Reports for Solar Installer Owners and Managers

These reports come from the surveys, stages, files, invoices and visits that the team already records. Owners and managers read them to see where jobs, money and service work stand.

The reports

Each report reads the live records, so it changes as entries are made.

Enquiries, surveys and proposals

Counts by stage and by source, together with the proposals that are still waiting for a customer’s answer after the survey was done. The enquiry, survey and proposal modules feed it.

Jobs by installation stage

Roofs at structure, mounting, wiring and commissioning, with the crew assigned to each one and the date the last stage was closed from site. Stage tracking feeds it. Delays show early.

Net-metering and subsidy files pending

Files listed by the office or person holding them, with the days since the last movement and the documents still missing from the customer. File tracking is the source.

Stock and shortfall for open jobs

Panels, inverters and balance-of-system items held in each godown, set against what the open jobs need before the crews leave. Material and serial tracking is the source.

Payments received and due

Invoices raised, receipts recorded and balances by job. Billing is the source. Balances are plain.

Service visits and AMC renewals

Visits due this month, overdue contracts and plants with no visit recorded. Service records feed it.

Warranty dates by supplier and serial

Cover running out soon, and open claims by supplier. It comes from the warranty register.

Who acts on each solar report

The sales lead works from proposals pending. The site supervisor reads jobs by stage and the shortfall list. The paperwork clerk chases files, and accounts follow balances. The service desk works from visits due. Each has a clear owner.

What the figures reflect

Reports show only what staff have entered, and nothing more. A stage that was not closed on the phone looks as if it is still open. A report with gaps points to a step that was never entered.

What the solar reports do not do

  • They do not forecast demand, savings or subsidy amounts.
  • Extra reports can be added where the data is held in the system.
  • Tax and statutory returns remain with your accountant.
  • Which figures an owner wants on a daily screen is decided with you.

Questions an installer’s owner asks each week

A dashboard works when it answers questions someone already has.

Where is my money stuck?

Invoices due, subsidy awaited and advances not yet raised.

Which files are behind?

Applications with no movement past a fixed count of days.

What do I need to buy?

Shortfall of panels, inverters and structure against jobs about to start.

Which customers are due a visit?

AMC visits and renewals for the coming weeks.

Reading the figures with care

Numbers reflect entries. They mirror habits.

  • Late data entry makes stock look short.
  • Jobs without a close date inflate open counts.
  • A file with no recorded owner is invisible to the follow-up list.
  • Compare months only when the team used the same practice.

Questions about solar reports before you buy

Reports differ more in detail than in headline.

  • Can I filter by branch, surveyor or crew?
  • Can the report show what sits behind a number?
  • Can I get the data in a spreadsheet?
  • Can a new report be added later?

Reading solar reports through the week

The reports only matter when somebody reads them at a fixed moment and then acts. Different roles open different pages on different days. Here is a working week seen through the figures, from Monday’s pipeline to the month-end review. Habits form here.

Monday, the owner’s first look

At the desk, the owner opens enquiries, surveys and proposals sent last week and sees where the pipeline narrowed. One number is worth a question. The sales lead is asked about it before ten o’clock, while the week is still young.

Tuesday, the site supervisor

The supervisor reads the stage report and spots two jobs stuck at wiring. Both belong to one crew. A call to that crew leader finds the cause, which is a late cable delivery from the supplier’s store.

Thursday, billing and dues

The clerk opens the money due report, sorted by days overdue. Larger balances are called first. Each call is noted on the job, so the next person who rings knows what was said and what was promised.

Month end, a closer read

The owner compares completed installations, files pending with the utility and service visits made. A drop in one line sends a question to its owner. The reports start conversations. Decisions come from those talks, held in person.

Setting up reports before you rely on them

Before the dashboard is trusted, the owner decides which figures matter, who reads each one and how gaps in the underlying data are handled. Settle these first. Then switch on the dashboard for everyone.

Choosing the first three reports

Start with the reports that answer this week’s worries, perhaps pending files, money due and stages behind plan. Add more once these are read every week. A crowded dashboard is soon ignored by everyone in the office.

Who is accountable for each figure

Give each report a named reader. A number with no owner gets admired and forgotten. When the reader is known, a bad figure produces a call within the day. That is the whole point of naming one.

Fixing missing entries first

If surveys are not logged, the conversion figure is meaningless. Decide which records must be complete before a report is used in a meeting. Say so out loud. People will then fill the gaps without being asked twice.

Deciding what a bad week looks like

Agree in advance which movement is a warning, such as files untouched for too long. Write it beside the report. Otherwise each reader sets a private threshold and arguments follow. Put the threshold where all can see it.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Questions about solar reports before you buy

What does one row mean before totals are combined?

Choose one period in “Questions about solar reports before you buy” and compare it with the source records. Define the date basis and grouping before accepting a total that combines several kinds of entry.

Background reading: Microsoft: reporting grain and relationships

Service visits and AMC renewals

What proves that a planned task was actually completed?

Select an overdue entry in “Service visits and AMC renewals”. Ask which work record closes it and what remains visible when the visit is postponed or only part of the job is done.

Background reading: ERPNext: maintenance plans

FAQ

Frequently asked questions

Are the figures live?

Yes. Reports read the current records, so they change as entries are made. Nothing is refreshed by hand.

Can reports be limited to one office?

Yes. A manager’s view can be held to one office, while owners see every office together.

Can I export a report?

Reports can be downloaded as a spreadsheet for sharing with an accountant or a partner.

Can a report for our own question be added?

Where the data exists in the system, yes. The new report is scoped and added by our team.

Which report should a new owner read first?

Payments due and files pending. They show money and delays, which are the two things that hurt first.

Can managers see only their branch?

Yes, access can be limited by branch. The owner still reads all branches together.

Where it fits

How this feature fits the system.

Solar Installation Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Proposals and quotations

Sales engineers size the plant in kW, choose panels, inverter and structure, and issue a priced proposal with every revision kept against the enquiry.

Estimate/Quotation Management

Material and serial numbers

Panels, inverters, structures, cables and protection items are tracked in stock, and panel and inverter serial numbers are tied to the job.

Batch and Serial Tracking

Service visits and AMC

Cleaning, inspection and fault visits are booked per plant, with each annual maintenance contract and its renewal date tracked, so a lapsing contract gets a call.

AMC and Service Contracts
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements