Skip to main content
GullySystem

Tile Shade Lot and Batch Records

Two boxes of one design from different production lots do not match on a floor. This module keeps the lot number with the stock and with the order.

Where a lot number comes from

On arrival

A truckload from the company carries boxes printed with a batch or lot code. Godown staff enter that code against the series and size as the load comes off.

Shade and calibre

Beside the lot, the shade name and the calibre or thickness class printed on the box go in, because both change how a laid floor reads.

Boxes counted by lot

Stock sits under the series and size, split by lot. One lot may hold plenty while another is down to a handful.

Why lots differ

Tile factories fire in production runs and group output into coded lots. Raw materials and kiln conditions shift between runs, so two lots of one design can read slightly different once laid. Trade advice is steady on this: take everything for a job from one lot, and buy spares from that lot in the same purchase. Samples shown at the counter may not match later stock either. Some surfaces are made to vary on purpose, and makers publish a variation rating for them.

Reserving boxes for a site

On confirming an order, the boxes are held from a single lot wherever enough of that lot remains. If a site needs more than one lot can cover, the counter is shown the split before anything leaves the godown. The buyer can then take a mixed lot, wait for the next company load, or put the second lot where the difference shows least.

What the lot record is used for

Topping up a short delivery

A site asks for four more boxes a week later. The order names the lot that went out, so the godown looks there first.

Complaints after laying

Where a floor shows shade variation, the invoice and the challan name the lots delivered. A complaint to the company goes out carrying those codes.

Old lots sitting in the godown

Boxes of a lot that has stopped moving stand out in the stock list, and the owner decides what to do with them.

Honest answers at the counter

When only one lot is left, the counter reads the count before quoting and says so.

A habit that keeps lots clean

Habits matter more than screens here. Enter the lot at unloading, not three days later. Rack each lot together. Never open a carton from a second lot to top up a first. And print both codes on the challan when a load mixes lots. A few boxes of mismatch can ruin a bathroom wall, and that single wall is what the buyer remembers.

What shade records leave out

These limits are deliberate. The lot record is a memory aid for the godown and the counter, not a judge of colour.

  • It does not read a lot code off a box unless someone enters or scans it
  • It does not judge whether two lots will look alike once laid
  • It does not block a mixed-lot delivery, and only shows that one is happening
  • It does not settle a shade complaint with the company on your behalf

Lot records through a delivery week

Follow one shade from the truck door to the floor of a customer’s flat. Each step shows who reads or records the lot and what they decide. Watch the number.

A truck is unloaded

The godown supervisor reads the lot printed on each carton and keys it against the rack. Two lots of one design stay apart. Each gets its own shelf. The receipt shows both, with box counts under each.

The counter reserves for a site

A buyer needs sixty boxes for one flat. The counter picks a single lot with enough stock and reserves it for that site. Another buyer sees the same design but a different lot. Nobody is promised a blend.

A top-up order arrives later

Weeks on, the contractor wants ten more boxes. Staff open the earlier order, read its lot and check stock for that lot first. If it is gone, the buyer hears so before paying. Nobody is left guessing.

A shade complaint is traced

A site reports a visible mismatch on one wall. The owner opens the delivery and reads the lot on each load. The records show the boxes came from two lots. The talk with the supplier starts with facts.

Rules to agree before lots are recorded

Lot tracking only works when every person follows the same habit. Settle who keys the lot, how mixed stock is treated and what happens to old boxes. These rules are quick to agree and slow to repair later. Decide them now.

Who keys the lot number

Name the person who reads the carton and types the lot at receipt. One person, one habit. If anyone may type it, spellings drift and a search for a lot finds only half the boxes.

What happens to opened boxes

Decide how partly used boxes are recorded. Some showrooms hold them as loose stock under the original lot. Others write them off. Either choice is fine. Pick one so the count at the rack stays honest.

Loading lots for existing stock

Agree how current boxes get a lot. Walk the godown rack by rack and read the carton. Where the print is gone, record an unknown lot so those boxes are never mixed into an order silently.

Which lot warning the counter sees

Choose when staff are warned, such as an order that needs more boxes than one lot holds. Keep the warning to that single case. A warning that fires on everything is ignored within a week.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Where a lot number comes from

Which observation would change the proposed scope?

For “Where a lot number comes from”, observe someone completing the task with a representative example. Record where they stop, ask another person or re-enter information, then choose the smallest change whose result the team can verify.

Background reading: GOV.UK: researching user needs

FAQ

Frequently asked questions

Must every box be scanned?

No. Lot codes go in for a series and size as the load is unloaded, not box by box.

What if only one lot is left?

The counter reads the box count for that lot before quoting, and can tell the buyer what is really available.

Can a delivery mix two lots?

Yes, where the buyer agrees to it. The challan prints both codes, so the site knows what it took in.

Is calibre kept as well as shade?

Yes, where your boxes print it. How closely calibre is followed is settled with you at implementation.

Why do tiles of the same design look different?

They may come from different production lots. Factories code each lot, and small colour or size differences between lots are normal. That is why one lot per job is the usual advice.

Do I need to keep a spare box?

Many buyers do. Take it from the same lot as the job, since a later purchase may come from another.

Can I find which site got which lot?

Yes. The challan and the invoice carry the lot codes, so the search starts from the site or from the lot.

Where it fits

How this feature fits the system.

Tile and Sanitaryware Showroom Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Room-wise quotations

Sales staff quote bathroom, kitchen, hall and balcony separately, placing tiles, sanitaryware and fittings under each room, with every revision kept.

Estimate/Quotation Management

Shade lot and batch records

Receiving staff enter the lot number of each series as a truckload arrives, so a buyer’s boxes are reserved from one lot.

Batch and Serial Tracking

Warehouse and display stock

Warehouse staff count boxes by rack and bay, keep display pieces apart from sellable stock and watch series that fall below reorder level.

Warehouse Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements