  • It does not judge whether a reading is within limits
  • Which papers you keep, and for how long, is your own decision with your advisors

What commissioning papers include

Commissioning checklists published by lift installers cover rail alignment, mechanical checks, electrical tests, safety verification, performance such as levelling, and a review of documents. Your engineer decides the test content. The file holds the results.

  • Readings taken at commissioning
  • Handover note and walkthrough remarks
  • Wiring diagrams and controller layouts
  • Certificates and letters
  • Photographs of erection and major repairs

Keeping the file tidy

A file is only helpful if the latest papers are easy to find.

One home for each paper

A paper is filed against the lift and not in a personal folder.

Versions kept

The newest drawing is the current one, while older versions can still be brought back.

Who added it

Every paper shows when it was filed and by which person.

Questions for a lift document file

  • Can the technician open a drawing on a phone?
  • Can access be limited by role?
  • Are expiry dates reminded?
  • Can old versions be recovered?

Opening and updating a lift’s file through a year

A lift’s paper file is used on a handful of occasions, but each occasion matters. Here is how the document module serves the office, the technician and the society over the length of a year. It is a quiet record.

Filing after commissioning

After the lift is handed over, the supervisor passes on the test readings, drawings and certificate. The clerk uploads each against the lift. A paper without a date is returned to the supervisor to complete.

A committee asks for a certificate

A society secretary needs a copy of the last test certificate. The desk opens the lift’s file and sends the paper. The request is answered while the secretary is still on the phone. Speed matters to a secretary.

Renewing a dated paper

A certificate nears its renewal date and the clerk sees it on the watch list. The technician books the inspection and uploads the new paper after. The old one stays in the file, marked as replaced. Replaced papers stay on file.

Checking the file before an audit

Before a client’s review, the service manager opens each lift’s file and checks for gaps. Missing papers are listed by lift. Chasing goes one by one, and the list shortens every day. Gaps are visible early.

Choices made before lift papers are scanned in

A few matters get settled before scanning begins. These choices decide who sees what, and how easy a paper is to find years later. Take care at the start.

Who may upload or replace a paper

A replaced test certificate must not vanish.

What each paper is called

One lift has drawings, readings, certificates and notes. The company fixes a list of paper types, such as test record or commissioning note. Staff pick from the list instead of typing their own labels. Searches then work.

Scanning the existing files

Old files sit in cabinets. Someone decides which lifts to scan first, starting with the ones nearest to a renewal. Each scan is checked for readability before the paper copy is put away. Readable scans matter.

Which date the office watches first

Several dates may sit on one lift. The owner chooses the first date to watch, such as a periodic test or an inspection due. The warning period is set so the office has time to book the visit.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Warranty end

What proves that a planned task was actually completed?

Select an overdue entry in “Warranty end”. Ask which work record closes it and what remains visible when the visit is postponed or only part of the job is done.

Background reading: ERPNext: maintenance plans

Renewal of a document

What happens to existing dues when the next renewal is stopped?

For “Renewal of a document”, test a cancellation near the renewal date. Agree the last service period and how any existing balance is handled before recurring work starts.

Background reading: ERPNext: recurring billing

FAQ

Frequently asked questions

Does the system decide which papers a lift must have?

No. You list the papers your office keeps for each kind of lift, and the file follows that list.

Can an old version of a drawing be recovered?

Yes. A new upload sits beside the earlier one, and both stay readable with their dates.

Who can download a certificate?

Only the staff you permit. The record shows the person who downloaded it and the day it happened.

Can a technician add a photograph from the site?

Yes. Photographs taken during a visit or a repair attach to the lift from the technician’s phone.

Can I attach large drawings?

Yes, within normal file limits for the product. Very large drawings can be split.

Does the system check whether a reading is acceptable?

No. It stores the reading. Your engineer decides what is acceptable under the standard you follow.

Can a committee member see its own lift’s papers?

Only if you give that access. By default, papers are visible to your staff.

How long should papers be kept?

That is your decision with your advisors. The system keeps them until you remove them, and removal is logged.

Where it fits

How this feature fits the system.

Elevator Service Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Quotations and modernisation proposals

Quotations list the parts and labour for a new lift, a repair or a modernisation, and are tracked to an order with revisions kept on file.

Estimate/Quotation Management

AMC contracts and renewals

Each building’s contract records cover type, the lifts included, visit frequency and instalments, so the service team sees renewal dates and visits owed.

AMC and Service Contracts

Technician routes and attendance

Buildings are grouped into routes with a technician or pair assigned, and the day’s visits and calls are recorded as attended.

Technician Scheduling
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements