Skip to main content
GullySystem

Lift Spare Parts Store and Van Stock

Lift spares are counted in the store and in the hands of each technician. Every part that leaves is issued against a lift number, so the history of that machine is complete.

What the store holds

Lift spares are small items, and the list is long. Each belongs to a make and a model.

Door parts

Door rollers, hangers, locks, sills, belts, door operator parts and safety edges, held by the make they fit. Makes are rarely interchangeable.

Electrical and control

Control cards, contactors, relays, limit switches, push buttons, display boards and the wiring harness your technicians use most.

Machine and shaft

Ropes, guide shoes, brake liners, governor parts, buffers and the oil and grease a routine visit consumes.

Rescue device batteries

Batteries for an automatic rescue device, with the date each was fitted so a weak one is not missed.

Tools and consumables

Meters, tackles, lamps and cleaning material issued to a technician. The store expects these back.

Issue, van stock and return

A part leaves the store in two ways. It is either issued straight against a lift during a call, or handed to a technician to carry, which becomes that technician’s van stock. What a technician holds is visible to the store and to the desk, so a card already in a bag is not ordered again. Parts fitted are deducted from that stock, and unused parts are returned and counted back.

Reorder and purchase

The store watches what moves and what sits.

Reorder levels

Each part carries a level below which it appears on the short list. Purchase staff work from that list.

Orders on suppliers

Orders go to the lift maker, an importer or a local supplier, and stock is received against the order.

Chargeable parts

A part outside the cover type is marked chargeable, and the invoice for it follows from billing.

Slow and dead stock

Parts for a make you no longer service show as unmoved, so the owner can decide what to do.

What the store module leaves to you

  • Reorder levels for every part, set from your own consumption
  • Whether a technician may issue a part to himself without the store
  • Which parts count as chargeable under each cover type
  • Barcode or QR labelling, if you want it, is scoped before go-live

Keeping van stock under control

A technician’s bag is a small store. It needs the same discipline.

Count at hand-over

What is given to a technician is recorded by part and quantity.

Count on return

A periodic count shows what is missing.

Issue against a lift

Each part used goes against a lift number, so the history is true.

Slow stock and make-wise holding

Lift parts rarely fit across makes. A store can end up with parts for machines it no longer serves.

  • Parts are held by make and model
  • Unmoved stock is listed for review
  • Reorder levels follow your own consumption
  • Rescue device batteries carry the fitting date

Questions for a lift parts store

  • Can a part be traced to the lift it went into?
  • Is van stock counted separately?
  • Are purchase orders raised in the system?
  • Can parts be marked chargeable?

Parts store and van stock through a service week

Spares move from the supplier to the store, the store to a van and the van to a lift. Each step is written down by a different person. Here is how a week of service looks from the store counter. That counter sits in the middle.

Receiving a supplier delivery

A box of door sensors and a roll of rope arrive. At this point, the store clerk checks them against the purchase entry, then shelves them. Short items are noted and the supplier is called with the entry open. Shortages are caught early.

Issuing parts before a route

Before the day’s route, the technician collects spares for the lifts on the list. The clerk issues each part against a lift number. The van stock figure rises and the store figure falls at once. Nothing is issued off the books.

A part returned unused

A technician replaced a fault without needing the second spare. On return, the clerk takes it back and marks it against the same lift. Store and van counts agree again before the day ends. Counts stay honest.

Weekly count with the supervisor

On Saturday the supervisor walks the shelves and a few vans with the count sheet. Differences are written with reasons. Then, a part missing without a lift number is chased by name before the next issue.

Rules settled before stock is counted in

Parts records go wrong when nobody agrees on a few basics. Each choice affects how clearly a lift’s history reads later. Rules are cheap to write and costly to skip. Keep each rule short.

Who may issue a part

Only the store clerk and the store head should be able to issue a part. A technician may request one, but not take it silently. The rule is simple and everyone follows it from the first day. Exceptions are logged.

What counts as a spare to record

A bolt is not tracked like a controller board. The company decides the line, perhaps by value or by importance. Parts below the line are counted in bulk, parts above it are tracked one by one. The line is set once.

Counting the existing shelf

Before go-live the store is counted shelf by shelf and van by van. Counts are entered with the date. Parts of unknown make are labelled and kept apart. The first report then starts from true numbers.

Which alert the store head reads first

A low-stock alert for door operators may matter more than one for lubricant. In turn, the store head ranks the parts. The first alert is set for the few that stop a lift from running when they fail.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Issue, van stock and return

What happens to movements entered while a count is being checked?

For “Issue, van stock and return”, choose a count date and trace the movements around it. Agree who investigates a difference before an adjustment changes the available balance.

Background reading: ERPNext: stock reconciliation

Reorder and purchase

Can you explain the balance from its original documents?

Select a partly settled example in “Reorder and purchase”. Ask for the invoice, allocated receipts and remaining balance to be shown together before agreeing the opening figures.

Background reading: ERPNext: outstanding invoices

FAQ

Frequently asked questions

Can a part be traced to the lift it was fitted to?

Yes. Every issue carries a lift number, so the machine history lists each card, roller and rope fitted to it.

Is the stock a technician carries counted separately?

Yes. Van stock sits under the technician’s name and reduces as parts are fitted at the buildings on the route.

How is a part from an old make handled?

Spares for an old make are held like any other, against the make and model they suit. Unmoved parts are listed for the owner.

Can purchase orders be raised here?

Yes. Orders go to your suppliers from the short list, and goods arriving are booked against that order.

How do I stop technicians taking parts without a record?

Set the rule that issues need the store, or that a technician issues to himself with a lift number. Either way the entry is logged.

Can I see what a technician carries now?

Yes. Parts in hand are listed per technician, so the desk knows what is in the bag.

Do reorder levels adjust themselves?

No. You set them from your usage. The short list shows when a part falls below its level.

Can I label parts with a barcode or QR?

It can be added if you want it. Scoping happens before go-live because labels need a printer and a scanning habit.

Where it fits

How this feature fits the system.

Elevator Service Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Quotations and modernisation proposals

Quotations list the parts and labour for a new lift, a repair or a modernisation, and are tracked to an order with revisions kept on file.

Estimate/Quotation Management

AMC contracts and renewals

Each building’s contract records cover type, the lifts included, visit frequency and instalments, so the service team sees renewal dates and visits owed.

AMC and Service Contracts

Technician routes and attendance

Buildings are grouped into routes with a technician or pair assigned, and the day’s visits and calls are recorded as attended.

Technician Scheduling
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements