Commissioning and Handover Records for Rooftop Solar Plants

When a plant is switched on, the commissioning sheet records the readings, the inverter settings and the monitoring login. The handover checklist is signed by the customer and stays on the job.

The commissioning sheet

Test readings

String voltage, insulation and earthing readings, and the inverter’s output on the day are entered by the engineer, with the instrument used. Readings stay on the job.

Inverter and monitoring set-up

Settings, the app or portal account created for the customer and the Wi-Fi or data link used for monitoring are noted. The customer gets a working login.

Serials and quantities fitted

The sheet prints the panels, inverter and structure that were actually installed, taken from the serials logged earlier. Nothing is retyped.

Handover to the customer

The engineer walks the customer through the plant and the checklist. It covers cleaning advice, what an inverter alarm looks like and whom to call. The customer signs, on paper or on a phone, and the signed copy is attached to the site folder. Questions are answered on the spot.

What closes the job

A commissioned plant starts its warranty dates, creates the first service reminder and releases the handover invoice. The job is then closed and filed with its photos and readings. It stays searchable.

What commissioning does not do

  • It does not replace any inspection or sign-off that the DISCOM requires.
  • The readings are entered by your engineer. The system does not measure anything.
  • Which readings your checklist needs is decided with you.
  • Remote monitoring data stays in the inverter maker’s own portal.

What happens between the last panel and the first unit generated

Switching on is a sequence, not a moment. The order matters for safety and for the file that follows.

Visual and mechanical check

Clamps, cable routing, labels and earthing are looked at before power is applied.

Electrical readings

Open-circuit string voltage, insulation and earth values are taken and entered with the instrument used.

Inverter start and grid sync

The inverter is configured, started and watched until it settles on the grid.

Photos for the file

Panels, inverter, meter and nameplates are photographed, because DISCOM and subsidy files ask for those photographs.

Commissioning papers other offices may ask for

Public portals and utilities want evidence that the plant was built and tested. Rules differ by state and scheme.

  • A commissioning report with photographs, uploaded to the scheme portal where one applies.
  • Presence of the customer and engineer at the DISCOM inspection, which helps avoid a repeat visit.
  • An electrical inspector’s certificate in states that ask for one.
  • Meter installation by the DISCOM after inspection, with a wait that varies.

Questions about commissioning records

Handover is the last chance to get the paperwork right.

  • Can the commissioning sheet differ for on-grid, off-grid and hybrid plants?
  • Do the serials on the sheet come from stock records?
  • Can the customer’s signature be captured on a phone?
  • What starts automatically when a job is closed?

A plant’s last week before handover

The last days of a rooftop solar job pull in the site engineer, the customer and the office. Each reads the commissioning and handover records for a different purpose. Following one plant shows who opens what. Paper gaps cost money.

Engineer on the roof

With the inverter powered, the commissioning sheet is filled in from a phone. String readings, inverter settings and the monitoring login are noted. Photos of nameplates are attached. Roof time is precious. Every minute counts up there.

Office checks the sheet

The back office opens the sheet the same day. Missing readings are flagged and the engineer is asked to add them. A job does not move to handover with blanks in the record. Gaps get fixed early.

With the customer

Engineer and customer walk through the checklist and the monitoring app together. Each item is ticked as it is explained. Signing happens on the screen, and a copy is sent across. Questions are answered there and then.

Closing the job

Once the signed handover is on file, the coordinator marks the job closed. Warranty papers are attached. The first service reminder is set from that date. Nothing hangs open after the customer has signed. Loose ends are rare.

Decisions to make before commissioning sheets are used

A commissioning record helps only if every engineer fills in the same things. Before the first plant is switched on, the company should settle the sheet’s contents and who may close a job. Keep the answers short. Keep each answer short.

Readings that must be taken

List the measurements every engineer records, such as voltage, current and insulation checks. Keep the list short enough to finish on a roof. Anything left out is added as a note, not skipped silently. Be realistic.

Who signs off

Decide whether the engineer alone signs the sheet or a supervisor reviews it first. A second look catches missing values. The reviewer’s name is saved against the job. Accountability then has a face. Two pairs of eyes help.

Jobs already switched on

Plants commissioned before the system began need a short record. Enter capacity, date and monitoring login. Leave out detailed readings that were never captured, rather than invent them. Honest gaps are better than made-up figures.

The first alert to set

Choose between a list of plants awaiting handover signatures and one of commissioning sheets with blanks. Start with the list that holds up billing. The other follows once the sheet is in daily use. Money follows paper.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Commissioning papers other offices may ask for

Who decides whether a failed result blocks the next step?

For “Commissioning papers other offices may ask for”, bring an accepted result and a failed one. Agree who can authorise an exception and what evidence must accompany that decision.

Background reading: ERPNext: inspection criteria

FAQ

Frequently asked questions

Can the customer sign on a phone?

Yes. The engineer can capture the signature on a handset or tablet, or scan a paper copy afterwards. Both copies are kept.

Does the checklist differ by plant type?

Yes. On-grid, off-grid and hybrid plants have separate sheets, since the tests and settings are not the same.

Is the warranty start date set here?

Warranty dates run from the commissioning date unless your suppliers count from another date, which is set with you.

Can a handover pack be printed?

The sheet, the serial list and the service contact can be printed as one pack for the customer.

What if the plant is ready but the meter is not?

The job stays open with a clear note on what is waiting. The crew’s work is complete, and the file shows the pending item with its date.

Is generation data stored here?

No. Live generation stays in the inverter maker’s portal. This record holds the login you gave the customer and the readings taken on the day.

Where it fits

How this feature fits the system.

Solar Installation Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Proposals and quotations

Sales engineers size the plant in kW, choose panels, inverter and structure, and issue a priced proposal with every revision kept against the enquiry.

Estimate/Quotation Management

Material and serial numbers

Panels, inverters, structures, cables and protection items are tracked in stock, and panel and inverter serial numbers are tied to the job.

Batch and Serial Tracking

Service visits and AMC

Cleaning, inspection and fault visits are booked per plant, with each annual maintenance contract and its renewal date tracked, so a lapsing contract gets a call.

AMC and Service Contracts
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements