Skip to main content
GullySystem

Proposals and Quotations for Rooftop Solar Installers

The proposal screen starts from the survey and builds a priced quotation for a rooftop plant. Panels, inverter, structure and extras come from your own price list, and each revision stays on the enquiry.

Building the proposal

System size

The plant capacity is chosen from the roof area, the sanctioned load and what the customer wants to offset. The sheet shows the number of panels it implies.

Bill of material

Panels, inverter, mounting structure, cables, earthing, protection items and meter work are added as lines from your price list.

Options

One enquiry can carry a smaller and a larger plant, or two inverter brands. The customer compares them from one document.

Terms and payment stages

Validity, warranty text and the advance and stage payments you ask for are placed on the proposal.

Revisions and acceptance

Customers ask for changes. Each version is saved with its date, so the one the customer accepted is the one the installation crew sees. A signed or confirmed proposal turns into a job.

What the client sets up

  • Panel, inverter and structure items with the prices you use
  • Standard packages for homes and for small businesses
  • Warranty and payment wording for the proposal
  • Who may change a price or give a discount

What the proposal does not do

The proposal records your pricing. It does not decide the subsidy a customer will receive, and it does not state savings as a promise. Those depend on the scheme and the customer’s tariff, which the client confirms.

What a customer compares

Customers read three or four proposals side by side. Differences in detail decide the choice.

Capacity and brand

Plant size, panel type and inverter brand, with the warranty each maker offers.

Structure and mounting

Height, material and wind provisions. Compare this line when a quote looks cheap.

Scope

Who handles net-metering paperwork, subsidy filing and meter charges.

Payment terms

How much is paid up front, and what is held back.

Showing savings without overpromising

A saving figure is a forecast. Customers remember it.

  • State the assumptions: tariff, usage and sunlight.
  • Avoid promising a payback date.
  • Describe the figure as an estimate based on the survey.
  • Let the customer see how a change in usage shifts the result.

Questions about proposal speed

Speed and clarity decide who wins the job.

  • Can a proposal be produced from the survey in minutes?
  • Can I show two plant sizes side by side?
  • Can prices be hidden from the surveyor?
  • Can a discount be restricted to approved users?

Proposals handled across a sales day

A proposal passes between the estimator, the sales lead and the customer more than once. Each pass changes the figures slightly. These moments show how the screen is used when a quotation is live. Follow one quotation from draft to acceptance.

After the survey, a first draft

The estimator opens the survey and picks panels and inverter from the price list. The system adds the extras. A first quotation is ready for review before the customer has finished tea. Quick and uncomplicated.

The sales lead reviews

Before anything leaves the office, the lead checks margin and wording. A discount over the agreed limit needs approval, noted on the record. The customer never sees a figure the owner has not seen. Control stays visible.

The customer asks for a change

A homeowner wants a bigger system. The estimator creates a revision from the first version, and both remain on file. Both versions sit side by side, so the customer compares them without confusion over which is current or who sent it.

Acceptance and handover to the crew

Once the customer accepts, the quotation closes and a job opens with the same figures. The crew and the billing clerk work from that one record. Nobody retypes the price. Figures arrive exactly as accepted.

Rules to set before proposals are sent

A fast proposal screen can send bad numbers faster. Before the team starts, the owner settles the price list, discount limits and what each quotation must state. These choices keep proposals consistent between salespeople. Agree them with the owner first.

Who maintains the price list

Pick one person to update component prices when suppliers change them. Everyone else reads only. A price list edited by five people quietly produces five different quotations for the same house within a single week.

Discount limits and approval

Set the discount each role may give without asking. Beyond that, the owner approves. State the limit in the system.

What every quotation must state

Decide the lines every proposal carries, such as system size, component makes, warranty periods and payment stages. A fixed layout reduces disputes. It also lets customers compare your offer with another installer’s without much effort.

How long a quotation stays valid

Choose a validity period and display it. Component prices move, and a stale quotation becomes an unfair promise. An expiry date lets the sales lead reprice calmly instead of arguing. Name the date on the first page.

Make an informed decision

Questions to settle before rollout.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Revisions and acceptance

Which version applies to work that has already started?

Use a revised example from “Revisions and acceptance” in the demonstration. Identify work still using the earlier version before deciding which jobs should change.

Background reading: Odoo: controlled product changes

Proposals and Quotations for Rooftop Solar Installers

Which assumptions stop being valid when the quotation changes?

For “Proposals and Quotations for Rooftop Solar Installers”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.

Background reading: ERPNext: quotation terms

FAQ

Frequently asked questions

Can the price list be updated when supplier rates change?

Yes. Our team updates item prices on request, and proposals already issued keep the prices they were made with.

Does the proposal show expected savings?

Only when you choose to. Any figure is entered or approved by you, because tariffs and usage differ for every customer.

Can a discount need approval?

Yes. Discounts above a limit you set can be held for the owner before the proposal goes out.

What happens to a proposal that is not accepted?

It stays on the enquiry with its status. The sales team can return to it later without writing it again.

Should I send a PDF or a link?

Either works. A PDF is easy to forward and a link can show the latest revision. Send the PDF and keep each revision on file.

Can the proposal mention subsidy?

It can, as a note about what the scheme may offer. Eligibility and amounts come from official sources and change, so the wording is chosen with care.

Where it fits

How this feature fits the system.

Solar Installation Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Proposals and quotations

Sales engineers size the plant in kW, choose panels, inverter and structure, and issue a priced proposal with every revision kept against the enquiry.

Estimate/Quotation Management

Material and serial numbers

Panels, inverters, structures, cables and protection items are tracked in stock, and panel and inverter serial numbers are tied to the job.

Batch and Serial Tracking

Service visits and AMC

Cleaning, inspection and fault visits are booked per plant, with each annual maintenance contract and its renewal date tracked, so a lapsing contract gets a call.

AMC and Service Contracts
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements