Installation Stage Tracking for Rooftop Solar Crews
Each accepted job is split into stages such as structure, panel mounting, DC and AC wiring and earthing. Crews close stages from a phone, with photos, so the office sees where every roof stands.
Stages on a rooftop job
What the office sees
The board lists jobs by stage, which shows the owner how many roofs are at structure and how many are waiting for wiring. When material holds a job up, the board names the missing item. Customers asking for an update get an answer from the screen. The screen is the status report.
Next step
When the last installation stage closes, the job moves to commissioning and the paperwork team is told. The invoice for the stage payment can be raised from the same job. Billing follows the roof.
What the client decides
- The stages and their order for each plant type
- The photo or reading each stage must carry before it closes
- Who may reopen a closed stage
- Whether crews are your own staff or hired labour teams
What each stage must prove before the next begins
A stage closes when its work can be seen and checked. Closing it on trust causes rework.
When the weather, the roof or the customer delays work
Rooftop work depends on rain, access and a customer who may not be home.
- Delay reasons are recorded against the stage.
- A rain day is separate from a material delay.
- Rescheduled dates stay visible to the office.
- A customer who changes the layout triggers a revision, not a quiet change.
Questions about crew stage closing
Stages look simple on paper and awkward in practice.
- Can I define stages for each plant type?
- Can a crew close a stage with photos from a phone?
- Can a failed inspection reopen a stage?
- Can the office see crews by day?
A crew day on a rooftop job
Stage tracking is used by the crew leader on the roof and by the office at the desk. One closes a stage and the other reacts to it. Here is a single day, seen from both ends of the phone. It starts early.
Rules to set before crews close stages
Stage closing only works if everyone means the same thing by done. Before rollout, the owner defines each stage, who may close it and what proof is demanded. These choices protect the crew. They protect the customer too, and the owner.
Agree the evidence before signing off this part.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
Next step
Can you explain the balance from its original documents?
Select a partly settled example in “Next step”. Ask for the invoice, allocated receipts and remaining balance to be shown together before agreeing the opening figures.
Background reading: ERPNext: outstanding invoices
Frequently asked questions
Can a subcontracted crew update stages?
Yes. A subcontractor’s team can be given its own login limited to the jobs assigned to it. Other jobs stay hidden from that team.
Does it track labour cost?
Not by default. Crew day rates or piece rates can be added during scoping if you pay by the job.
Can the stages differ for a hybrid plant?
Yes. Each plant type has its own stage list, so a hybrid job includes battery steps that an on-grid job does not.
What if a stage fails inspection?
The stage is reopened with a note, and the crew sees what must be corrected before the job moves on.
Can the customer follow progress?
That is your choice. Some installers send a short message at each stage, while others keep the view internal.
What if a crew skips a stage in the system?
The next stage can be blocked until the earlier one is closed. The owner decides whether that rule is strict or advisory.
How this feature fits the system.
Solar Installation Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Proposals and quotations
Sales engineers size the plant in kW, choose panels, inverter and structure, and issue a priced proposal with every revision kept against the enquiry.
Estimate/Quotation ManagementMaterial and serial numbers
Panels, inverters, structures, cables and protection items are tracked in stock, and panel and inverter serial numbers are tied to the job.
Batch and Serial TrackingService visits and AMC
Cleaning, inspection and fault visits are booked per plant, with each annual maintenance contract and its renewal date tracked, so a lapsing contract gets a call.
AMC and Service ContractsTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements