Enquiry and Site Survey Records for Rooftop Solar Installers
Each enquiry gets a record, a surveyor and a survey sheet. Roof details, shadow notes, sanctioned load and photos are held against the customer, ready for the proposal that follows.
From the first call to a survey visit
What the survey sheet holds
The surveyor fills the sheet on a phone at the roof. Nothing needs to be copied from a notebook later.
What happens next
A completed survey opens the proposal screen with the roof details already filled in. The proposal writer works from the sheet and does not need to call the surveyor to ask what was seen.
What the survey sheet does not do
- It does not size the plant by itself. That is done in the proposal.
- It does not judge whether a roof is structurally sound. The surveyor’s view is recorded.
- The fields on the sheet are set with you, to match how your surveyors work today.
- Drone or shadow-analysis tools are outside the product unless scoped separately.
What a survey must settle before a quotation
A survey visit has one purpose. It gives the proposal team numbers they can trust.
Why enquiries need a clear owner
Leads go cold fast. A caller who is not answered in a day will ring another installer.
- Each enquiry is assigned to one person.
- A date is set for the next call.
- Lost enquiries carry a reason, such as price or a competitor.
- Source tags show whether leads come from referrals, walk-ins or ads.
Questions about survey sheets on a roof
Surveyors work on roofs with poor signal and bright sunlight.
- Does the sheet work when there is no network?
- Can photos be taken inside the form?
- Can the sheet show missing fields before it is saved?
- Does the survey feed the proposal without retyping?
An enquiry from call to roof visit
An enquiry changes hands several times before a roof is measured. The record keeps each hand-off visible, so a caller is never asked the same question twice. Nothing gets repeated. Here is how an ordinary day treats it from the first ring to the evening follow-up.
Choices to make before survey sheets start
A survey sheet is only useful if every visitor fills it the same way. The owner settles the compulsory fields, who owns each enquiry and when a quiet lead is called lost. Decide these before the first visit, not after.
Agree the evidence before signing off this part.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
What a survey must settle before a quotation
Which assumptions stop being valid when the quotation changes?
For “What a survey must settle before a quotation”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.
Background reading: ERPNext: quotation terms
Frequently asked questions
Can a surveyor fill the sheet without a network?
What works offline is confirmed during scoping. Signal on a roof is poor in places, so the surveyor can note details and upload photos once back in coverage.
Are survey photos kept with the customer?
Yes. Photos stay on the survey sheet, and they are visible later to the proposal writer and the installation crew.
Can enquiries be split by source?
Yes. Each enquiry carries its source, which tells the owner which referral or channel brings jobs that reach installation. The source list is yours to define.
Can the survey sheet match our own checklist?
Fields are set up around the questions your surveyors already ask, and our team changes them on request.
How long should a survey take?
That depends on roof size and access. A small home roof is quick, while a large factory roof may need more than one visit.
Should the customer be present?
Yes, where possible. They can show where the meter sits, which areas stay clear and who gives roof access.
How this feature fits the system.
Solar Installation Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Proposals and quotations
Sales engineers size the plant in kW, choose panels, inverter and structure, and issue a priced proposal with every revision kept against the enquiry.
Estimate/Quotation ManagementMaterial and serial numbers
Panels, inverters, structures, cables and protection items are tracked in stock, and panel and inverter serial numbers are tied to the job.
Batch and Serial TrackingService visits and AMC
Cleaning, inspection and fault visits are booked per plant, with each annual maintenance contract and its renewal date tracked, so a lapsing contract gets a call.
AMC and Service ContractsTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements