Skip to main content
GullySystem

Delivery and Breakage Records for Stone Dealers

Delivery and breakage follows stone from the yard to the site. Loads are planned by vehicle and A-frame, a delivery note prints for each, and the site’s check of every piece is recorded. Any breakage is logged against the slab with a photo and a reason, so a claim has evidence.

What a stone delivery and breakage record holds

Stone is at risk on the road. Four kinds of record follow a load from the rack to the site. Each names the slab or piece involved, so a loss is never a rounding error. Entry happens on the day.

Load plan by vehicle

Each vehicle has a list of the pieces it carries and the A-frame or crate each sits on. Dispatch sees which load is full and which has room. A piece is never on two vehicles.

Delivery note per load

A delivery note prints for every load, listing pieces by slab number and size, with the customer and the site. It travels with the vehicle. The driver and the site check from the same sheet.

Condition at the site

The vehicle arrives and the site checks each piece. Condition is recorded against the delivery note. A chipped tread or a cracked sill is written down on the day, in front of the driver.

Breakage against the slab

Breakage is logged against the slab with a photo and a reason. Crate damage, a loose A-frame on a rough road and a flaw found at unloading each get their own reason. The slab record carries the history.

Loading, driving and checking through the week

Delivery work begins in the yard. It ends on a site. Four moments show how a load is planned, checked and, when something breaks, claimed for. Each is a person with a delivery note in hand. Take them in turn.

Planning the morning loads

Dispatch sorts the day’s pieces onto vehicles and A-frames, keeping each customer’s pieces together wherever the load allows it. Each load is checked against its delivery note before it leaves the gate. Nothing leaves unlisted.

Handing over at the site

The site supervisor checks each piece as it comes off the vehicle. Condition is recorded beside the piece. Acceptance without comment is on the record, not left to memory. Questions are raised there and then, with the driver present.

A crack on a rough road

A tread arrives cracked after a rough road. The supervisor photographs it and sends the photo to the yard. The yard logs it against the slab with a reason. The carrier’s share is visible from that entry.

Cracks found at unloading

A container is unloaded. Some slabs are cracked. Purchase staff log each against its lot with a photo. Logging comes before shelving. The supplier is told with the evidence in hand, instead of hearing nothing.

What each person sees about delivery and breakage

Four people work with the same records. One plans loads, one answers customers, one watches losses and one claims from suppliers. Each reads the entries that settle their question. Photos and reasons sit with each entry.

Accounts and dispatch

They plan the day’s loads, print delivery notes and see which pieces are still to go. Delivered pieces become invoice lines. Stone logged as broken in transit is not billed as delivered. Dispatch reads the same list.

Sales staff and showroom

They answer a customer who asks where a piece is. The status shows loaded, delivered or broken. A customer told about a crack hears it from the record, with the photo to hand. No one needs to ring the driver.

Owners and yard managers

They read breakage by lot, supplier and carrier. A supplier whose slabs crack in transit, or a carrier whose A-frames loosen, is easy to see. They decide who to speak to first. Landed cost by lot puts a figure on what was lost.

Purchase and import staff

They log cracks found when a container is unloaded and read the supplier view of breakage. The claim goes out with photos and slab numbers. Nothing is written off in silence. Each supplier’s record builds up lot by lot.

Decisions to settle before the first load

Losses touch tempers in any yard. Agree these points early. Do it with dispatch, the drivers and the owner, before the first delivery note prints. Then every crack is recorded the same way.

Who may log or write off

Decide who can log breakage and who may write a slab off. One option is to let dispatch log and the yard manager approve. Every entry names the person and the date. Keep the approver to one person.

What is left out for Delivery and Breakage

Decide whether tiny chips on a polished edge need a photo and a reason. Agree which reasons appear in the list, such as crate damage or a loose A-frame. Fewer reasons means cleaner reports. Write the list on the dispatch wall.

How existing losses come across

Open claims on earlier containers can be entered before the first day, each against its lot. Slabs already known to be cracked carry the note. Past write-offs stay in the old books. Ask purchase staff for a list of claims still open.

Which report matters first for Delivery and Breakage

Start with breakage by lot, supplier and carrier. It shows where stone is lost. Landed cost and margin by lot then show what those losses did to the price of a parcel. Read the first month of entries with the yard manager.

How delivery and breakage connect to stock and billing

Deliveries run in two directions. A load takes finished pieces from cutting and hands the result to billing. A breakage entry goes the other way, back to the slab, the lot and the supplier. Five links carry that traffic between the yard and the customer.

  • Cutting and polishing jobs supply the finished pieces to load
  • Slab and block register keeps each slab’s breakage history
  • Imports and quarry purchases receive claims by lot and supplier
  • Area billing and invoices bill only pieces that were delivered
  • Builder, interior firm and dealer accounts show returns of chipped pieces

Where delivery and breakage records stop

The record shows what left, what arrived and what broke. It does not track a vehicle on the road, file an insurance claim or decide who was at fault. Transport document data comes through your provider. Insurance is a matter for you and your adviser. A yard that delivers only to its own gate may need no load plan at all.

FAQ

Frequently asked questions

How is breakage tied to a particular slab?

Each entry names the slab by its number, with a photo and a reason. It appears on that slab’s record. It also rolls up by lot, supplier and carrier in the breakage report. A cracked slab keeps its history.

Can a delivery note be printed for every load?

Yes, one prints for each load. It lists the pieces by slab number and size, with the customer and the site. The driver and the site supervisor check the load against it. Any mismatch shows at the gate.

How does the report show who caused the breakage?

Breakage by lot, supplier and carrier shows where losses cluster. That points to a cause. Deciding who is at fault stays with you, and any claim is raised with the supplier or carrier directly. The photo and the reason on each entry support that conversation.

What is recorded when stone reaches the site?

The site’s check of each piece and its condition are recorded against the delivery note. Pieces accepted whole are noted as such. A damaged piece is logged as breakage with a photo. Both stay on that delivery note’s record.

Can transport documents use our provider’s data?

Transport document data can come through your provider. Delivery notes still print from the yard’s own record. The yard’s record stays the source. Anything your transport rules require beyond that is for your adviser to confirm.

Where it fits

How this feature fits the system.

Marble and Granite Dealer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Slab and block register

Slab 14 of lot 22 stays slab 14. A hold and a delivery both name that piece.

Batch and Serial Tracking

Site measurement and quotations

Kitchen top measurements become a quote with edges and a sink cut-out. Acceptance makes it a job.

Estimate/Quotation Management

Cutting and polishing jobs

The job lists the slab, the cuts and the polishing unit. It closes with pieces back and wastage.

Work Order Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements