Skip to main content
GullySystem

Tile Orders and Part Deliveries to Site

An approved quotation becomes an order, and that order goes out in as many loads as a site needs. Each load carries its own challan and box count.

What the order holds

Lines from the quotation

Tiles by size and box count, sanitaryware by model and fittings by piece, each still grouped under the room they were quoted for.

Reserved boxes

Boxes are held against the order from a chosen lot, so a second buyer is not quoted stock already committed to a site.

Advance and balance

What the buyer has paid, and what is still due. Release a load only against an agreed advance.

Site contact

The address, the floor, and the person at site who will take the delivery and sign the challan.

Loads out of the godown

A picking list prints for each load, naming series, size, lot, box count and the rack to walk to. The loader marks what actually went on the lorry, which is not always what the list asked for. Vehicle number, driver name and the time of despatch are saved with the challan. Where a lorry is hired, the transporter name travels with it too.

Why sites take tiles in parts

Tile work follows the building. Floors wait for the slab and the plumbing, bathrooms come after waterproofing, and a mason will not stack forty boxes in a room still under shuttering. So the showroom ships the hall flooring first and the bathroom set weeks later. Each load is a separate event, and so is each hand-over at site. Stairs, lifts and lane width decide what a lorry can reach, and those details belong on the order.

Paperwork for each load

Public guidance on goods transport describes a delivery challan per vehicle when goods of a single invoice move in parts, and an e-way bill for each vehicle where the rules require one. Whether they apply to your lorries depends on value, distance and current rules. Your accountant decides. The challan on this system keeps its own number, vehicle and box count either way.

Following an order to the end

What the site still awaits

Each order shows ordered, delivered and pending box counts. A site call is answered without opening a file.

Items on company order

A model the godown does not hold is marked as awaited, and the purchase order raised for it is linked.

Closing the order

An order closes when everything has gone out, or when the buyer drops the balance. A dropped line carries the reason it was dropped.

Top-up boxes later

A site asks for four more boxes weeks after. Here the lot that left first is named, so the godown looks there before anywhere else.

Rules to settle with the owner

  • Whether an advance is needed before the first load leaves
  • Who may release a load to a site with dues outstanding
  • Whether freight is charged to the buyer or absorbed
  • How long reserved boxes stay held before returning to free stock
  • Which floors and lanes need a smaller vehicle

When a site says the delivery is wrong

Disputes at site are routine. The mason says six boxes are missing, or a carton is the wrong shade. A signed copy from the day answers most of it: boxes sent, lot printed, vehicle and driver. Where the signature is missing, the driver’s call becomes the only evidence. Make signing the habit. Photograph the unloaded stack when a site is far away, and note any refusal on the challan itself.

Running part deliveries through a working week

A large site order is never one delivery. Follow the order through a week in which the counter, the godown, the driver and the owner each touch it. The steps show who opens the order and what they update. Begin on Monday.

Monday call from the site

The site supervisor wants only first floor tiles. That is fine. The counter opens the approved order and creates a load for those boxes. Simple enough.

Tuesday loading at the godown

The picker reads the load sheet, pulls the boxes and counts them onto the lorry. The count is saved against the load. A box short of the plan is flagged before the lorry leaves. The driver then sets off.

The driver brings back a signed challan

On return the driver hands in the challan signed at site. The counter records the receipt against the load. A complaint about one cracked box is entered there and then, while the details are fresh. The site is told.

The owner checks open orders on Friday

The owner rings one contractor whose second load has not been asked for. A reminder goes to that site. It takes five minutes.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Paperwork for each load

Can a partial delivery be distinguished from a completed order?

For “Paperwork for each load”, follow an example that leaves in more than one trip. Compare the quantity handed over with the quantity still owed before closing the order.

Background reading: ERPNext: delivery notes

Lines from the quotation

Which assumptions stop being valid when the quotation changes?

For “Lines from the quotation”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.

Background reading: ERPNext: quotation terms

FAQ

Frequently asked questions

Can one order have five deliveries?

Yes. There is no limit on loads, and each one carries its own challan, vehicle and box count.

Does a challan print for the lorry?

Yes. It prints with the site address, the lines on that load and space for a site signature.

What if the loader sends fewer boxes?

Whatever went out is recorded on the challan. Then the order shows the shortfall as still pending for that site.

Can an order be changed after approval?

Yes, until it closes. Lines can be added or dropped, and the reserved boxes move with the change.

How do I tell the site what is still pending?

Open the order. Ordered, delivered and pending box counts show by line, so the answer is ready before you pick up the phone.

Should a buyer pay in full before delivery?

That is a commercial choice. Some showrooms take an advance per load, others bill on completion. The order can hold either rule.

What happens to reserved boxes if the site cancels?

The unused reservation is released back to free stock when the line is dropped, and the reason is kept.

Where it fits

How this feature fits the system.

Tile and Sanitaryware Showroom Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Room-wise quotations

Sales staff quote bathroom, kitchen, hall and balcony separately, placing tiles, sanitaryware and fittings under each room, with every revision kept.

Estimate/Quotation Management

Shade lot and batch records

Receiving staff enter the lot number of each series as a truckload arrives, so a buyer’s boxes are reserved from one lot.

Batch and Serial Tracking

Warehouse and display stock

Warehouse staff count boxes by rack and bay, keep display pieces apart from sellable stock and watch series that fall below reorder level.

Warehouse Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements