Customer and Site Document Records for Solar Installers

Each rooftop site has one folder. It holds the customer’s details, electricity connection particulars, identity and ownership papers, the signed proposal and the photographs taken from survey to handover.

What each site folder holds

Customer details

Name, phone, address of the site and a contact who can give access to the roof are recorded once and used by every later step. Nobody types it twice.

Connection particulars

Consumer number, sanctioned load, phase and the electricity office the connection belongs to are kept where the paperwork team can find them.

Identity and ownership papers

Scans of the documents a DISCOM or a subsidy file may ask for sit in the folder, with a mark for those still missing. Gaps are marked.

Signed proposal and drawings

The accepted proposal, the layout and any single-line diagram are attached, so the crew works from the same version.

Site photographs

Survey, installation and handover photos are stored in order and tagged with the stage in which they were taken.

Who opens the folder

The paperwork clerk checks which papers are missing before filing. A service technician opens it years later to see what was fitted. The owner can look up any site by customer name or phone number. Each person opens only what the job needs.

Missing papers

A document checklist per job shows what is held and what is not. Files stall when a customer’s paper is absent, so the list is visible to the person who calls the customer.

What the folder does not do

  • It stores scans. It does not verify that a document is genuine.
  • Which papers a DISCOM or a scheme asks for is confirmed with you during scoping.
  • Customer privacy rules for your business are for you and your advisor to decide.
  • Paper originals still need to be kept where your office keeps them.

How a document file goes wrong

Most solar delays are paperwork delays. A scan is blurred, a name differs between two papers or an ownership proof is missing.

Name mismatch

The electricity bill carries one spelling and the identity card another. The folder lets the clerk see both side by side before filing.

Tenant or co-owner

The person signing may not own the roof. Consent papers are filed with the case.

Housing society roofs

Flats on a shared terrace need the society’s permission, which is a separate paper.

Old connection details

A bill from two years ago may show a changed load. The latest copy is kept.

Keeping photos useful

Pictures taken on a roof become evidence later. A photo with no stage tag is hard to use.

  • Tag each photo as survey, installation or handover.
  • Take wide shots and close shots of nameplates.
  • Keep an array photo, an inverter photo and a meter photo.
  • Add a note when a photo shows a defect found and fixed.

Questions about holding customer scans

Files hold personal data and need care.

  • Who can see identity scans?
  • Can staff download files, or only view them?
  • Can a customer’s documents be removed on request?
  • How are scans from old registers brought in?

Site folders through a week of installs

Paperwork follows the roof, from first call to handover. Every file has a home. Different people open the same folder at different moments, and each adds or reads one thing. This is how a working week passes through it, from Monday sorting to Friday review.

Monday, sorting new enquiries

Before crews leave, the coordinator opens each new site folder and ticks what the customer has already sent. Gaps go on the day’s call list. The survey team then avoids a wasted trip to a roof with no ownership proof.

Tuesday, on the roof

The surveyor photographs the roof edge, the meter board and the shaded corner, then attaches the pictures before leaving the gate. Back at the desk, the draftsperson works from those images. No second visit follows.

Wednesday, a customer calls

A homeowner rings to ask which signed copy was filed. Whoever answers searches by phone number and reads out the proposal version. The caller gets a plain answer. Nobody is put on hold while a cupboard is searched.

Friday, closing the week

The manager scans folders still marked incomplete and sees which papers are missing against each job. Those names go to the caller. Monday then begins with a clear call list, not guesses or memory of who said what.

What to settle before folders go live

Before the first site folder is created in the system, the owner decides who adds papers, who removes them and how older files come across. Settle these early. Write them down.

Who may add or replace a paper

Choose which roles upload and which only read. A replaced scan should leave a visible note. Otherwise a corrected ownership proof could quietly overwrite the version the customer originally signed, and nobody in the office would ever know.

What a complete folder means

Write down the papers every job must hold before a survey is booked, plus extras for rented or shared roofs. That list becomes the checklist. Without it, each coordinator applies a private idea of what done looks like.

Bringing across the old files

Decide whether past customers get folders at all. An installer might load only active jobs and the latest handovers. Older paper stays in the cupboard. The folder simply records where that paper sits, so someone can find it.

Which photos are mandatory

Agree the stage pictures every job must carry, such as the meter, the array and the earthing pit. Name them in the checklist. A shared list stops crews guessing what the office wants to see months later.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

What each site folder holds

Which observation would change the proposed scope?

For “What each site folder holds”, observe someone completing the task with a representative example. Record where they stop, ask another person or re-enter information, then choose the smallest change whose result the team can verify.

Background reading: GOV.UK: researching user needs

FAQ

Frequently asked questions

Can photos be added from a phone?

Yes. Surveyors and crews attach photos from site, and each one is placed in the folder against the job.

Is there a list of papers needed for each job?

Yes. The checklist is set with you, and a job shows which papers are still to come. Missing papers are flagged.

Can a customer with two sites have two folders?

One customer record can hold several sites, each with its own folder and plant.

Can old customer files be loaded?

Existing scans and registers are brought in during migration, and the office checks them over ahead of launch.

Can a clerk see what is missing across all jobs?

A list shows jobs with missing papers, sorted by how long they have waited. The clerk can work through it each morning.

What about original papers held by the customer?

The system holds scans. Originals stay with whoever holds them, and the folder can note where each original is kept.

Where it fits

How this feature fits the system.

Solar Installation Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Proposals and quotations

Sales engineers size the plant in kW, choose panels, inverter and structure, and issue a priced proposal with every revision kept against the enquiry.

Estimate/Quotation Management

Material and serial numbers

Panels, inverters, structures, cables and protection items are tracked in stock, and panel and inverter serial numbers are tied to the job.

Batch and Serial Tracking

Service visits and AMC

Cleaning, inspection and fault visits are booked per plant, with each annual maintenance contract and its renewal date tracked, so a lapsing contract gets a call.

AMC and Service Contracts
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements