Skip to main content
GullySystem

Quality Control Records for Pathology Labs

Daily control runs are recorded by test, machine and control lot. Each run is plotted against the limits the lab has set, and failed runs carry a note of what was done. The control material, the machine, the lot in use and the person who ran it are kept together, so a run can be looked at again months later.

Recording a run

The entry takes a minute at the bench. It replaces a paper register that sits in a drawer until the assessor asks for it.

Machine and test

Which analyser or bench, and which tests the control covers.

Control lot and level

The control material used, with its lot and level.

Value and limits

The value obtained, shown against the mean and limits the lab entered.

Action taken

For a failed run, what was checked, repeated or recalibrated, and by whom.

Charts and review

Runs for each test are shown as a chart over time. Drift becomes visible early. The lab’s quality officer can review and sign the month’s records. External quality scheme results can be filed alongside them. A quality officer who reads the chart every Monday sees a slow drift long before a rejection happens, which is cheaper than repeating a day’s patient samples.

Control rules, warnings and rejections

Quality texts describe rules that read the chart point by point. A value beyond two standard deviations from the mean serves as a warning. One beyond three means results must not be released until the cause is found. Other rules look for several points on one side of the mean, which suggests a shift. The standard ISO 15189 asks the lab to design its own control procedures and to avoid releasing results when control fails. Which rules apply is the lab’s call, taken with its quality manager and its accreditation body.

  • Warning: check maintenance, reagents and handling, then continue
  • Rejection: stop reporting for that test until the cause is fixed
  • Trend: several points drifting one way, caught before a failure
  • Shift: a sudden move of the mean after a calibration or a new lot

A new reagent lot or a new control lot

A fresh lot changes the picture. Lab procedures commonly verify a new reagent lot against the old one before patient samples are run on it. A new control lot also needs its own mean and limits, established from the lab’s own runs. The record therefore notes the lot in use for each run. When a result is questioned later, the lab can see which lot was on the bench that morning.

Lot change noted

The date a new lot started, against each test.

Limits for the new lot

Entered by the lab once enough runs exist.

Comparison run

Kept as a record before patient work begins.

What QC records leave out

The system keeps the lab’s own quality records. It does not set limits, judge a run on the lab’s behalf, or accredit the lab. A lab that wants a specific rule set enters the limits and writes the rule in its own procedure. That choice sits with its quality officer.

Questions for the quality officer

These choices shape the screen and are best made with the person who answers to the assessor. Having the answers before configuration means the first chart on screen already looks like the one the lab already trusts from its own paper register.

How many control levels per test?

Run two levels. Some tests need three. The lab states which.

Who reviews and signs the month?

Name the reviewer and the cover person.

Where are corrective actions written?

Decide if the action note on the run is enough or a separate form is kept.

How long are records kept?

Retention follows the lab’s own policy and its accreditation body.

A quality control day on the analyser

The technician, the quality officer and the pathologist each read the chart for a different reason. Four moments describe a day in that rhythm. Each run starts clean.

Morning control run

The technician runs the control material on each machine and enters the values by test and lot. Points land on the chart against the lab’s limits. Patient samples wait for a pass. Along the way, the chart starts the day clean.

A point outside the limit

A control falls outside its limit. The technician records what was done, such as a fresh control or a recalibration, and reruns. The failed run and the action stay together. Notes sit beside the failed point.

New reagent lot arrives

The quality officer opens a new reagent lot and the new control values are entered. The chart marks where the lot changed. Later shifts in the points are read against that marker. The change is recorded at once.

The monthly chart review

The quality officer reads each test’s chart for the month with the technicians. Repeated warnings are discussed. A summary goes to the pathologist for the lab’s records. Changes to limits are decided there. A short summary goes to the pathologist.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Control rules, warnings and rejections

Who decides whether a failed result blocks the next step?

For “Control rules, warnings and rejections”, bring an accepted result and a failed one. Agree who can authorise an exception and what evidence must accompany that decision.

Background reading: ERPNext: inspection criteria

FAQ

Frequently asked questions

Can QC values come from the analyser?

Only where interfacing is scoped for that machine model. Otherwise they are typed in.

Does it make the lab NABL ready?

No. It keeps control records the lab uses in its own quality work. Accreditation stays between the lab and the assessing body.

Can I see the chart for one test over a month?

Yes. Runs for each test are shown over time against the limits the lab entered.

Does it decide whether a run has failed?

No. The lab enters its limits and its action. The chart shows where each value sits, and the person on the bench decides.

Can external quality assessment results be stored?

They can be filed alongside the lab’s own control records, as described above.

What happens to patient results when a run fails?

That is a lab procedure. The record shows the failure and the action taken, and the pathologist decides what to hold or repeat.

Where it fits

How this feature fits the system.

Pathology Lab Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Sample collection and barcodes

A barcode prints for every container at collection, recording sample type and time, and the lab marks any rejected sample with a reason.

Barcodes and Labels

Home collection visits

Home collections are booked by area and time slot and assigned to a phlebotomist, and the front desk sees which samples have reached the lab.

Appointment Scheduling

Quality control records

Technologists record daily control runs by test and machine, plot them against limits the lab sets, and note the action taken on a failed run.

Quality Control
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements