Elevator Technician Routes and Attendance Records
Buildings are grouped into routes, and a technician or a pair owns each route. The day’s visits and calls follow the route, and attendance is recorded against it.
How a route is built
A route is a list of buildings a technician can reasonably reach in a day. Societies in one locality, a hospital with several lifts and a commercial block on the way are grouped together. The office rebalances a route when it grows heavy or a technician leaves.
The technician’s day
One screen on a phone carries the whole day.
Attendance and where work happened
Attendance is recorded at the start and end of the shift. Where you use a biometric device at the office, that reading can be the attendance, and where technicians go straight to site, the phone records the first building instead. Mobile location on the technician app can stamp a visit with the place it was entered. You decide at set-up whether location is captured at all, and who may see it.
What routes do not do
- They do not plan the shortest path between buildings
- They do not calculate wages, overtime or night allowance
- A technician is not stopped from entering work outside the route
- Leave and shift rosters are kept the way your office keeps them
Designing routes that work
Each route has to be reachable in a day, with room for breakdown calls.
Attendance for a mobile team
Field teams do not sit at a desk. Attendance records use a phone, a reader at the office, or both. Industry guides advise one method per site and a location stamp for audit rather than for blocking.
- Start and end of shift are recorded
- Location is optional
- Leave is entered by the office
- Unsynced entries are visible
Questions for a route and attendance tool
- Can a route be shared by two technicians?
- What happens on leave?
- Can the desk see work done by route?
- Does it plan the shortest path?
A technician’s week on a route
Along the way, a route is a repeated pattern of buildings, so the week has a rhythm. The technician, the desk and the supervisor each look at it from a different angle. Here is how routes and attendance work together from Monday to Saturday. Mondays differ from Saturdays.
Questions answered before routes are drawn
Route design affects everything that follows, from fuel to attendance. A lift company answers a few questions before the first route is created. These answers are practical and can be settled by the owner and the supervisor together. Keep answers practical.
Agree the evidence before signing off this part.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
Attendance and where work happened
Can a correction be traced to the right date and session?
For “Attendance and where work happened”, check a late correction against the original register. Agree who may amend it and which downstream total should change after the correction.
Background reading: Frappe HR: attendance records
Frequently asked questions
Can two technicians share one route?
Yes. A pair can own a route, and each visit or call records the man who actually entered it.
What happens when a technician is on leave?
The route is handed to another technician for those days, and the visits move with it.
Does it track a technician through the day?
Only as far as you choose. Location can be stamped when work is entered, or left out of the setup entirely.
Can a technician see other routes?
No, unless you allow it. A technician normally reads the buildings on the assigned route and nothing else.
Can the route change for a day?
Yes. The desk can move a building to another technician for the day, and the visit follows.
Does the system pay overtime?
No. It records the hours. Wage and overtime rules stay with your payroll.
Can a technician enter work outside the assigned route?
Yes. The entry is not blocked, and it is logged to the lift worked on.
Can I see the visits done this week?
Yes. Visits done and due are shown by route and technician.
How this feature fits the system.
Elevator Service Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Quotations and modernisation proposals
Quotations list the parts and labour for a new lift, a repair or a modernisation, and are tracked to an order with revisions kept on file.
Estimate/Quotation ManagementAMC contracts and renewals
Each building’s contract records cover type, the lifts included, visit frequency and instalments, so the service team sees renewal dates and visits owed.
AMC and Service ContractsTechnician routes and attendance
Buildings are grouped into routes with a technician or pair assigned, and the day’s visits and calls are recorded as attended.
Technician SchedulingTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements